docs: create milestone v1.3 roadmap (4 phases)

This commit is contained in:
2026-03-16 21:14:53 +01:00
parent e44807fd37
commit b43472b09a
3 changed files with 110 additions and 24 deletions

View File

@@ -68,24 +68,24 @@ Which phases cover which requirements. Updated during roadmap creation.
| Requirement | Phase | Status | | Requirement | Phase | Status |
|-------------|-------|--------| |-------------|-------|--------|
| COMP-01 | | Pending | | COMP-01 | Phase 12 | Pending |
| COMP-02 | | Pending | | COMP-02 | Phase 12 | Pending |
| COMP-03 | | Pending | | COMP-03 | Phase 12 | Pending |
| COMP-04 | | Pending | | COMP-04 | Phase 12 | Pending |
| RANK-01 | | Pending | | RANK-01 | Phase 11 | Pending |
| RANK-02 | | Pending | | RANK-02 | Phase 11 | Pending |
| RANK-03 | | Pending | | RANK-03 | Phase 10 | Pending |
| RANK-04 | | Pending | | RANK-04 | Phase 11 | Pending |
| RANK-05 | | Pending | | RANK-05 | Phase 11 | Pending |
| IMPC-01 | | Pending | | IMPC-01 | Phase 13 | Pending |
| IMPC-02 | | Pending | | IMPC-02 | Phase 13 | Pending |
| IMPC-03 | | Pending | | IMPC-03 | Phase 13 | Pending |
| IMPC-04 | | Pending | | IMPC-04 | Phase 13 | Pending |
**Coverage:** **Coverage:**
- v1.3 requirements: 13 total - v1.3 requirements: 13 total
- Mapped to phases: 0 - Mapped to phases: 13
- Unmapped: 13 - Unmapped: 0
--- ---
*Requirements defined: 2026-03-16* *Requirements defined: 2026-03-16*

View File

@@ -5,6 +5,7 @@
-**v1.0 MVP** — Phases 1-3 (shipped 2026-03-15) -**v1.0 MVP** — Phases 1-3 (shipped 2026-03-15)
-**v1.1 Fixes & Polish** — Phases 4-6 (shipped 2026-03-15) -**v1.1 Fixes & Polish** — Phases 4-6 (shipped 2026-03-15)
-**v1.2 Collection Power-Ups** — Phases 7-9 (shipped 2026-03-16) -**v1.2 Collection Power-Ups** — Phases 7-9 (shipped 2026-03-16)
- 🚧 **v1.3 Research & Decision Tools** — Phases 10-13 (in progress)
## Phases ## Phases
@@ -35,6 +36,61 @@
</details> </details>
### 🚧 v1.3 Research & Decision Tools (In Progress)
**Milestone Goal:** Give users the tools to actually decide between candidates — compare details side-by-side, see how a pick impacts their setup, and rank/annotate their options.
- [ ] **Phase 10: Schema Foundation + Pros/Cons Fields** — Migrate schema and deliver pros/cons annotation UI
- [ ] **Phase 11: Candidate Ranking** — Drag-to-reorder priority ranking with rank badges
- [ ] **Phase 12: Comparison View** — Side-by-side tabular comparison with relative deltas
- [ ] **Phase 13: Setup Impact Preview** — Per-candidate weight and cost delta against a selected setup
## Phase Details
### Phase 10: Schema Foundation + Pros/Cons Fields
**Goal**: Candidates can be annotated with pros and cons, and the database is ready for ranking
**Depends on**: Phase 9
**Requirements**: RANK-03
**Success Criteria** (what must be TRUE):
1. User can open a candidate edit form and see pros and cons text fields
2. User can save pros and cons text; the text persists across page refreshes
3. CandidateCard shows a visual indicator when a candidate has pros or cons entered
4. All existing tests pass after the schema migration (no column drift in test helper)
**Plans**: TBD
### Phase 11: Candidate Ranking
**Goal**: Users can drag candidates into a priority order that persists and is visually communicated
**Depends on**: Phase 10
**Requirements**: RANK-01, RANK-02, RANK-04, RANK-05
**Success Criteria** (what must be TRUE):
1. User can drag a candidate card to a new position within the thread's candidate list
2. The reordered sequence is still intact after navigating away and returning
3. The top three candidates display gold, silver, and bronze rank badges respectively
4. Drag handles and rank badges are absent on a resolved thread; candidates render in static order
**Plans**: TBD
### Phase 12: Comparison View
**Goal**: Users can view all candidates for a thread side-by-side in a table with relative weight and price deltas
**Depends on**: Phase 11
**Requirements**: COMP-01, COMP-02, COMP-03, COMP-04
**Success Criteria** (what must be TRUE):
1. User can toggle a "Compare" mode on a thread detail page to reveal a tabular view showing weight, price, images, notes, links, status, pros, and cons for every candidate in columns
2. The lightest candidate column is highlighted and all other columns show their weight difference relative to it; the cheapest candidate is highlighted similarly for price
3. The comparison table scrolls horizontally on a narrow viewport without breaking layout; the attribute label column stays fixed on the left
4. A resolved thread shows the comparison table in read-only mode with the winning candidate visually marked
**Plans**: TBD
### Phase 13: Setup Impact Preview
**Goal**: Users can select any setup and see exactly how much weight and cost each candidate would add or subtract
**Depends on**: Phase 12
**Requirements**: IMPC-01, IMPC-02, IMPC-03, IMPC-04
**Success Criteria** (what must be TRUE):
1. User can select a setup from a dropdown in the thread header and each candidate displays a weight delta and cost delta below its name
2. When the selected setup contains an item in the same category as the thread, the delta reflects replacing that item (negative delta is possible) rather than pure addition
3. When no category match exists in the selected setup, the delta shows a pure addition amount clearly labeled as "add"
4. A candidate with no weight recorded shows a "-- (no weight data)" indicator instead of a zero delta
**Plans**: TBD
## Progress ## Progress
| Phase | Milestone | Plans Complete | Status | Completed | | Phase | Milestone | Plans Complete | Status | Completed |
@@ -48,3 +104,7 @@
| 7. Weight Unit Selection | v1.2 | 2/2 | Complete | 2026-03-16 | | 7. Weight Unit Selection | v1.2 | 2/2 | Complete | 2026-03-16 |
| 8. Search, Filter, and Candidate Status | v1.2 | 2/2 | Complete | 2026-03-16 | | 8. Search, Filter, and Candidate Status | v1.2 | 2/2 | Complete | 2026-03-16 |
| 9. Weight Classification and Visualization | v1.2 | 2/2 | Complete | 2026-03-16 | | 9. Weight Classification and Visualization | v1.2 | 2/2 | Complete | 2026-03-16 |
| 10. Schema Foundation + Pros/Cons Fields | v1.3 | 0/TBD | Not started | - |
| 11. Candidate Ranking | v1.3 | 0/TBD | Not started | - |
| 12. Comparison View | v1.3 | 0/TBD | Not started | - |
| 13. Setup Impact Preview | v1.3 | 0/TBD | Not started | - |

