docs(01-02): complete navigation shell and screens plan
- SUMMARY.md with 3 task commits, 1 deviation, self-check passed - STATE.md updated: Phase 1 complete, 2/2 plans done - ROADMAP.md Phase 1 marked complete (2/2) - REQUIREMENTS.md FOUND-04 marked complete Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
@@ -59,7 +59,7 @@ Requirements for initial release. Each maps to roadmap phases.
|
|||||||
- [x] **FOUND-01**: App uses Drift for local SQLite storage with proper schema migration workflow
|
- [x] **FOUND-01**: App uses Drift for local SQLite storage with proper schema migration workflow
|
||||||
- [x] **FOUND-02**: App uses Riverpod 3 for state management with code generation
|
- [x] **FOUND-02**: App uses Riverpod 3 for state management with code generation
|
||||||
- [x] **FOUND-03**: App uses localization infrastructure (ARB files + AppLocalizations) with German locale, even though only one language ships in v1
|
- [x] **FOUND-03**: App uses localization infrastructure (ARB files + AppLocalizations) with German locale, even though only one language ships in v1
|
||||||
- [ ] **FOUND-04**: Bottom navigation with tabs: Home (Daily Plan), Rooms, Settings
|
- [x] **FOUND-04**: Bottom navigation with tabs: Home (Daily Plan), Rooms, Settings
|
||||||
|
|
||||||
## v2 Requirements
|
## v2 Requirements
|
||||||
|
|
||||||
@@ -122,7 +122,7 @@ Which phases cover which requirements. Updated during roadmap creation.
|
|||||||
| FOUND-01 | Phase 1: Foundation | Complete |
|
| FOUND-01 | Phase 1: Foundation | Complete |
|
||||||
| FOUND-02 | Phase 1: Foundation | Complete |
|
| FOUND-02 | Phase 1: Foundation | Complete |
|
||||||
| FOUND-03 | Phase 1: Foundation | Complete |
|
| FOUND-03 | Phase 1: Foundation | Complete |
|
||||||
| FOUND-04 | Phase 1: Foundation | Pending |
|
| FOUND-04 | Phase 1: Foundation | Complete |
|
||||||
| THEME-01 | Phase 1: Foundation | Complete |
|
| THEME-01 | Phase 1: Foundation | Complete |
|
||||||
| THEME-02 | Phase 1: Foundation | Complete |
|
| THEME-02 | Phase 1: Foundation | Complete |
|
||||||
| ROOM-01 | Phase 2: Rooms and Tasks | Pending |
|
| ROOM-01 | Phase 2: Rooms and Tasks | Pending |
|
||||||
|
|||||||
@@ -12,7 +12,7 @@ Four phases build the app bottom-up along its natural dependency chain. Phase 1
|
|||||||
|
|
||||||
Decimal phases appear between their surrounding integers in numeric order.
|
Decimal phases appear between their surrounding integers in numeric order.
|
||||||
|
|
||||||
- [ ] **Phase 1: Foundation** - Project scaffold, database, state management, theme, and localization infrastructure
|
- [x] **Phase 1: Foundation** - Project scaffold, database, state management, theme, and localization infrastructure (completed 2026-03-15)
|
||||||
- [ ] **Phase 2: Rooms and Tasks** - Complete room CRUD, task CRUD with auto-scheduling, and bundled templates
|
- [ ] **Phase 2: Rooms and Tasks** - Complete room CRUD, task CRUD with auto-scheduling, and bundled templates
|
||||||
- [ ] **Phase 3: Daily Plan and Cleanliness** - Primary daily plan screen with overdue/today/upcoming, cleanliness indicators per room
|
- [ ] **Phase 3: Daily Plan and Cleanliness** - Primary daily plan screen with overdue/today/upcoming, cleanliness indicators per room
|
||||||
- [ ] **Phase 4: Notifications** - Daily summary notification with configurable time and Android permission handling
|
- [ ] **Phase 4: Notifications** - Daily summary notification with configurable time and Android permission handling
|
||||||
@@ -31,8 +31,8 @@ Decimal phases appear between their surrounding integers in numeric order.
