# Milestones
|
||||||
|
|
||||||
|
## v1.0 MVP (Shipped: 2026-03-16)
|
||||||
|
|
||||||
|
**Phases completed:** 4 phases, 13 plans
|
||||||
|
**Codebase:** 10,588 LOC Dart (7,773 lib + 2,815 test), 89 tests, 76 commits
|
||||||
|
**Timeline:** 2 days (2026-03-15 to 2026-03-16)
|
||||||
|
|
||||||
|
**Key accomplishments:**
|
||||||
|
1. Flutter project with Drift SQLite, Riverpod 3 state management, ARB localization, and calm sage & stone Material 3 theme
|
||||||
|
2. Full room CRUD with drag-and-drop reorder, icon picker, and cleanliness indicator per room card
|
||||||
|
3. Task CRUD with 11 frequency presets + custom intervals, calendar-anchored scheduling with anchor memory, and auto-calculated next due dates
|
||||||
|
4. Bundled German-language task templates for 14 room types with post-creation template picker
|
||||||
|
5. Daily plan home screen with overdue/today/tomorrow sections, animated checkbox completion, and progress tracking
|
||||||
|
6. Daily summary notification with configurable time, POST_NOTIFICATIONS permission handling, and boot receiver rescheduling
|
||||||
|
|
||||||
|
**Archive:** See `milestones/v1.0-ROADMAP.md` and `milestones/v1.0-REQUIREMENTS.md`
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
@@ -2,7 +2,7 @@
|
|||||||
|
|
||||||
## What This Is
|
## What This Is
|
||||||
|
|
||||||
A local-first Flutter app for organizing household chores and one-time projects, built for personal/couple use on Android. Takes the room-based task scheduling model (inspired by BeTidy), strips cloud/account/social features, and wraps it in a calm, minimal Material 3 UI. Fully offline, free, privacy-respecting — all data stays on-device.
|
A local-first Flutter app for organizing household chores, built for personal/couple use on Android. Uses a room-based task scheduling model where users create rooms, add recurring tasks with frequency intervals, and the app auto-calculates the next due date after each completion. Features a daily plan home screen, bundled German-language task templates, room cleanliness indicators, and daily summary notifications. Fully offline, free, privacy-respecting — all data stays on-device.
|
||||||
|
|
||||||
## Core Value
|
## Core Value
|
||||||
|
|
||||||
@@ -12,20 +12,22 @@ Users can see what needs doing today, mark it done, and trust the app to schedul
|
|||||||
|
|
||||||
### Validated
|
### Validated
|
||||||
|
|
||||||
(None yet — ship to validate)
|
- Room CRUD with icons and drag-and-drop reorder — v1.0
|
||||||
|
- Task CRUD with frequency intervals and due date calculation — v1.0
|
||||||
|
- Daily plan view with overdue/today/upcoming sections — v1.0
|
||||||
|
- Task completion with auto-scheduling of next due date — v1.0
|
||||||
|
- Bundled task templates per room type (German only, 14 room types) — v1.0
|
||||||
|
- Daily summary notification with configurable time — v1.0
|
||||||
|
- Light/dark theme with calm Material 3 palette — v1.0
|
||||||
|
- Cleanliness indicator per room (based on overdue vs on-time) — v1.0
|
||||||
|
|
||||||
### Active
|
### Active
|
||||||
|
|
||||||
- [ ] Room CRUD with icons and optional photos
|
- [ ] Data export/import (JSON)
|
||||||
- [ ] Task CRUD with frequency intervals and due date calculation
|
- [ ] English localization
|
||||||
- [ ] Daily plan view with overdue/today/upcoming sections
|
- [ ] Room cover photos from camera or gallery
|
||||||
- [ ] Task completion with auto-scheduling of next due date
|
- [ ] Task completion history log
|
||||||
- [ ] Bundled task templates per room type (German only)
|
- [ ] Additional task sorting (alphabetical, interval, effort)
|
||||||
- [ ] Daily summary notification
|
|
||||||
- [ ] Light/dark theme with calm Material 3 palette
|
|
||||||
- [ ] Cleanliness indicator per room (based on overdue vs on-time)
|
|
||||||
- [ ] Task sorting (due date, alphabetical, interval, effort)
|
|
||||||
- [ ] Task history (completion log per task)
|
|
||||||
|
|
||||||
### Out of Scope
|
### Out of Scope
|
||||||
|
|
||||||
@@ -34,8 +36,9 @@ Users can see what needs doing today, mark it done, and trust the app to schedul
|
|||||||
- Subscription model / in-app purchases — free forever
|
- Subscription model / in-app purchases — free forever
|
||||||
- Family profile sharing across devices — single-device app
|
- Family profile sharing across devices — single-device app
|
||||||
- Server-side infrastructure — zero backend
|
- Server-side infrastructure — zero backend
|
||||||
- Data export/import (JSON) — deferred to v1.1
|
- AI-powered task suggestions — overkill for curated templates
|
||||||
- English localization — deferred to v1.1 (ship German-only MVP)
|
- Per-task push notifications — daily summary is more effective
|
||||||
|
- Firebase or any Google cloud services — contradicts local-first design
|
||||||
- Real-time cross-device sync — potential future self-hosted feature
|
- Real-time cross-device sync — potential future self-hosted feature
|
||||||
- Tablet-optimized layout — future enhancement
|
- Tablet-optimized layout — future enhancement
|
||||||
- Statistics & insights dashboard — v2.0
|
- Statistics & insights dashboard — v2.0
|
||||||
