docs(phase-31): complete phase execution and verification

This commit is contained in:
2026-04-12 20:19:10 +02:00
parent ff01410183
commit b355c333e5
3 changed files with 69 additions and 10 deletions

View File

@@ -83,7 +83,7 @@
- [x] **Phase 28: Profile & Logto Integration** — Fix profile page, integrate Logto for profile management, customize login branding, configure email verification (completed 2026-04-12)
- [x] **Phase 29: Image Presentation** — Fit-within framing with letterbox/pillarbox instead of hard crops, optional crop positioning (completed 2026-04-12)
- [ ] **Phase 30: Onboarding Redesign** — Catalog-driven onboarding replacing manual entry, visual refresh to match current UI (promotes 999.2)
- [ ] **Phase 31: Mobile Polish** — Icon-based action buttons on item views, small UX improvements
- [x] **Phase 31: Mobile Polish** — Icon-based action buttons on item views, small UX improvements (completed 2026-04-12)
### v2.3 Global & Social Ready (Planned)
@@ -259,7 +259,7 @@ Plans:
| 28. Profile & Logto Integration | v2.2 | 3/3 | Complete | 2026-04-12 |
| 29. Image Presentation | v2.2 | 4/4 | Complete | 2026-04-12 |
| 30. Onboarding Redesign | v2.2 | TBD | Pending | — |
| 31. Mobile Polish | v2.2 | TBD | Pending | — |
| 31. Mobile Polish | v2.2 | 2/2 | Complete | 2026-04-12 |
| 32. Setup Sharing System | v2.3 | TBD | Pending | — |
| 33. Currency System | v2.3 | TBD | Pending | — |
| 34. i18n Foundation | v2.3 | TBD | Pending | — |