|
|||||||
5. riverpod_lint is active and flags ref.watch usage outside build() as an analysis error
|
5. riverpod_lint is active and flags ref.watch usage outside build() as an analysis error
|
||||||
**Plans**: 2 plans
|
**Plans**: 2 plans
|
||||||
Plans:
|
Plans:
|
||||||
- [ ] 01-01-PLAN.md — Scaffold Flutter project and build core infrastructure (database, providers, theme, localization)
|
- [x] 01-01-PLAN.md — Scaffold Flutter project and build core infrastructure (database, providers, theme, localization)
|
||||||
- [ ] 01-02-PLAN.md — Navigation shell, placeholder screens, Settings, and full app wiring
|
- [x] 01-02-PLAN.md — Navigation shell, placeholder screens, Settings, and full app wiring
|
||||||
|
|
||||||
### Phase 2: Rooms and Tasks
|
### Phase 2: Rooms and Tasks
|
||||||
**Goal**: Users can create and manage rooms and tasks, mark tasks done, and trust the app to schedule the next occurrence automatically
|
**Goal**: Users can create and manage rooms and tasks, mark tasks done, and trust the app to schedule the next occurrence automatically
|
||||||
@@ -80,7 +80,7 @@ Note: Phase 4 depends on Phase 2 (needs scheduling data) but can be developed in
|
|||||||
|
|
||||||
| Phase | Plans Complete | Status | Completed |
|
| Phase | Plans Complete | Status | Completed |
|
||||||
|-------|----------------|--------|-----------|
|
|-------|----------------|--------|-----------|
|
||||||
| 1. Foundation | 0/2 | Planning complete | - |
|
| 1. Foundation | 2/2 | Complete | 2026-03-15 |
|
||||||
| 2. Rooms and Tasks | 0/TBD | Not started | - |
|
| 2. Rooms and Tasks | 0/TBD | Not started | - |
|
||||||
| 3. Daily Plan and Cleanliness | 0/TBD | Not started | - |
|
| 3. Daily Plan and Cleanliness | 0/TBD | Not started | - |
|
||||||
| 4. Notifications | 0/TBD | Not started | - |
|
| 4. Notifications | 0/TBD | Not started | - |
|
||||||
|
|||||||
@@ -1,3 +1,19 @@
|
|||||||
|
---
|
||||||
|
gsd_state_version: 1.0
|
||||||
|
milestone: v1.0
|
||||||
|
milestone_name: milestone
|
||||||
|
status: planning
|
||||||
|
stopped_at: Completed 01-02-PLAN.md -- Phase 1 complete, ready for Phase 2 planning
|
||||||
|
last_updated: "2026-03-15T19:09:57.073Z"
|
||||||
|
last_activity: 2026-03-15 — Completed 01-02-PLAN.md (navigation shell, screens, settings, full app wiring)
|
||||||
|
progress:
|
||||||
|
total_phases: 4
|
||||||
|
completed_phases: 1
|
||||||
|
total_plans: 2
|
||||||
|
completed_plans: 2
|
||||||
|
percent: 100
|
||||||
|
---
|
||||||
|
|
||||||
# Project State
|
# Project State
|
||||||
|
|
||||||
## Project Reference
|
## Project Reference
|
||||||
@@ -9,29 +25,29 @@ See: .planning/PROJECT.md (updated 2026-03-15)
|
|||||||
|
|
||||||
## Current Position
|
## Current Position
|
||||||
|
|
||||||
Phase: 1 of 4 (Foundation)
|
Phase: 1 of 4 (Foundation) -- COMPLETE
|
||||||
Plan: 1 of 2 in current phase
|
Plan: 2 of 2 in current phase
|
||||||
Status: Executing
|
Status: Phase complete -- ready for Phase 2 planning
|
||||||
Last activity: 2026-03-15 — Completed 01-01-PLAN.md (project scaffold, core infrastructure, tests)
|
Last activity: 2026-03-15 — Completed 01-02-PLAN.md (navigation shell, screens, settings, full app wiring)
|
||||||
|
|
||||||
Progress: [█░░░░░░░░░] 10%
|
Progress: [██████████] 100%
|
||||||
|
|
||||||
## Performance Metrics
|
## Performance Metrics
|
||||||
|
|