@@ -44,11 +47,11 @@ Users can see what needs doing today, mark it done, and trust the app to schedul
|
|||||||
|
|
||||||
## Context
|
## Context
|
||||||
|
|
||||||
- Inspired by BeTidy (iOS/Android household cleaning app) — taking the proven room-based model, removing cloud/social, refining the UI
|
- Shipped v1.0 MVP with 10,588 LOC Dart (7,773 lib + 2,815 test), 89 tests
|
||||||
|
- Tech stack: Flutter + Dart, Riverpod 3 + code generation, Drift 2.31 SQLite, GoRouter, flutter_local_notifications
|
||||||
|
- Inspired by BeTidy (iOS/Android household cleaning app) — room-based model, no cloud/social
|
||||||
- Built for personal use with partner on a shared Android device; may publish publicly later
|
- Built for personal use with partner on a shared Android device; may publish publicly later
|
||||||
- Code and comments in English; UI strings German-only for MVP
|
- Code and comments in English; UI strings German-only for v1.0
|
||||||
- Room photos are nice-to-have for MVP — icon-only rooms are sufficient initially
|
|
||||||
- Developer is new to Drift (SQLite ORM) — plan should account for learning curve
|
|
||||||
- Gitea (self-hosted on Hetzner) for version control; no CI/CD pipeline yet
|
- Gitea (self-hosted on Hetzner) for version control; no CI/CD pipeline yet
|
||||||
|
|
||||||
## Constraints
|
## Constraints
|
||||||
@@ -57,20 +60,23 @@ Users can see what needs doing today, mark it done, and trust the app to schedul
|
|||||||
- **Platform**: Android-first (iOS later)
|
- **Platform**: Android-first (iOS later)
|
||||||
- **Offline**: 100% offline-capable, zero network dependencies
|
- **Offline**: 100% offline-capable, zero network dependencies
|
||||||
- **Privacy**: No data leaves the device, no analytics, no tracking
|
- **Privacy**: No data leaves the device, no analytics, no tracking
|
||||||
- **Language**: German-only UI for MVP, English code/comments
|
- **Language**: German-only UI for v1.0, English code/comments
|
||||||
- **No CI**: No automated build pipeline initially
|
- **No CI**: No automated build pipeline initially
|
||||||
|
|
||||||
## Key Decisions
|
## Key Decisions
|
||||||
|
|
||||||
| Decision | Rationale | Outcome |
|
| Decision | Rationale | Outcome |
|
||||||
|----------|-----------|---------|
|
|----------|-----------|---------|
|
||||||
| Riverpod over Bloc | Modern, compile-safe, less boilerplate, Dart-native | — Pending |
|
| Riverpod 3 over Bloc | Modern, compile-safe, less boilerplate, Dart-native | Good — code generation works well, @riverpod annotation reduces boilerplate |
|
||||||
| Drift over raw sqflite | Type-safe queries, compile-time validation, migration support | — Pending |
|
| Drift over raw sqflite | Type-safe queries, compile-time validation, migration support | Good — DAOs with stream queries provide reactive UI, migration workflow established |
|
||||||
| Android-first | Primary device is Android; iOS follows | — Pending |
|
| Android-first | Primary device is Android; iOS follows | Good — no iOS-specific issues encountered |
|
||||||
| German-only MVP | Primary user language; defer localization infrastructure | — Pending |
|
| German-only MVP | Primary user language; defer localization infrastructure | Good — ARB localization infrastructure in place from Phase 1, ready for English |
|
||||||
| No CI initially | Keep scope focused on the app itself | — Pending |
|
| No CI initially | Keep scope focused on the app itself | Good — manual dart analyze + flutter test sufficient for solo dev |
|
||||||
| Calm Material 3 palette | Muted greens, warm grays, gentle blues — calm productivity, not playful | — Pending |
|
| Calm Material 3 palette | Muted greens, warm grays, gentle blues — calm productivity | Good — sage & stone theme (seed 0xFF7A9A6D) with warm charcoal dark mode |
|
||||||
| Clean Architecture | Feature-based folder structure with data/domain/presentation layers | — Pending |
|
| Clean Architecture | Feature-based folder structure with data/domain/presentation layers | Good — clear separation, easy to navigate |
|
||||||
|
| Calendar-anchored scheduling | Monthly/quarterly/yearly tasks anchor to original day-of-month with clamping | Good — handles Feb 28/31 edge cases correctly with anchor memory |
|
||||||
|
| flutter_local_notifications v21 | Standard Flutter notification package, TZ-aware scheduling | Good — inexactAllowWhileIdle avoids SCHEDULE_EXACT_ALARM complexity |
|
||||||
|
| Manual StreamProvider for drift types | riverpod_generator throws InvalidTypeException with drift Task type | Revisit — may be fixed in future riverpod_generator versions |
|
||||||
|
|
||||||
---
|
---
|
||||||
*Last updated: 2026-03-15 after initialization*
|
*Last updated: 2026-03-16 after v1.0 milestone*
|
||||||
|
|||||||
65
.planning/RETROSPECTIVE.md
Normal file
65
.planning/RETROSPECTIVE.md
Normal file
@@ -0,0 +1,65 @@
|
|||||||
|
# Project Retrospective
|
||||||
|
|
||||||
|
*A living document updated after each milestone. Lessons feed forward into future planning.*
|
||||||
|
|
||||||
|
## Milestone: v1.0 — MVP
|
||||||
|
|
||||||
|
**Shipped:** 2026-03-16
|
||||||
|
**Phases:** 4 | **Plans:** 13
|
||||||
|
|
||||||
|
### What Was Built
|
||||||
|
