docs(27-02): complete setups-elevation plan
This commit is contained in:
@@ -141,7 +141,7 @@ Plans:
|
||||
Plans:
|
||||
- [ ] 27-00-PLAN.md — Wave 0: E2E test scaffolding for nav restructure
|
||||
- [ ] 27-01-PLAN.md — TopNav and BottomTabBar components
|
||||
- [ ] 27-02-PLAN.md — Setups top-level route and Collection tab simplification
|
||||
- [x] 27-02-PLAN.md — Setups top-level route and Collection tab simplification
|
||||
- [ ] 27-03-PLAN.md — Root layout wiring, hero removal, and visual verification
|
||||
**UI hint**: yes
|
||||
|
||||
|
||||
Reference in New Issue
Block a user