||||||
**Velocity:**
|
**Velocity:**
|
||||||
- Total plans completed: 1
|
- Total plans completed: 2
|
||||||
- Average duration: 7 min
|
- Average duration: 7.5 min
|
||||||
- Total execution time: 0.1 hours
|
- Total execution time: 0.25 hours
|
||||||
|
|
||||||
**By Phase:**
|
**By Phase:**
|
||||||
|
|
||||||
| Phase | Plans | Total | Avg/Plan |
|
| Phase | Plans | Total | Avg/Plan |
|
||||||
|-------|-------|-------|----------|
|
|-------|-------|-------|----------|
|
||||||
| 1 - Foundation | 1 | 7 min | 7 min |
|
| 1 - Foundation | 2 | 15 min | 7.5 min |
|
||||||
|
|
||||||
**Recent Trend:**
|
**Recent Trend:**
|
||||||
- Last 5 plans: 01-01 (7 min)
|
- Last 5 plans: 01-01 (7 min), 01-02 (8 min)
|
||||||
- Trend: baseline
|
- Trend: stable
|
||||||
|
|
||||||
*Updated after each plan completion*
|
*Updated after each plan completion*
|
||||||
|
|
||||||
@@ -49,6 +65,7 @@ Recent decisions affecting current work:
|
|||||||
- [Pre-phase]: drift_dev make-migrations workflow must be established in Phase 1 — recovery cost is data loss
|
- [Pre-phase]: drift_dev make-migrations workflow must be established in Phase 1 — recovery cost is data loss
|
||||||
- [01-01]: Pinned drift/drift_dev to 2.31.0 for analyzer ^9.0.0 compatibility with riverpod_generator 4.0.3
|
- [01-01]: Pinned drift/drift_dev to 2.31.0 for analyzer ^9.0.0 compatibility with riverpod_generator 4.0.3
|
||||||
- [01-01]: Generated Riverpod 3 provider named themeProvider (not themeNotifierProvider) per new naming convention
|
- [01-01]: Generated Riverpod 3 provider named themeProvider (not themeNotifierProvider) per new naming convention
|
||||||
|
- [Phase 01-02]: Used themeProvider (Riverpod 3 naming) instead of themeNotifierProvider referenced in plan
|
||||||
|
|
||||||
### Pending Todos
|
### Pending Todos
|
||||||
|
|
||||||
@@ -62,6 +79,6 @@ None yet.
|
|||||||
|
|
||||||
## Session Continuity
|
## Session Continuity
|
||||||
|
|
||||||
Last session: 2026-03-15
|
Last session: 2026-03-15T19:09:57.071Z
|
||||||
Stopped at: Completed 01-01-PLAN.md -- ready for 01-02-PLAN.md
|
Stopped at: Completed 01-02-PLAN.md -- Phase 1 complete, ready for Phase 2 planning
|
||||||
Resume file: None
|
Resume file: None
|
||||||
|
|||||||
136
.planning/phases/01-foundation/01-02-SUMMARY.md
Normal file
136
.planning/phases/01-foundation/01-02-SUMMARY.md
Normal file
@@ -0,0 +1,136 @@
|
|||||||
|
---
|
||||||
|
phase: 01-foundation
|
||||||
|
plan: 02
|
||||||
|
subsystem: ui
|
||||||
|
tags: [flutter, go-router, material3, navigation-bar, riverpod, arb-localization]
|
||||||
|
|
||||||
|
# Dependency graph
|
||||||
|
requires:
|
||||||
|
- phase: 01-foundation plan 01
|
||||||
|
provides: Drift database, Riverpod providers, AppTheme, ThemeNotifier, German ARB localization
|
||||||
|
provides:
|
||||||
|
- GoRouter with StatefulShellRoute.indexedStack and 3-tab bottom navigation
|
||||||
|
- App shell (Scaffold + NavigationBar) with localized tab labels and thematic icons
|
||||||
|
- Home placeholder screen with empty state and cross-tab navigation to Rooms
|
||||||
|
- Rooms placeholder screen with empty state and action button
|
||||||
|
- Settings screen with SegmentedButton theme switcher and About section
|
||||||
|
- Fully wired MaterialApp.router with theme, localization, and Riverpod integration
|
||||||
|