- Complete room-based household chore app with auto-scheduling task management
|
||||||
|
- Daily plan home screen with overdue/today/tomorrow sections and progress tracking
|
||||||
|
- Bundled German task templates for 14 room types
|
||||||
|
- Daily summary notifications with configurable time and Android permission handling
|
||||||
|
- 89 tests covering DAOs, scheduling logic, providers, and widget behavior
|
||||||
|
|
||||||
|
### What Worked
|
||||||
|
- Bottom-up phase structure (foundation -> data -> UI -> polish) kept each phase clean with minimal rework
|
||||||
|
- TDD approach for providers and services caught several issues early (async race conditions, API mismatches)
|
||||||
|
- Verification gates at the end of Phase 2, 3, and 4 confirmed all requirements before moving on
|
||||||
|
- Calendar-anchored scheduling with anchor memory was designed right the first time — no rework needed
|
||||||
|
- ARB localization from Phase 1 meant adding German strings was frictionless throughout
|
||||||
|
|
||||||
|
### What Was Inefficient
|
||||||
|
- riverpod_generator InvalidTypeException with drift Task type required workaround (manual StreamProvider) in 3 separate plans — should have been caught in Phase 1 research
|
||||||
|
- Some plan specifications referenced outdated API patterns (flutter_local_notifications positional parameters removed in v20+) — research needs to verify exact current API signatures
|
||||||
|
- Phase 4 plan checkboxes in ROADMAP.md weren't updated to [x] by executor — minor bookkeeping gap
|
||||||
|
|
||||||
|
### Patterns Established
|
||||||
|
- `@Riverpod(keepAlive: true)` AsyncNotifier with SharedPreferences for persistent settings (ThemeNotifier, NotificationSettingsNotifier)
|
||||||
|
- Manual StreamProvider.family/autoDispose for drift type compatibility
|
||||||
|
- DailyPlanDao innerJoin pattern for cross-table queries
|
||||||
|
- ConsumerStatefulWidget for screens with async callbacks requiring `mounted` guards
|
||||||
|
- Provider override pattern in widget tests for database isolation
|
||||||
|
|
||||||
|
### Key Lessons
|
||||||
|
1. Research phase should verify exact current package API signatures — breaking changes between major versions cause plan deviations
|
||||||
|
2. Drift + riverpod_generator type incompatibility is a known issue — plan for manual providers from the start when using drift
|
||||||
|
3. Verification gates add minimal time (~2 min) but catch integration issues — keep them for all phases
|
||||||
|
4. Progressive disclosure (AnimatedSize) is a clean pattern for conditional settings UI
|
||||||
|
|
||||||
|
### Cost Observations
|
||||||
|
- Model mix: orchestrator on opus, researchers/planners/executors/checkers on sonnet
|
||||||
|
- Total execution: ~1.3 hours for 13 plans across 4 phases
|
||||||
|
- Notable: Verification gates averaged 2 min — very efficient for the confidence they provide
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
|
## Cross-Milestone Trends
|
||||||
|
|
||||||
|
### Process Evolution
|
||||||
|
|
||||||
|
| Milestone | Phases | Plans | Key Change |
|
||||||
|
|-----------|--------|-------|------------|
|
||||||
|
| v1.0 | 4 | 13 | Initial project — established all patterns |
|
||||||
|
|
||||||
|
### Cumulative Quality
|
||||||
|
|
||||||
|
| Milestone | Tests | Key Metric |
|
||||||
|
|-----------|-------|------------|
|
||||||
|
| v1.0 | 89 | dart analyze clean, 0 issues |
|
||||||
|
|
||||||
|
### Top Lessons (Verified Across Milestones)
|
||||||
|
|
||||||
|
1. (Single milestone — lessons above will be cross-validated as more milestones ship)
|
||||||
@@ -1,100 +1,28 @@
|
|||||||
# Roadmap: HouseHoldKeaper
|
# Roadmap: HouseHoldKeaper
|
||||||
|
|
||||||
## Overview
|
## Milestones
|
||||||
|
|
||||||
Four phases build the app bottom-up along its natural dependency chain. Phase 1 lays the technical foundation every subsequent phase relies on. Phase 2 delivers complete room and task management — the core scheduling loop. Phase 3 surfaces that data as the daily plan view (the primary user experience) and adds the cleanliness indicator. Phase 4 adds notifications and completes the v1 feature set. After Phase 3, the app is usable daily. After Phase 4, it is releasable.
|
- **v1.0 MVP** — Phases 1-4 (shipped 2026-03-16)
|
||||||
|
|
||||||
## Phases
|
## Phases
|
||||||
|
|
||||||
**Phase Numbering:**
|
<details>
|
||||||
- Integer phases (1, 2, 3): Planned milestone work
|
<summary>v1.0 MVP (Phases 1-4) — SHIPPED 2026-03-16</summary>
|
||||||
- Decimal phases (2.1, 2.2): Urgent insertions (marked with INSERTED)
|
|
||||||
|
|
||||||
Decimal phases appear between their surrounding integers in numeric order.
|
- [x] Phase 1: Foundation (2/2 plans) — completed 2026-03-15
|
||||||
|
- [x] Phase 2: Rooms and Tasks (5/5 plans) — completed 2026-03-15
|
||||||
|
- [x] Phase 3: Daily Plan and Cleanliness (3/3 plans) — completed 2026-03-16
|
||||||
|
- [x] Phase 4: Notifications (3/3 plans) — completed 2026-03-16
|
||||||
|
|
||||||
- [x] **Phase 1: Foundation** - Project scaffold, database, state management, theme, and localization infrastructure (completed 2026-03-15)
|
See `milestones/v1.0-ROADMAP.md` for full phase details.
