docs: create milestone v1.1 roadmap (3 phases)

This commit is contained in:
2026-03-16 20:54:40 +01:00
parent b7a243603c
commit 90ff66223c
3 changed files with 90 additions and 25 deletions

View File

@@ -60,22 +60,22 @@ Which phases cover which requirements. Updated during roadmap creation.
| Requirement | Phase | Status | | Requirement | Phase | Status |
|-------------|-------|--------| |-------------|-------|--------|
| CAL-01 | | Pending | | CAL-01 | Phase 5 | Pending |
| CAL-02 | | Pending | | CAL-02 | Phase 5 | Pending |
| CAL-03 | | Pending | | CAL-03 | Phase 5 | Pending |
| CAL-04 | | Pending | | CAL-04 | Phase 5 | Pending |
| CAL-05 | | Pending | | CAL-05 | Phase 5 | Pending |
| HIST-01 | | Pending | | HIST-01 | Phase 6 | Pending |
| HIST-02 | | Pending | | HIST-02 | Phase 6 | Pending |
| SORT-01 | | Pending | | SORT-01 | Phase 7 | Pending |
| SORT-02 | | Pending | | SORT-02 | Phase 7 | Pending |
| SORT-03 | | Pending | | SORT-03 | Phase 7 | Pending |
**Coverage:** **Coverage:**
- v1.1 requirements: 10 total - v1.1 requirements: 10 total
- Mapped to phases: 0 - Mapped to phases: 10
- Unmapped: 10 ⚠️ - Unmapped: 0
--- ---
*Requirements defined: 2026-03-16* *Requirements defined: 2026-03-16*
*Last updated: 2026-03-16 after initial definition* *Last updated: 2026-03-16 after roadmap creation (phases 5-7)*

View File

@@ -3,6 +3,7 @@
## Milestones ## Milestones
- **v1.0 MVP** — Phases 1-4 (shipped 2026-03-16) - **v1.0 MVP** — Phases 1-4 (shipped 2026-03-16)
- **v1.1 Calendar & Polish** — Phases 5-7 (in progress)
## Phases ## Phases
@@ -18,6 +19,47 @@ See `milestones/v1.0-ROADMAP.md` for full phase details.
</details> </details>
**v1.1 Calendar & Polish (Phases 5-7):**
- [ ] **Phase 5: Calendar Strip** - Replace the stacked daily plan home screen with a horizontal scrollable date-strip and day-task list
- [ ] **Phase 6: Task History** - Record every task completion with a timestamp and expose a per-task history view
- [ ] **Phase 7: Task Sorting** - Add alphabetical, interval, and effort sort options to task lists
## Phase Details
### Phase 5: Calendar Strip
**Goal**: Users navigate their tasks through a horizontal date-strip that replaces the stacked daily plan, seeing today's tasks by default and any day's tasks on tap
**Depends on**: Phase 4 (v1.0 shipped — all data layer and scheduling in place)
**Requirements**: CAL-01, CAL-02, CAL-03, CAL-04, CAL-05
**Success Criteria** (what must be TRUE):
1. The home screen shows a horizontal scrollable strip of day cards, each displaying the German day abbreviation (Mo, Di, Mi...) and the date number
2. Tapping any day card updates the task list below the strip to show that day's tasks, with the selected card visually highlighted
3. On app launch the strip auto-scrolls so today's card is centered and selected by default
4. When two adjacent day cards span a month boundary, a subtle color shift or divider makes the boundary visible without extra chrome
5. Tasks that were not completed on their due date appear in subsequent days' lists with a red/orange accent marking them as overdue
**Plans**: TBD
### Phase 6: Task History
**Goal**: Users can see exactly when each task was completed in the past, building trust that the scheduling loop is working correctly
**Depends on**: Phase 5
**Requirements**: HIST-01, HIST-02
**Success Criteria** (what must be TRUE):
1. Every task completion (tap done in any view) is recorded in the database with a precise timestamp — data persists across app restarts
2. From a task's detail or context menu the user can open a history view listing all past completion dates for that task in reverse-chronological order
3. The history view shows a meaningful empty state if the task has never been completed
**Plans**: TBD
### Phase 7: Task Sorting
**Goal**: Users can reorder task lists by the dimension most useful to them — name, how often the task recurs, or how much effort it requires
**Depends on**: Phase 5
**Requirements**: SORT-01, SORT-02, SORT-03
**Success Criteria** (what must be TRUE):
1. A sort control (dropdown, segmented button, or similar) is visible on task list screens and persists the chosen sort across app restarts
2. Selecting alphabetical sort orders tasks A-Z by name within the visible list
3. Selecting interval sort orders tasks from most-frequent (daily) to least-frequent (yearly/custom) intervals
4. Selecting effort sort orders tasks from lowest effort to highest effort level
**Plans**: TBD
## Progress ## Progress
| Phase | Milestone | Plans Complete | Status | Completed | | Phase | Milestone | Plans Complete | Status | Completed |
@@ -26,3 +68,6 @@ See `milestones/v1.0-ROADMAP.md` for full phase details.
| 2. Rooms and Tasks | v1.0 | 5/5 | Complete | 2026-03-15 | | 2. Rooms and Tasks | v1.0 | 5/5 | Complete | 2026-03-15 |
| 3. Daily Plan and Cleanliness | v1.0 | 3/3 | Complete | 2026-03-16 | | 3. Daily Plan and Cleanliness | v1.0 | 3/3 | Complete | 2026-03-16 |
| 4. Notifications | v1.0 | 3/3 | Complete | 2026-03-16 | | 4. Notifications | v1.0 | 3/3 | Complete | 2026-03-16 |
| 5. Calendar Strip | v1.1 | 0/? | Not started | - |
| 6. Task History | v1.1 | 0/? | Not started | - |
| 7. Task Sorting | v1.1 | 0/? | Not started | - |