- App shell widget test verifying navigation destinations
|
||||||
|
affects: [02-rooms-and-tasks, 03-daily-plan]
|
||||||
|
|
||||||
|
# Tech tracking
|
||||||
|
tech-stack:
|
||||||
|
added: []
|
||||||
|
patterns: [StatefulShellRoute.indexedStack for tab navigation, ConsumerWidget for Riverpod-connected screens, SegmentedButton for enum selection]
|
||||||
|
|
||||||
|
key-files:
|
||||||
|
created:
|
||||||
|
- lib/core/router/router.dart
|
||||||
|
- lib/shell/app_shell.dart
|
||||||
|
- lib/features/home/presentation/home_screen.dart
|
||||||
|
- lib/features/rooms/presentation/rooms_screen.dart
|
||||||
|
- lib/features/settings/presentation/settings_screen.dart
|
||||||
|
- lib/app.dart
|
||||||
|
- test/shell/app_shell_test.dart
|
||||||
|
modified:
|
||||||
|
- lib/main.dart
|
||||||
|
|
||||||
|
key-decisions:
|
||||||
|
- "Used themeProvider (not themeNotifierProvider) -- Riverpod 3 generates without Notifier suffix"
|
||||||
|
|
||||||
|
patterns-established:
|
||||||
|
- "StatefulShellRoute.indexedStack with GoRoute branches for tab navigation"
|
||||||
|
- "ConsumerWidget for screens needing Riverpod state (Settings)"
|
||||||
|
- "AppLocalizations.of(context) for all user-facing text -- zero hardcoded German in Dart"
|
||||||
|
- "SegmentedButton<ThemeMode> pattern for enum-based settings"
|
||||||
|
|
||||||
|
requirements-completed: [FOUND-03, FOUND-04, THEME-01, THEME-02]
|
||||||
|
|
||||||
|
# Metrics
|
||||||
|
duration: 8min
|
||||||
|
completed: 2026-03-15
|
||||||
|
---
|
||||||
|
|
||||||
|
# Phase 1 Plan 02: Navigation Shell and Screens Summary
|
||||||
|
|
||||||
|
**GoRouter 3-tab navigation shell with localized Home/Rooms/Settings screens, SegmentedButton theme switcher persisting via SharedPreferences, and full MaterialApp.router integration -- 16 tests passing, debug APK building**
|
||||||
|
|
||||||
|
## Performance
|
||||||
|
|
||||||
|
- **Duration:** 8 min
|
||||||
|
- **Started:** 2026-03-15T19:01:00Z
|
||||||
|
- **Completed:** 2026-03-15T19:09:00Z
|
||||||
|
- **Tasks:** 3
|
||||||
|
- **Files modified:** 8
|
||||||
|
|
||||||
|
## Accomplishments
|
||||||
|
- GoRouter with StatefulShellRoute.indexedStack providing 3-branch tab navigation (Home, Rooms, Settings)
|
||||||
|
- App shell with NavigationBar using localized German labels ("Ubersicht", "Raume", "Einstellungen") and thematic Material icons
|
||||||
|
- Home and Rooms placeholder screens with playful empty states and action buttons (Home cross-navigates to Rooms tab)
|
||||||
|
- Settings screen with grouped sections: "Darstellung" (SegmentedButton theme switcher for System/Hell/Dunkel) and "Uber" (app name, tagline, version)
|
||||||
|
- MaterialApp.router wired with GoRouter config, light/dark themes, themeMode from ThemeNotifier, and German localization
|
||||||
|
- App shell widget test verifying 3 navigation destinations with correct German labels
|
||||||
|
- Complete Phase 1 app: compiles, launches, passes all 16 tests, builds debug APK
|
||||||
|
|
||||||
|
## Task Commits
|
||||||
|
|
||||||
|
Each task was committed atomically:
|
||||||
|
|
||||||
|
1. **Task 1: Create router, navigation shell, all three screens, and app shell test** - `f2dd737` (feat)
|
||||||
|
2. **Task 2: Wire app.dart and main.dart -- launchable app with full integration** - `014722a` (feat)
|
||||||
|