|
||||||
- [x] **Phase 2: Rooms and Tasks** - Complete room CRUD, task CRUD with auto-scheduling, and bundled templates (completed 2026-03-15)
|
|
||||||
- [x] **Phase 3: Daily Plan and Cleanliness** - Primary daily plan screen with overdue/today/upcoming, cleanliness indicators per room (completed 2026-03-16)
|
|
||||||
- [x] **Phase 4: Notifications** - Daily summary notification with configurable time and Android permission handling (completed 2026-03-16)
|
|
||||||
|
|
||||||
## Phase Details
|
</details>
|
||||||
|
|
||||||
### Phase 1: Foundation
|
|
||||||
**Goal**: The app compiles, opens, and enforces correct architecture patterns — ready to receive features without accumulating technical debt
|
|
||||||
**Depends on**: Nothing (first phase)
|
|
||||||
**Requirements**: FOUND-01, FOUND-02, FOUND-03, FOUND-04, THEME-01, THEME-02
|
|
||||||
**Success Criteria** (what must be TRUE):
|
|
||||||
1. App launches on Android without errors and shows a bottom navigation bar with Home, Rooms, and Settings tabs
|
|
||||||
2. Light and dark themes work correctly and follow the system setting by default, using the calm Material 3 palette (muted greens, warm grays, gentle blues)
|
|
||||||
3. All UI strings are loaded from ARB localization files — no hardcoded German text in Dart code
|
|
||||||
4. The Drift database opens on first launch with schemaVersion 1 and the migration workflow is established (drift_dev make-migrations runs without errors)
|
|
||||||
5. riverpod_lint is active and flags ref.watch usage outside build() as an analysis error
|
|
||||||
**Plans**: 2 plans
|
|
||||||
Plans:
|
|
||||||
- [x] 01-01-PLAN.md — Scaffold Flutter project and build core infrastructure (database, providers, theme, localization)
|
|
||||||
- [x] 01-02-PLAN.md — Navigation shell, placeholder screens, Settings, and full app wiring
|
|
||||||
|
|
||||||
### Phase 2: Rooms and Tasks
|
|
||||||
**Goal**: Users can create and manage rooms and tasks, mark tasks done, and trust the app to schedule the next occurrence automatically
|
|
||||||
**Depends on**: Phase 1
|
|
||||||
**Requirements**: ROOM-01, ROOM-02, ROOM-03, ROOM-04, ROOM-05, TASK-01, TASK-02, TASK-03, TASK-04, TASK-05, TASK-06, TASK-07, TASK-08, TMPL-01, TMPL-02
|
|
||||||
**Success Criteria** (what must be TRUE):
|
|
||||||
1. User can create a room with a name and icon, edit it, reorder rooms via drag-and-drop, and delete it (with confirmation that removes all associated tasks)
|
|
||||||
2. User can create a task in a room with name, description, frequency interval (daily through yearly and custom), and effort level; tasks can be edited and deleted with confirmation
|
|
||||||
3. When creating a room, user can select from bundled German-language task templates for the chosen room type (all 14 room types covered) and they are added to the room as tasks
|
|
||||||
4. User can mark a task done (tap or swipe), which records the completion and sets the next due date correctly based on the interval
|
|
||||||
5. Overdue tasks are visually highlighted with a distinct color or badge on room cards and in task lists; tasks within a room are sorted by due date by default
|
|
||||||
6. Each room card shows its name, icon, count of due tasks, and cleanliness indicator
|
|
||||||
**Plans**: 5 plans
|
|
||||||
Plans:
|
|
||||||
- [x] 02-01-PLAN.md — Data layer: Drift tables, migration v1->v2, DAOs, scheduling utility, domain models, templates, tests
|
|
||||||
- [x] 02-02-PLAN.md — Room CRUD UI: 2-column card grid, room form, icon picker, drag-and-drop reorder, providers
|
|
||||||
- [x] 02-03-PLAN.md — Task CRUD UI: task list, task row with completion, task form, overdue highlighting, providers
|
|
||||||
- [x] 02-04-PLAN.md — Template selection: template picker bottom sheet, room type detection, integration with room creation
|
|
||||||
- [x] 02-05-PLAN.md — Visual and functional verification checkpoint
|
|
||||||
|
|
||||||
### Phase 3: Daily Plan and Cleanliness
|
|
||||||
**Goal**: Users can open the app and immediately see what needs doing today, act on tasks directly from the plan view, and see a room-level health indicator
|
|
||||||
**Depends on**: Phase 2
|
|
||||||
**Requirements**: PLAN-01, PLAN-02, PLAN-03, PLAN-04, PLAN-05, PLAN-06, CLEAN-01
|
|
||||||
**Success Criteria** (what must be TRUE):
|
|
||||||
1. The Home tab shows today's tasks grouped by room, with a separate highlighted section at the top for overdue tasks
|
|
||||||
2. User can mark a task done directly from the daily plan view via swipe or checkbox without navigating to the room
|
|
||||||
3. User can see upcoming tasks (tomorrow and this week) from the daily plan screen
|
|
||||||
4. A progress indicator shows completed vs total tasks for today (e.g., "5 von 12 erledigt")
|
|
||||||
5. When no tasks are due, an encouraging "all clear" empty state is shown instead of an empty list
|
|
||||||
6. Each room card displays a cleanliness indicator derived from the ratio of overdue tasks to total tasks in that room
|
|
||||||
**Plans**: 3 plans
|
|
||||||
Plans:
|
|
||||||
- [x] 03-01-PLAN.md — Data layer: DailyPlanDao with cross-room join query, providers, and localization keys
|
|
||||||
- [x] 03-02-PLAN.md — Daily plan UI: HomeScreen rewrite with progress card, task sections, animated completion, empty state
|
|
||||||
- [x] 03-03-PLAN.md — Visual and functional verification checkpoint
|
|
||||||
|
|
||||||
### Phase 4: Notifications
|
|
||||||
**Goal**: Users receive a daily summary notification reminding them of today's task count, and can control notification behavior from settings
|
|
||||||
**Depends on**: Phase 2
|
|
||||||
**Requirements**: NOTF-01, NOTF-02
|
|
||||||
**Success Criteria** (what must be TRUE):
|
|
||||||
1. User receives one daily notification showing the count of tasks due today, scheduled at a configurable time
|
|
||||||
2. User can enable or disable notifications from the Settings tab, and the change takes effect immediately
|
|
||||||
3. Notifications are correctly rescheduled after device reboot (RECEIVE_BOOT_COMPLETED receiver active)
|
|
||||||
4. On Android API 33+, the app requests POST_NOTIFICATIONS permission at the appropriate moment and degrades gracefully if denied
|
|
||||||
**Plans**: 3 plans
|
|
||||||
Plans:
|
|
||||||
- [ ] 04-01-PLAN.md — Infrastructure: packages, Android config, NotificationService, NotificationSettingsNotifier, DAO queries, timezone init, tests
|
|
||||||
- [ ] 04-02-PLAN.md — Settings UI: Benachrichtigungen section with toggle, time picker, permission flow, scheduling wiring, tests
|
|
||||||
- [ ] 04-03-PLAN.md — Verification gate: dart analyze + full test suite + requirement confirmation
|
|
||||||
|
|
||||||
## Progress
|
## Progress
|
||||||
|
|
||||||
**Execution Order:**
|
| Phase | Milestone | Plans Complete | Status | Completed |
|
||||||
Phases execute in numeric order: 1 -> 2 -> 3 -> 4
|
|-------|-----------|----------------|--------|-----------|
|
||||||
|
| 1. Foundation | v1.0 | 2/2 | Complete | 2026-03-15 |
|
||||||
Note: Phase 4 depends on Phase 2 (needs scheduling data) but can be developed in parallel with Phase 3.
