Commit Graph

125 Commits

Author SHA1 Message Date
1733fe8cfb chore: archive v2.3 milestone files
Archive setup sharing, currency system, and i18n foundation milestone.
Reorganize ROADMAP.md with v2.3 details block, update PROJECT.md,
MILESTONES.md, STATE.md deferred items, and RETROSPECTIVE.md.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-19 17:05:21 +02:00
be5b318041 docs(phase-34): complete phase execution 2026-04-18 14:41:42 +02:00
f91417a24b docs(34-02): complete extract hardcoded strings plan summary
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-04-18 14:02:41 +02:00
8d7a668da4 fix: resolve lint errors from phase 32/33/34 execution
All checks were successful
CI / ci (push) Successful in 1m23s
CI / e2e (push) Has been skipped
CI / deploy (push) Successful in 1m20s
Auto-fixed formatting issues and removed unused imports introduced
by background execution agents across currency, i18n, and sharing code.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-13 18:32:32 +02:00
ceee6c0f13 docs(phase-34): complete i18n foundation phase execution
Some checks failed
CI / ci (push) Failing after 11s
CI / e2e (push) Has been skipped
CI / deploy (push) Has been skipped
2026-04-13 18:24:22 +02:00
de82eefa74 docs(phase-33): complete phase execution
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-13 18:10:47 +02:00
7d6c548811 docs: add phase 32 decisions to STATE.md
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-13 18:05:54 +02:00
1d15d4b336 docs(state): record phase 34 context session 2026-04-13 18:00:10 +02:00
d928634e57 docs(state): record phase 33 context session 2026-04-13 17:45:50 +02:00
49c59fded9 docs(state): record phase 32 context session 2026-04-13 16:51:32 +02:00
2853477a75 chore: archive v2.2 User Experience Polish milestone
All checks were successful
CI / ci (push) Successful in 1m15s
CI / e2e (push) Has been skipped
CI / deploy (push) Has been skipped
Phases 28-31 archived to milestones/v2.2-phases/
Requirements and roadmap snapshots archived to milestones/