3. **Task 3: Visual and functional verification** - checkpoint auto-approved (no code changes)
|
||||||
|
|
||||||
|
## Files Created/Modified
|
||||||
|
- `lib/core/router/router.dart` - GoRouter with StatefulShellRoute.indexedStack and 3 branches (/, /rooms, /settings)
|
||||||
|
- `lib/shell/app_shell.dart` - Scaffold with NavigationBar, localized labels, thematic icons
|
||||||
|
- `lib/features/home/presentation/home_screen.dart` - Empty state placeholder with cross-navigation to Rooms tab
|
||||||
|
- `lib/features/rooms/presentation/rooms_screen.dart` - Empty state placeholder with action button
|
||||||
|
- `lib/features/settings/presentation/settings_screen.dart` - SegmentedButton theme switcher + About section
|
||||||
|
- `lib/app.dart` - MaterialApp.router with theme, localization, and Riverpod integration
|
||||||
|
- `lib/main.dart` - Entry point wrapping App in ProviderScope
|
||||||
|
- `test/shell/app_shell_test.dart` - Widget test for navigation shell (FOUND-04)
|
||||||
|
|
||||||
|
## Decisions Made
|
||||||
|
- **Used themeProvider instead of themeNotifierProvider:** Riverpod 3 generates the provider name as `themeProvider` (dropping the Notifier suffix). Plan referenced `themeNotifierProvider` based on older convention. All code uses the correct generated name.
|
||||||
|
|
||||||
|
## Deviations from Plan
|
||||||
|
|
||||||
|
### Auto-fixed Issues
|
||||||
|
|
||||||
|
**1. [Rule 1 - Bug] Used themeProvider instead of themeNotifierProvider**
|
||||||
|
- **Found during:** Task 1 (settings screen and app shell test)
|
||||||
|
- **Issue:** Plan referenced `themeNotifierProvider` but Riverpod 3 code generation produces `themeProvider`
|
||||||
|
- **Fix:** Used correct generated name `themeProvider` throughout all new code
|
||||||
|
- **Files modified:** lib/features/settings/presentation/settings_screen.dart, lib/app.dart, test/shell/app_shell_test.dart
|
||||||
|
- **Verification:** dart analyze passes cleanly, all tests pass
|
||||||
|
- **Committed in:** f2dd737 and 014722a (Task 1 and Task 2 commits)
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
**Total deviations:** 1 auto-fixed (1 bug -- naming convention)
|
||||||
|
**Impact on plan:** Trivial naming difference. No scope creep.
|
||||||
|
|
||||||
|
## Issues Encountered
|
||||||
|
None
|
||||||
|
|
||||||
|
## User Setup Required
|
||||||
|
|
||||||
|
None - no external service configuration required.
|
||||||
|
|
||||||
|
## Next Phase Readiness
|
||||||
|
- Phase 1 complete: app launches with full 3-tab navigation, theme switching, and localization
|
||||||
|
- Drift database ready to receive Room and Task tables in Phase 2
|
||||||
|
- Rooms screen placeholder ready to be replaced with room list + CRUD in Phase 2
|
||||||
|
- Home screen placeholder ready to be replaced with daily plan view in Phase 3
|
||||||
|
- Settings screen pattern established for adding notification settings in Phase 4
|
||||||
|
- All 16 tests passing (database, theme, color scheme, localization, app shell)
|
||||||
|
|
||||||
|
## Self-Check: PASSED
|
||||||
|
|
||||||
|
- All 8 key files verified present on disk
|
||||||
|
- Both task commits verified in git log (f2dd737, 014722a)
|
||||||
|
- Task 3 was checkpoint (auto-approved, no code changes)
|
||||||
|
|
||||||
|
---
|
||||||
|
*Phase: 01-foundation*
|
||||||
|
*Completed: 2026-03-15*
|
||||||