View File

@@ -2,12 +2,12 @@
gsd_state_version: 1.0 gsd_state_version: 1.0
milestone: v1.1 milestone: v1.1
milestone_name: Calendar & Polish milestone_name: Calendar & Polish
status: planning status: ready
stopped_at: Defining requirements stopped_at: Roadmap created — ready for Phase 5
last_updated: "2026-03-16T21:00:00.000Z" last_updated: "2026-03-16T21:00:00.000Z"
last_activity: 2026-03-16 — Milestone v1.1 started last_activity: 2026-03-16 — Roadmap created for v1.1 (phases 5-7)
progress: progress:
total_phases: 0 total_phases: 3
completed_phases: 0 completed_phases: 0
total_plans: 0 total_plans: 0
completed_plans: 0 completed_plans: 0
@@ -21,20 +21,38 @@ progress:
See: .planning/PROJECT.md (updated 2026-03-16) See: .planning/PROJECT.md (updated 2026-03-16)
**Core value:** Users can see what needs doing today, mark it done, and trust the app to schedule the next occurrence — without thinking about it. **Core value:** Users can see what needs doing today, mark it done, and trust the app to schedule the next occurrence — without thinking about it.
**Current focus:** v1.1 Calendar & Polish **Current focus:** v1.1 Calendar & Polish — Phase 5: Calendar Strip
## Current Position ## Current Position
Phase: Not started (defining requirements) Phase: 5 — Calendar Strip
Plan: Plan: Not started
Status: Defining requirements Status: Ready to plan Phase 5
Last activity: 2026-03-16 — Milestone v1.1 started Last activity: 2026-03-16 — Roadmap for v1.1 written (phases 5-7)
```
Progress: [ ░░░░░░░░░░░░░░░░░░░░ ] 0% (0/3 phases)
```
## Performance Metrics
| Metric | v1.0 | v1.1 |
|--------|------|------|
| Phases | 4 | 3 planned |
| Plans | 13 | TBD |
| LOC (lib) | 7,773 | TBD |
| Tests | 89 | TBD |
## Accumulated Context ## Accumulated Context
### Decisions ### Decisions
All v1.0 decisions are recorded in PROJECT.md Key Decisions table with outcomes. | Decision | Rationale |
|----------|-----------|
| Calendar strip replaces daily plan home screen | v1.1 goal per PROJECT.md — not additive, the stacked overdue/today/upcoming sections are removed |
| Phase 5 before Phase 6 and 7 | Calendar strip is the primary UI surface; history and sorting operate within or alongside it |
| Phase 6 and 7 both depend on Phase 5 only | History and sorting are independent of each other — could execute in either order |
| HIST-01 and HIST-02 in same phase | Data layer (HIST-01) is only 1-2 DAO additions; grouping with the UI (HIST-02) keeps the phase coherent |
### Pending Todos ### Pending Todos
@@ -42,10 +60,12 @@ None.
### Blockers/Concerns ### Blockers/Concerns
None. - The existing HomeScreen (daily plan with overdue/today/upcoming) will be replaced entirely in Phase 5. Verify no other screen references the daily plan provider before deleting it, or migrate references.
- CAL-05 (overdue carry-over with color accent) requires a query that returns tasks by their original due date relative to a selected day — confirm the existing DailyPlanDao can be adapted or a new CalendarDao is needed.
## Session Continuity ## Session Continuity
Last session: 2026-03-16 Last session: 2026-03-16
Stopped at: Milestone v1.1 started Stopped at: Roadmap created, ready for Phase 5 planning
Resume file: None Resume file: None
Next action: `/gsd:plan-phase 5`