|
| 2. Rooms and Tasks | v1.0 | 5/5 | Complete | 2026-03-15 |
|
||||||
|
| 3. Daily Plan and Cleanliness | v1.0 | 3/3 | Complete | 2026-03-16 |
|
||||||
| Phase | Plans Complete | Status | Completed |
|
| 4. Notifications | v1.0 | 3/3 | Complete | 2026-03-16 |
|
||||||
|-------|----------------|--------|-----------|
|
|
||||||
| 1. Foundation | 2/2 | Complete | 2026-03-15 |
|
|
||||||
| 2. Rooms and Tasks | 5/5 | Complete | 2026-03-15 |
|
|
||||||
| 3. Daily Plan and Cleanliness | 3/3 | Complete | 2026-03-16 |
|
|
||||||
| 4. Notifications | 3/3 | Complete | 2026-03-16 |
|
|
||||||
|
|||||||
@@ -1,11 +1,11 @@
|
|||||||
---
|
---
|
||||||
gsd_state_version: 1.0
|
gsd_state_version: 1.0
|
||||||
milestone: v1.0
|
milestone: v1.0
|
||||||
milestone_name: milestone
|
milestone_name: MVP
|
||||||
status: executing
|
status: shipped
|
||||||
stopped_at: Completed 04-03-PLAN.md (Phase 4 Verification Gate)
|
stopped_at: v1.0 milestone complete
|
||||||
last_updated: "2026-03-16T14:20:25.850Z"
|
last_updated: "2026-03-16T20:00:00.000Z"
|
||||||
last_activity: 2026-03-16 — Completed 04-01-PLAN.md (Notification infrastructure)
|
last_activity: 2026-03-16 — v1.0 MVP milestone shipped
|
||||||
progress:
|
progress:
|
||||||
total_phases: 4
|
total_phases: 4
|
||||||
completed_phases: 4
|
completed_phases: 4
|
||||||
@@ -18,26 +18,25 @@ progress:
|
|||||||
|
|
||||||
## Project Reference
|
## Project Reference
|
||||||
|
|
||||||
See: .planning/PROJECT.md (updated 2026-03-15)
|
See: .planning/PROJECT.md (updated 2026-03-16)
|
||||||
|
|
||||||
**Core value:** Users can see what needs doing today, mark it done, and trust the app to schedule the next occurrence — without thinking about it.
|
**Core value:** Users can see what needs doing today, mark it done, and trust the app to schedule the next occurrence — without thinking about it.
|
||||||
**Current focus:** Phase 4: Notifications (Phase 3 complete)
|
**Current focus:** v1.0 shipped — planning next milestone
|
||||||
|
|
||||||
## Current Position
|
## Current Position
|
||||||
|
|
||||||
Phase: 4 of 4 (Notifications)
|
Milestone: v1.0 MVP — SHIPPED 2026-03-16
|
||||||
Plan: 1 of 2 in current phase -- COMPLETE
|
Status: All 4 phases complete, 13/13 plans executed, 89 tests passing
|
||||||
Status: Phase 4 in progress — plan 1 complete, plan 2 (Settings UI) pending
|
Next: `/gsd:new-milestone` for v1.1
|
||||||
Last activity: 2026-03-16 — Completed 04-01-PLAN.md (Notification infrastructure)
|
|
||||||
|
|
||||||
Progress: [██████████] 100%
|
Progress: [##########] 100%
|
||||||
|
|
||||||
## Performance Metrics
|
## Performance Metrics
|
||||||
|
|
||||||
**Velocity:**
|
**Velocity:**
|
||||||
- Total plans completed: 10
|
- Total plans completed: 13
|
||||||
- Average duration: 6.1 min
|
- Total execution time: ~1.3 hours
|
||||||
- Total execution time: 1.0 hours
|
- Average duration: ~6 min/plan
|
||||||
|
|
||||||
**By Phase:**
|
**By Phase:**
|
||||||
|
|
||||||
@@ -46,85 +45,24 @@ Progress: [██████████] 100%
|
|||||||
| 1 - Foundation | 2 | 15 min | 7.5 min |
|
| 1 - Foundation | 2 | 15 min | 7.5 min |
|
||||||
| 2 - Rooms and Tasks | 5 | 35 min | 7.0 min |
|
| 2 - Rooms and Tasks | 5 | 35 min | 7.0 min |
|
||||||
| 3 - Daily Plan and Cleanliness | 3 | 11 min | 3.7 min |
|
| 3 - Daily Plan and Cleanliness | 3 | 11 min | 3.7 min |
|
||||||
|
| 4 - Notifications | 3 | 16 min | 5.3 min |
|
||||||
**Recent Trend:**
|
|
||||||
- Last 5 plans: 02-04 (3 min), 02-05 (1 min), 03-01 (5 min), 03-02 (4 min), 03-03 (2 min)
|
|
||||||
- Trend: Verification gates consistently fast (1-2 min)
|
|
||||||
|
|
||||||
*Updated after each plan completion*
|
|
||||||
| Phase 02 P01 | 8 | 2 tasks | 16 files |
|
|
||||||
| Phase 02 P02 | 11 | 2 tasks | 14 files |
|
|
||||||
| Phase 02 P03 | 12 | 2 tasks | 8 files |
|
|
||||||
| Phase 02 P04 | 3 | 2 tasks | 5 files |
|
|
||||||
| Phase 02 P05 | 1 | 1 task | 0 files |
|
|
||||||
| Phase 03 P01 | 5 | 2 tasks | 10 files |
|
|
||||||
| Phase 03 P02 | 4 | 2 tasks | 5 files |
|
|
||||||
| Phase 03 P03 | 2 | 2 tasks | 0 files |
|
|
||||||
| Phase 04-notifications P01 | 9 | 2 tasks | 11 files |
|
|
||||||
| Phase 04-notifications P02 | 5 | 2 tasks | 5 files |
|
|
||||||
| Phase 04-notifications P03 | 2 | 1 tasks | 0 files |
|
|
||||||
|
|
||||||
## Accumulated Context
|
## Accumulated Context
|
||||||
|
|
||||||
### Decisions
|
### Decisions
|
||||||
|
|
||||||
Decisions are logged in PROJECT.md Key Decisions table.