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-13 16:00:35 +02:00
d91d32deaf docs: capture todo - Fix Add Candidate button shows wrong modal on thread page 2026-04-13 13:39:58 +02:00
15c9f94d67 docs(phase-30): complete phase execution — onboarding redesign
Some checks failed
CI / ci (push) Failing after 17s
CI / e2e (push) Has been skipped
CI / deploy (push) Has been skipped
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-12 20:50:09 +02:00
b355c333e5 docs(phase-31): complete phase execution and verification 2026-04-12 20:19:10 +02:00
6c76dbbee3 docs(phase-29): complete phase execution
Phase 29 Image Presentation verified and marked complete.
14/14 must-haves passed. Next: Phase 30 Onboarding Redesign.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-12 20:11:10 +02:00
fd0a7eef47 docs(state): record phase 31 context session 2026-04-12 20:01:20 +02:00
11cc082f40 docs(state): record phase 30 context session 2026-04-12 19:55:50 +02:00
7064c6cdf1 docs(29): research, validation, and 4 plans for image presentation
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-12 19:51:36 +02:00
1e1f49fc01 docs(state): record phase 29 context session 2026-04-12 19:42:16 +02:00
40e7f94c52 docs(phase-28): complete phase execution 2026-04-12 17:51:49 +02:00
b71900efbd docs(state): record phase 28 context session 2026-04-12 17:33:06 +02:00
b234988db2 docs(quick-260411-1h2): update STATE.md with quick task completion
All checks were successful
CI / ci (push) Successful in 1m24s
CI / e2e (push) Has been skipped
CI / deploy (push) Successful in 15s
2026-04-11 01:13:40 +02:00
c56850954c docs(quick-260411-0zq): complete redesign search UX plan
- Add SUMMARY.md for quick task 260411-0zq
- Update STATE.md with completed quick task entry
2026-04-11 00:49:19 +02:00
dc5499283c docs(quick-260411-022): Fix global items search bar layout
All checks were successful
CI / ci (push) Successful in 1m12s
CI / e2e (push) Has been skipped
CI / deploy (push) Successful in 14s
2026-04-11 00:07:08 +02:00
acb4672aed docs(phase-27): complete phase execution 2026-04-10 23:52:28 +02:00
2b27309b23 docs(27-03): complete root layout integration plan
- SUMMARY.md: TopNav/BottomTabBar wired, hero removed, /setups public route
- STATE.md: progress 100%, session recorded
- ROADMAP.md: phase 27 marked Complete (4/4 plans)
2026-04-10 23:48:43 +02:00
83b760a6d6 docs(27-01): complete TopNav and BottomTabBar plan
- SUMMARY.md: two components created, house icon deviation documented
- STATE.md: advanced to plan 4/4, progress 91%, decision recorded
- ROADMAP.md: phase 27 updated (3/4 summaries)
2026-04-10 23:45:56 +02:00
5984aabd40 docs(27-00): complete wave 0 E2E scaffolding plan
- Create 27-00-SUMMARY.md with test changes documentation
- Update STATE.md: advance plan to 3/4, add decisions, update session
- Update ROADMAP.md: reflect 2/4 summaries complete for phase 27
2026-04-10 23:45:01 +02:00
be3759b53a docs(27-02): complete setups-elevation plan 2026-04-10 23:44:36 +02:00
d6ed015b85 docs(state): record phase 27 context session 2026-04-10 23:20:30 +02:00
c892800969 docs(phase-26): complete phase execution 2026-04-10 15:08:18 +02:00
31a72c68f3 docs(26-03): complete discovery landing page plan
- 26-03-SUMMARY.md: landing page rewrite and PublicSetupCard enhancement
- STATE.md: advanced to phase complete, recorded decisions
- ROADMAP.md: phase 26 marked complete (3/3 plans)
- REQUIREMENTS.md: DISC-01 through DISC-05 marked complete
2026-04-10 15:03:00 +02:00
0b2e355bf8 docs(26-02): complete discovery routes and hooks plan 2026-04-10 14:59:58 +02:00
a00b90d97a docs(26-01): complete discovery service plan
- SUMMARY.md: discovery service with cursor pagination
- STATE.md: advanced to plan 2, added decisions, updated progress to 71%
- ROADMAP.md: phase 26 in progress (1/3 plans)
- REQUIREMENTS.md: DISC-02, DISC-03, DISC-04, INFR-02 marked complete
2026-04-10 14:55:15 +02:00
274bced96d docs(state): record phase 26 context session 2026-04-10 14:33:04 +02:00
1789ee9093 docs(phase-25): complete phase execution 2026-04-10 11:13:18 +02:00
aeb3402576 docs(25-02): complete HTTP routes, MCP catalog tools, and attribution display plan 2026-04-10 11:08:16 +02:00
9dbf019466 docs(25-01): complete catalog enrichment data layer plan
- SUMMARY.md: attribution columns, upsert service, Zod schemas
- STATE.md: advance to plan 2, add decisions
- ROADMAP.md: update phase 25 progress
- REQUIREMENTS.md: mark CATL-01, CATL-02, CATL-05 complete
2026-04-10 10:59:58 +02:00
e805269485 docs(state): record phase 25 context session 2026-04-10 10:33:15 +02:00
a28ff90b35 docs(phase-24): complete phase execution 2026-04-10 10:17:40 +02:00
9177296223 docs(24-02): complete public access client layer plan
- SUMMARY.md created for 24-02 (auth prompt modal, render-first root, public setup viewing)
- STATE.md updated: plan advanced, progress 100%, decisions recorded
- ROADMAP.md updated: phase 24 complete (2/2 plans with SUMMARYs)
- REQUIREMENTS.md: PUBL-01 through PUBL-05 marked complete
2026-04-10 10:11:17 +02:00
50f9629707 docs(24-01): complete rate limiter factory and tiered public endpoint limits plan
- Add 24-01-SUMMARY.md with execution results
- Advance plan counter to 2/2
- Update progress to 50% (1 of 2 plans complete)
- Mark INFR-01 requirement complete
- Add factory pattern and tier decisions to STATE.md
2026-04-10 10:08:50 +02:00
87ad09167d docs(state): record phase 24 context session 2026-04-09 15:13:42 +02:00
9a69671718 docs: create milestone v2.1 roadmap (3 phases) 2026-04-09 14:53:25 +02:00
f9c69a1366 docs: start milestone v2.1 Public Discovery 2026-04-09 14:33:19 +02:00
f564e8cb54 docs: archive v1.3 and v2.0 milestones with roadmap, requirements, and retrospective
All checks were successful
CI / ci (push) Successful in 1m7s
CI / e2e (push) Has been skipped
CI / deploy (push) Successful in 7s
2026-04-08 23:10:50 +02:00
6abf46d8c9 docs(phase-23): complete phase execution 2026-04-06 18:01:31 +02:00
724ae96011 docs(23-01): complete manual entry fallback plan
- ManualEntryForm component with CategoryPicker, ImageUpload, price-to-cents conversion
- CatalogSearchOverlay wired with Add Manually entry points, inline form, success card
- STATE.md updated with position, decisions, metrics
- ROADMAP.md phase 23 marked complete
- CATFLOW-07, CATFLOW-08 requirements marked complete
2026-04-06 17:57:58 +02:00
d736795f2d docs(state): record phase 23 planning session 2026-04-06 17:36:11 +02:00
53740ba10b docs(state): record phase 23 context session 2026-04-06 17:25:42 +02:00