View File

@@ -2,12 +2,12 @@
gsd_state_version: 1.0 gsd_state_version: 1.0
milestone: v1.3 milestone: v1.3
milestone_name: Research & Decision Tools milestone_name: Research & Decision Tools
status: requirements status: roadmap
stopped_at: Defining requirements stopped_at: Roadmap created — ready to plan Phase 10
last_updated: "2026-03-16T19:00:00.000Z" last_updated: "2026-03-16T19:00:00.000Z"
last_activity: 2026-03-16 -- Milestone v1.3 started last_activity: 2026-03-16 -- Roadmap created for v1.3 (4 phases, 13 requirements)
progress: progress:
total_phases: 0 total_phases: 4
completed_phases: 0 completed_phases: 0
total_plans: 0 total_plans: 0
completed_plans: 0 completed_plans: 0
@@ -21,14 +21,35 @@ progress:
See: .planning/PROJECT.md (updated 2026-03-16) See: .planning/PROJECT.md (updated 2026-03-16)
**Core value:** Make it effortless to manage gear and plan new purchases -- see how a potential buy affects your total setup weight and cost before committing. **Core value:** Make it effortless to manage gear and plan new purchases -- see how a potential buy affects your total setup weight and cost before committing.
**Current focus:** v1.3 Research & Decision Tools **Current focus:** v1.3 Research & Decision Tools — Phase 10 ready to plan
## Current Position ## Current Position
Phase: Not started (defining requirements) Phase: 10 of 13 (Schema Foundation + Pros/Cons Fields)
Plan: — Plan: —
Status: Defining requirements Status: Ready to plan
Last activity: 2026-03-16 — Milestone v1.3 started Last activity: 2026-03-16 — Roadmap created for v1.3 milestone
Progress: [░░░░░░░░░░] 0%
## Performance Metrics
**Velocity:**
- Total plans completed: 0
- Average duration: —
- Total execution time: —
**By Phase:**
| Phase | Plans | Total | Avg/Plan |
|-------|-------|-------|----------|
| - | - | - | - |
**Recent Trend:**
- Last 5 plans: —
- Trend: —
*Updated after each plan completion*
## Accumulated Context ## Accumulated Context
@@ -36,6 +57,11 @@ Last activity: 2026-03-16 — Milestone v1.3 started
Cleared at milestone boundary. v1.2 decisions archived in milestones/v1.2-ROADMAP.md. Cleared at milestone boundary. v1.2 decisions archived in milestones/v1.2-ROADMAP.md.
Key v1.3 research findings (see research/SUMMARY.md):
- framer-motion@12.37.0 (already installed) handles drag-to-reorder via Reorder component — no new deps
- sort_order must use REAL (float) type, not INTEGER, to avoid bulk writes on every drag
- Impact preview must distinguish add-mode vs replace-mode by category match — pure addition misleads
### Pending Todos ### Pending Todos
None active. None active.
@@ -47,5 +73,5 @@ None active.
## Session Continuity ## Session Continuity
Last session: 2026-03-16 Last session: 2026-03-16
Stopped at: Defining requirements for v1.3 Stopped at: Roadmap created — 4 phases, 13 requirements mapped, ready to plan Phase 10
Resume file: None Resume file: None