docs(02-01): complete data layer plan summary and state updates
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
@@ -2,16 +2,16 @@
|
||||
gsd_state_version: 1.0
|
||||
milestone: v1.0
|
||||
milestone_name: milestone
|
||||
status: planning
|
||||
stopped_at: Completed 01-02-PLAN.md -- Phase 1 complete, ready for Phase 2 planning
|
||||
last_updated: "2026-03-15T19:15:17.236Z"
|
||||
last_activity: 2026-03-15 — Completed 01-02-PLAN.md (navigation shell, screens, settings, full app wiring)
|
||||
status: executing
|
||||
stopped_at: Completed 02-01-PLAN.md
|
||||
last_updated: "2026-03-15T20:55:19.555Z"
|
||||
last_activity: 2026-03-15 — Completed 02-01-PLAN.md (data layer, DAOs, scheduling, templates)
|
||||
progress:
|
||||
total_phases: 4
|
||||
completed_phases: 1
|
||||
total_plans: 2
|
||||
completed_plans: 2
|
||||
percent: 100
|
||||
total_plans: 7
|
||||
completed_plans: 3
|
||||
percent: 43
|
||||
---
|
||||
|
||||
# Project State
|
||||
@@ -21,35 +21,37 @@ progress:
|
||||
See: .planning/PROJECT.md (updated 2026-03-15)
|
||||
|
||||
**Core value:** Users can see what needs doing today, mark it done, and trust the app to schedule the next occurrence — without thinking about it.
|
||||
**Current focus:** Phase 1: Foundation
|
||||
**Current focus:** Phase 2: Rooms and Tasks
|
||||
|
||||
## Current Position
|
||||
|
||||
Phase: 1 of 4 (Foundation) -- COMPLETE
|
||||
Plan: 2 of 2 in current phase
|
||||
Status: Phase complete -- ready for Phase 2 planning
|
||||
Last activity: 2026-03-15 — Completed 01-02-PLAN.md (navigation shell, screens, settings, full app wiring)
|
||||
Phase: 2 of 4 (Rooms and Tasks)
|
||||
Plan: 1 of 5 in current phase -- COMPLETE
|
||||
Status: Executing Phase 2 -- 02-01 complete, ready for 02-02
|
||||
Last activity: 2026-03-15 — Completed 02-01-PLAN.md (data layer, DAOs, scheduling, templates)
|
||||
|
||||
Progress: [██████████] 100%
|
||||
Progress: [████------] 43%
|
||||
|
||||
## Performance Metrics
|
||||
|
||||
**Velocity:**
|
||||
- Total plans completed: 2
|
||||
- Average duration: 7.5 min
|
||||
- Total execution time: 0.25 hours
|
||||
- Total plans completed: 3
|
||||
- Average duration: 7.7 min
|
||||
- Total execution time: 0.38 hours
|
||||
|
||||
**By Phase:**
|
||||
|
||||
| Phase | Plans | Total | Avg/Plan |
|
||||
|-------|-------|-------|----------|
|
||||
| 1 - Foundation | 2 | 15 min | 7.5 min |
|
||||
| 2 - Rooms and Tasks | 1 | 8 min | 8 min |
|
||||
|
||||
**Recent Trend:**
|
||||
- Last 5 plans: 01-01 (7 min), 01-02 (8 min)
|
||||
- Last 5 plans: 01-01 (7 min), 01-02 (8 min), 02-01 (8 min)
|
||||
- Trend: stable
|
||||
|
||||
*Updated after each plan completion*
|
||||
| Phase 02 P01 | 8 | 2 tasks | 16 files |
|
||||
|
||||
## Accumulated Context
|
||||
|
||||
@@ -66,6 +68,14 @@ Recent decisions affecting current work:
|
||||
- [01-01]: Pinned drift/drift_dev to 2.31.0 for analyzer ^9.0.0 compatibility with riverpod_generator 4.0.3
|
||||
- [01-01]: Generated Riverpod 3 provider named themeProvider (not themeNotifierProvider) per new naming convention
|
||||
- [Phase 01-02]: Used themeProvider (Riverpod 3 naming) instead of themeNotifierProvider referenced in plan
|
||||
- [02-01]: Scheduling functions are top-level pure functions with DateTime today parameter for testability
|
||||
- [02-01]: Calendar-anchored intervals use anchorDay nullable field for month-clamping memory
|
||||
- [02-01]: RoomWithStats computed via asyncMap on watchAllRooms stream, not a custom SQL join
|
||||
- [02-01]: Templates stored as Dart const map for type safety, not JSON assets
|
||||
- [02-01]: detectRoomType uses contains-based matching with alias map
|
||||
- [Phase 02]: Scheduling functions are top-level pure functions with DateTime today parameter for testability
|
||||
- [Phase 02]: Calendar-anchored intervals use anchorDay nullable field for month-clamping memory
|
||||
- [Phase 02]: Templates stored as Dart const map for type safety, not JSON assets
|
||||
|
||||
### Pending Todos
|
||||
|
||||
@@ -73,12 +83,12 @@ None yet.
|
||||
|
||||
### Blockers/Concerns
|
||||
|
||||
- [Research]: Recurrence policy edge cases not fully specified — "monthly" on the 31st, seasonal interval definition. Decide before Phase 2 planning.
|
||||
- ~~[Research]: Recurrence policy edge cases not fully specified~~ — **RESOLVED** in 2-CONTEXT.md: calendar-anchored intervals clamp to last day with anchor memory, day-count intervals roll forward. Next due from original due date. Catch-up skips to next future date.
|
||||
- [Research]: Notification time configuration (user-adjustable vs hardcoded) not resolved. Decide before Phase 4 planning.
|
||||
- [Research]: First-launch template seeding UX (silent vs prompted) not resolved. Decide before Phase 2 planning.
|
||||
- ~~[Research]: First-launch template seeding UX (silent vs prompted) not resolved~~ — **RESOLVED** in 2-CONTEXT.md: post-creation prompt with all templates unchecked. Room type is optional, detected from name. Custom rooms skip templates entirely.
|
||||
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-03-15T19:09:57.071Z
|
||||
Stopped at: Completed 01-02-PLAN.md -- Phase 1 complete, ready for Phase 2 planning
|
||||
Last session: 2026-03-15T20:55:13.060Z
|
||||
Stopped at: Completed 02-01-PLAN.md
|
||||
Resume file: None
|
||||
|
||||
Reference in New Issue
Block a user