|
All v1.0 decisions are recorded in PROJECT.md Key Decisions table with outcomes.
|
||||||
Recent decisions affecting current work:
|
|
||||||
|
|
||||||
- [Pre-phase]: Riverpod 3.3 requires Flutter 3.41+ — verify before scaffolding
|
|
||||||
- [Pre-phase]: All due dates stored as date-only (calendar day), not DateTime — enforce from first migration
|
|
||||||
- [Pre-phase]: German-only UI for MVP; localization infrastructure (ARB + AppLocalizations) required from Phase 1 even with one locale
|
|
||||||
- [Pre-phase]: riverpod_lint must be active before any feature code — catches ref.watch outside build() at analysis time
|
|
||||||
- [Pre-phase]: drift_dev make-migrations workflow must be established in Phase 1 — recovery cost is data loss
|
|
||||||
- [01-01]: Pinned drift/drift_dev to 2.31.0 for analyzer ^9.0.0 compatibility with riverpod_generator 4.0.3
|
|
||||||
- [01-01]: Generated Riverpod 3 provider named themeProvider (not themeNotifierProvider) per new naming convention
|
|
||||||
- [Phase 01-02]: Used themeProvider (Riverpod 3 naming) instead of themeNotifierProvider referenced in plan
|
|
||||||
- [02-01]: Scheduling functions are top-level pure functions with DateTime today parameter for testability
|
|
||||||
- [02-01]: Calendar-anchored intervals use anchorDay nullable field for month-clamping memory
|
|
||||||
- [02-01]: RoomWithStats computed via asyncMap on watchAllRooms stream, not a custom SQL join
|
|
||||||
- [02-01]: Templates stored as Dart const map for type safety, not JSON assets
|
|
||||||
- [02-01]: detectRoomType uses contains-based matching with alias map
|
|
||||||
- [Phase 02]: Scheduling functions are top-level pure functions with DateTime today parameter for testability
|
|
||||||
- [Phase 02]: Calendar-anchored intervals use anchorDay nullable field for month-clamping memory
|
|
||||||
- [Phase 02]: Templates stored as Dart const map for type safety, not JSON assets
|
|
||||||
- [02-02]: ReorderableBuilder<Widget> with typed onReorder callback for drag-and-drop grid
|
|
||||||
- [02-02]: Long-press context menu (bottom sheet) for edit/delete on room cards
|
|
||||||
- [02-02]: Provider override pattern in tests to decouple from database dependency
|
|
||||||
- [02-03]: tasksInRoomProvider defined as manual StreamProvider.family due to riverpod_generator InvalidTypeException with drift Task type
|
|
||||||
- [02-03]: Frequency selector uses ChoiceChip Wrap layout for 10 presets plus custom option
|
|
||||||
- [02-03]: TaskRow uses ListTile with middle-dot separator between relative date and frequency label
|
|
||||||
- [02-04]: Template picker uses StatefulWidget (not Consumer) receiving data via constructor
|
|
||||||
- [02-04]: Room creation navigates to /rooms/$roomId (context.go) instead of context.pop to show new room
|
|
||||||
- [02-04]: Calendar-anchored intervals set anchorDay to today's day-of-month; day-count intervals set null
|
|
||||||
- [02-05]: Auto-approved verification checkpoint: dart analyze clean, 59/59 tests passing, all Phase 2 code integrated
|
|
||||||
- [03-01]: DailyPlanDao uses innerJoin (not leftOuterJoin) since tasks always have a room
|
|
||||||
- [03-01]: watchCompletionsToday uses customSelect with readsFrom for proper stream invalidation
|
|
||||||
- [03-01]: dailyPlanProvider uses manual StreamProvider.autoDispose (not @riverpod) due to drift Task type issue
|
|
||||||
- [03-01]: Progress total = remaining overdue + remaining today + completedTodayCount for stable denominator
|
|
||||||
- [03-02]: Used stream-driven completion with local _completingTaskIds Set for animation instead of AnimatedList
|
|
||||||
- [03-02]: DailyPlanTaskRow is StatelessWidget (not ConsumerWidget) -- completion callback passed in from parent
|
|
||||||
- [03-02]: No-tasks empty state uses dailyPlanNoTasks key for clearer daily plan context messaging
|
|
||||||
- [03-03]: Phase 3 verification gate passed: dart analyze clean, 72/72 tests, all 7 requirements confirmed functional
|
|
||||||
- [Phase 04-01]: timezone constraint upgraded to ^0.11.0 — flutter_local_notifications v21 requires ^0.11.0, plan specified ^0.9.4
|
|
||||||
- [Phase 04-01]: flutter_local_notifications v21 uses named parameters in initialize() and zonedSchedule() — positional API removed in v20+
|
|
||||||
- [Phase 04-01]: Generated Riverpod 3 provider named notificationSettingsProvider (not notificationSettingsNotifierProvider) — consistent with themeProvider naming convention
|
|
||||||
- [Phase 04-01]: nextInstanceOf exposed as @visibleForTesting public method to enable TZ logic unit testing without native dispatch mocking
|
|
||||||
- [Phase Phase 04-02]: openNotificationSettings() not available in flutter_local_notifications v21 — simplified to informational SnackBar (no action button)
|
|
||||||
- [Phase Phase 04-02]: ConsumerStatefulWidget for SettingsScreen — async permission callbacks require mounted guards after every await
|
|
||||||
- [Phase 04-notifications]: Phase 4 verification gate passed: dart analyze --fatal-infos zero issues, 89/89 tests passing — all NOTF-01 and NOTF-02 requirements confirmed functional
|
|
||||||
|
|
||||||
### Pending Todos
|
### Pending Todos
|
||||||
|
|
||||||
None yet.
|
None.
|
||||||
|
|
||||||
### Blockers/Concerns
|
### Blockers/Concerns
|
||||||
|
|
||||||
- ~~[Research]: Recurrence policy edge cases not fully specified~~ — **RESOLVED** in 2-CONTEXT.md: calendar-anchored intervals clamp to last day with anchor memory, day-count intervals roll forward. Next due from original due date. Catch-up skips to next future date.
|
None — all v1.0 blockers resolved.
|
||||||
- [Research]: Notification time configuration (user-adjustable vs hardcoded) not resolved. Decide before Phase 4 planning.
|
|
||||||
- ~~[Research]: First-launch template seeding UX (silent vs prompted) not resolved~~ — **RESOLVED** in 2-CONTEXT.md: post-creation prompt with all templates unchecked. Room type is optional, detected from name. Custom rooms skip templates entirely.
|
|
||||||
|
|
||||||
## Session Continuity
|
## Session Continuity
|
||||||
|
|
||||||
Last session: 2026-03-16T14:13:32.148Z
|
Last session: 2026-03-16
|
||||||
Stopped at: Completed 04-03-PLAN.md (Phase 4 Verification Gate)
|
Stopped at: v1.0 milestone complete
|
||||||
Resume file: None
|
Resume file: None
|
||||||
|
|||||||
@@ -1,3 +1,12 @@
|
|||||||
|
# Requirements Archive: v1.0 MVP
|
||||||
|
|
||||||
|
**Archived:** 2026-03-16
|
||||||
|
**Status:** SHIPPED
|
||||||
|
|
||||||
|
For current requirements, see `.planning/REQUIREMENTS.md`.
|
||||||
|
|
||||||
|
---
|
||||||
|
|
||||||
# Requirements: HouseHoldKeaper
|
# Requirements: HouseHoldKeaper
|
||||||
|
|
||||||
**Defined:** 2026-03-15
|
**Defined:** 2026-03-15
|
||||||
100
.planning/milestones/v1.0-ROADMAP.md
Normal file
100
.planning/milestones/v1.0-ROADMAP.md
Normal file
@@ -0,0 +1,100 @@
|
|||||||
|
# Roadmap: HouseHoldKeaper
|
||||||
|
|
||||||
|
## Overview
|
||||||
|
|
||||||
|
Four phases build the app bottom-up along its natural dependency chain. Phase 1 lays the technical foundation every subsequent phase relies on. Phase 2 delivers complete room and task management — the core scheduling loop. Phase 3 surfaces that data as the daily plan view (the primary user experience) and adds the cleanliness indicator. Phase 4 adds notifications and completes the v1 feature set. After Phase 3, the app is usable daily. After Phase 4, it is releasable.
|
||||||
|
|
||||||
|
## Phases
|
||||||
|
|
||||||
|
**Phase Numbering:**
|
||||||
|
- Integer phases (1, 2, 3): Planned milestone work
|
||||||
|
- Decimal phases (2.1, 2.2): Urgent insertions (marked with INSERTED)
|
||||||
|
|
||||||
|
Decimal phases appear between their surrounding integers in numeric order.
|
||||||
|
|
||||||
|
- [x] **Phase 1: Foundation** - Project scaffold, database, state management, theme, and localization infrastructure (completed 2026-03-15)
|
||||||
|
- [x] **Phase 2: Rooms and Tasks** - Complete room CRUD, task CRUD with auto-scheduling, and bundled templates (completed 2026-03-15)
|
||||||
|
- [x] **Phase 3: Daily Plan and Cleanliness** - Primary daily plan screen with overdue/today/upcoming, cleanliness indicators per room (completed 2026-03-16)
|
||||||
|
- [x] **Phase 4: Notifications** - Daily summary notification with configurable time and Android permission handling (completed 2026-03-16)
|
||||||
|
|
||||||
|
## Phase Details
|
||||||
|
|
||||||
|
### Phase 1: Foundation
|
||||||
|
**Goal**: The app compiles, opens, and enforces correct architecture patterns — ready to receive features without accumulating technical debt
|
||||||
|
**Depends on**: Nothing (first phase)
|
||||||
|
**Requirements**: FOUND-01, FOUND-02, FOUND-03, FOUND-04, THEME-01, THEME-02
|
||||||
|
**Success Criteria** (what must be TRUE):
|
||||||
|
1. App launches on Android without errors and shows a bottom navigation bar with Home, Rooms, and Settings tabs
|
||||||
|
2. Light and dark themes work correctly and follow the system setting by default, using the calm Material 3 palette (muted greens, warm grays, gentle blues)
|
||||||
|
3. All UI strings are loaded from ARB localization files — no hardcoded German text in Dart code
|
||||||
|
4. The Drift database opens on first launch with schemaVersion 1 and the migration workflow is established (drift_dev make-migrations runs without errors)
|
||||||
|
5. riverpod_lint is active and flags ref.watch usage outside build() as an analysis error
|
||||||
|
**Plans**: 2 plans
|
||||||
|
Plans:
|
||||||
|
- [x] 01-01-PLAN.md — Scaffold Flutter project and build core infrastructure (database, providers, theme, localization)
|
||||||
|
- [x] 01-02-PLAN.md — Navigation shell, placeholder screens, Settings, and full app wiring
|
||||||
|
|
||||||
|
### Phase 2: Rooms and Tasks
|
||||||
|
**Goal**: Users can create and manage rooms and tasks, mark tasks done, and trust the app to schedule the next occurrence automatically
|
||||||
|
**Depends on**: Phase 1
|
||||||
|
**Requirements**: ROOM-01, ROOM-02, ROOM-03, ROOM-04, ROOM-05, TASK-01, TASK-02, TASK-03, TASK-04, TASK-05, TASK-06, TASK-07, TASK-08, TMPL-01, TMPL-02
|
||||||
|
**Success Criteria** (what must be TRUE):
|
||||||
|
1. User can create a room with a name and icon, edit it, reorder rooms via drag-and-drop, and delete it (with confirmation that removes all associated tasks)
|
||||||
|
2. User can create a task in a room with name, description, frequency interval (daily through yearly and custom), and effort level; tasks can be edited and deleted with confirmation
|
||||||
|
3. When creating a room, user can select from bundled German-language task templates for the chosen room type (all 14 room types covered) and they are added to the room as tasks
|
||||||
|
4. User can mark a task done (tap or swipe), which records the completion and sets the next due date correctly based on the interval
|
||||||
|
5. Overdue tasks are visually highlighted with a distinct color or badge on room cards and in task lists; tasks within a room are sorted by due date by default
|
||||||
|
6. Each room card shows its name, icon, count of due tasks, and cleanliness indicator
|
||||||
|
**Plans**: 5 plans
|
||||||
|
Plans:
|
||||||
|
- [x] 02-01-PLAN.md — Data layer: Drift tables, migration v1->v2, DAOs, scheduling utility, domain models, templates, tests
|
||||||
|
- [x] 02-02-PLAN.md — Room CRUD UI: 2-column card grid, room form, icon picker, drag-and-drop reorder, providers
|
||||||
|
- [x] 02-03-PLAN.md — Task CRUD UI: task list, task row with completion, task form, overdue highlighting, providers
|
||||||
|
- [x] 02-04-PLAN.md — Template selection: template picker bottom sheet, room type detection, integration with room creation
|
||||||
|
- [x] 02-05-PLAN.md — Visual and functional verification checkpoint
|
||||||
|
|
||||||
|
### Phase 3: Daily Plan and Cleanliness
|
||||||
|
**Goal**: Users can open the app and immediately see what needs doing today, act on tasks directly from the plan view, and see a room-level health indicator
|
||||||
|
**Depends on**: Phase 2
|
||||||
|
**Requirements**: PLAN-01, PLAN-02, PLAN-03, PLAN-04, PLAN-05, PLAN-06, CLEAN-01
|
||||||
|
**Success Criteria** (what must be TRUE):
|
||||||
|
1. The Home tab shows today's tasks grouped by room, with a separate highlighted section at the top for overdue tasks
|
||||||
|
2. User can mark a task done directly from the daily plan view via swipe or checkbox without navigating to the room
|
||||||
|
3. User can see upcoming tasks (tomorrow and this week) from the daily plan screen
|
||||||
|
4. A progress indicator shows completed vs total tasks for today (e.g., "5 von 12 erledigt")
|
||||||
|
5. When no tasks are due, an encouraging "all clear" empty state is shown instead of an empty list
|
||||||
|
6. Each room card displays a cleanliness indicator derived from the ratio of overdue tasks to total tasks in that room
|
||||||
|
**Plans**: 3 plans
|
||||||
|
Plans:
|
||||||
|
- [x] 03-01-PLAN.md — Data layer: DailyPlanDao with cross-room join query, providers, and localization keys
|
||||||
|
- [x] 03-02-PLAN.md — Daily plan UI: HomeScreen rewrite with progress card, task sections, animated completion, empty state
|
||||||
|
- [x] 03-03-PLAN.md — Visual and functional verification checkpoint
|
||||||
|
|
||||||
|
### Phase 4: Notifications
|
||||||
|
**Goal**: Users receive a daily summary notification reminding them of today's task count, and can control notification behavior from settings
|
||||||
|
**Depends on**: Phase 2
|
||||||
|
**Requirements**: NOTF-01, NOTF-02
|
||||||
|
**Success Criteria** (what must be TRUE):
|
||||||
|
1. User receives one daily notification showing the count of tasks due today, scheduled at a configurable time
|
||||||
|
2. User can enable or disable notifications from the Settings tab, and the change takes effect immediately
|
||||||
|
3. Notifications are correctly rescheduled after device reboot (RECEIVE_BOOT_COMPLETED receiver active)
|
||||||
|
4. On Android API 33+, the app requests POST_NOTIFICATIONS permission at the appropriate moment and degrades gracefully if denied
|
||||||
|
**Plans**: 3 plans
|
||||||
|
Plans:
|
||||||
|
- [ ] 04-01-PLAN.md — Infrastructure: packages, Android config, NotificationService, NotificationSettingsNotifier, DAO queries, timezone init, tests
|
||||||
|
- [ ] 04-02-PLAN.md — Settings UI: Benachrichtigungen section with toggle, time picker, permission flow, scheduling wiring, tests
|
||||||
|
- [ ] 04-03-PLAN.md — Verification gate: dart analyze + full test suite + requirement confirmation
|
||||||
|
|
||||||
|
## Progress
|
||||||
|
|
||||||
|
**Execution Order:**
|
||||||
|
Phases execute in numeric order: 1 -> 2 -> 3 -> 4
|
||||||
|
|
||||||
|
Note: Phase 4 depends on Phase 2 (needs scheduling data) but can be developed in parallel with Phase 3.
|
||||||
|
|
||||||
|
| Phase | Plans Complete | Status | Completed |
|
||||||
|
|-------|----------------|--------|-----------|
|
||||||
|
| 1. Foundation | 2/2 | Complete | 2026-03-15 |
|
||||||
|
| 2. Rooms and Tasks | 5/5 | Complete | 2026-03-15 |
|
||||||
|
| 3. Daily Plan and Cleanliness | 3/3 | Complete | 2026-03-16 |
|
||||||
|
| 4. Notifications | 3/3 | Complete | 2026-03-16 |
|
||||||