- Add 10-01-SUMMARY.md with TDD execution results - STATE.md: updated metrics, decisions, session, progress - ROADMAP.md: phase 10 marked complete (1/1 plans) - REQUIREMENTS.md: RANK-03 marked complete
5.9 KiB
5.9 KiB
phase, plan, subsystem, tags, requires, provides, affects, tech-stack, key-files, key-decisions, patterns-established, requirements-completed, duration, completed
| phase | plan | subsystem | tags | requires | provides | affects | tech-stack | key-files | key-decisions | patterns-established | requirements-completed | duration | completed | |||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 10-schema-foundation-pros-cons-fields | 01 | database |
|
|
|
|
|
|
|
|
6min | 2026-03-16 |
Phase 10 Plan 01: Schema Foundation Pros/Cons Fields Summary
Nullable pros/cons TEXT columns added to thread_candidates from SQLite schema through Drizzle migration, service layer, Zod validation, React form inputs, and CandidateCard visual badge
Performance
- Duration: 6 min
- Started: 2026-03-16T20:30:18Z
- Completed: 2026-03-16T20:36:25Z
- Tasks: 2
- Files modified: 9
Accomplishments
- Added pros/cons columns to threadCandidates schema and applied Drizzle migration (0004_soft_synch.sql)
- Wired pros/cons through all backend layers: service create/update/get + Zod schemas
- Added Pros and Cons textarea inputs to CandidateForm with pre-fill in edit mode
- Added purple "+/- Notes" badge to CandidateCard when either field has content
- 28 thread service tests passing (24 existing + 4 new) with zero regressions
Task Commits
Each task was committed atomically:
- TDD RED - failing tests -
719f708(test) - Task 1: Add pros/cons columns through backend + tests -
7a64a18(feat) - Task 2: Wire pros/cons through client hooks, form, and card indicator -
4f2aefe(feat)
Note: TDD task has separate test commit (RED) and implementation commit (GREEN)
Files Created/Modified
src/db/schema.ts- Added pros/cons nullable TEXT columns to threadCandidatesdrizzle/0004_soft_synch.sql- Migration: ALTER TABLE thread_candidates ADD COLUMN pros/constests/helpers/db.ts- Mirrored pros/cons in CREATE TABLE thread_candidatessrc/server/services/thread.service.ts- pros/cons in createCandidate values(), updateCandidate Partial type, getThreadWithCandidates selectsrc/shared/schemas.ts- pros/cons optional string fields in createCandidateSchema (updateCandidateSchema inherits via .partial())src/client/hooks/useCandidates.ts- pros/cons added to CandidateResponse interfacesrc/client/components/CandidateForm.tsx- Pros and Cons textareas, FormData fields, INITIAL_FORM, pre-fill, payloadsrc/client/components/CandidateCard.tsx- props, destructuring, purple +/- Notes badgesrc/client/routes/threads/$threadId.tsx- pros={candidate.pros} cons={candidate.cons} passed to CandidateCardtests/services/thread.service.test.ts- 4 new test cases for pros/cons create/update/get
Decisions Made
- Empty string for pros/cons is stored as-is (not normalized to null on empty); the test accepts either empty string or null as "cleared" state since SQLite/Drizzle does not coerce empty strings.
- Visual indicator uses purple to distinguish from existing badge color scheme (blue=weight, green=price, gray=category, status has its own colors).
- Textarea placement (after Notes, before Product Link) groups annotation fields logically.
Deviations from Plan
None - plan executed exactly as written.
Issues Encountered
Pre-existing lint violations discovered in files outside the plan scope:
src/client/components/WeightSummaryCard.tsx,src/client/routes/collection/index.tsx,src/client/routes/index.tsx,src/client/routes/setups/$setupId.tsx— format/organizeImports errors.obsidian/workspace.json— Biome format error (IDE file, should be excluded)
These are logged to deferred-items.md and not fixed (out of scope per deviation scope boundary rule).
User Setup Required
None - no external service configuration required.
Next Phase Readiness
- RANK-03 fully implemented: pros/cons fields on candidates, editable via form, persisted in SQLite, with visual badge indicator
- Schema foundation complete — subsequent plans in phase 10 can build ranking/sorting features on top of this data
- No blockers
Phase: 10-schema-foundation-pros-cons-fields Completed: 2026-03-16
Self-Check: PASSED
All files and commits verified: