--- gsd_state_version: 1.0 milestone: v1.0 milestone_name: milestone status: executing stopped_at: Completed 03-01-PLAN.md last_updated: "2026-03-16T11:31:13Z" last_activity: 2026-03-16 — Completed 03-01-PLAN.md (daily plan data layer) progress: total_phases: 4 completed_phases: 2 total_plans: 10 completed_plans: 8 percent: 80 --- # Project State ## Project Reference See: .planning/PROJECT.md (updated 2026-03-15) **Core value:** Users can see what needs doing today, mark it done, and trust the app to schedule the next occurrence — without thinking about it. **Current focus:** Phase 3: Daily Plan and Cleanliness ## Current Position Phase: 3 of 4 (Daily Plan and Cleanliness) Plan: 1 of 3 in current phase -- COMPLETE Status: Executing Phase 3 -- Plan 01 complete, Plan 02 next Last activity: 2026-03-16 — Completed 03-01-PLAN.md (daily plan data layer) Progress: [████████--] 80% ## Performance Metrics **Velocity:** - Total plans completed: 8 - Average duration: 6.9 min - Total execution time: 0.9 hours **By Phase:** | Phase | Plans | Total | Avg/Plan | |-------|-------|-------|----------| | 1 - Foundation | 2 | 15 min | 7.5 min | | 2 - Rooms and Tasks | 5 | 35 min | 7.0 min | | 3 - Daily Plan and Cleanliness | 1 | 5 min | 5.0 min | **Recent Trend:** - Last 5 plans: 02-02 (11 min), 02-03 (12 min), 02-04 (3 min), 02-05 (1 min), 03-01 (5 min) - Trend: Data layer plan with TDD completed in 5 min *Updated after each plan completion* | Phase 02 P01 | 8 | 2 tasks | 16 files | | Phase 02 P02 | 11 | 2 tasks | 14 files | | Phase 02 P03 | 12 | 2 tasks | 8 files | | Phase 02 P04 | 3 | 2 tasks | 5 files | | Phase 02 P05 | 1 | 1 task | 0 files | | Phase 03 P01 | 5 | 2 tasks | 10 files | ## Accumulated Context ### Decisions Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work: - [Pre-phase]: Riverpod 3.3 requires Flutter 3.41+ — verify before scaffolding - [Pre-phase]: All due dates stored as date-only (calendar day), not DateTime — enforce from first migration - [Pre-phase]: German-only UI for MVP; localization infrastructure (ARB + AppLocalizations) required from Phase 1 even with one locale - [Pre-phase]: riverpod_lint must be active before any feature code — catches ref.watch outside build() at analysis time - [Pre-phase]: drift_dev make-migrations workflow must be established in Phase 1 — recovery cost is data loss - [01-01]: Pinned drift/drift_dev to 2.31.0 for analyzer ^9.0.0 compatibility with riverpod_generator 4.0.3 - [01-01]: Generated Riverpod 3 provider named themeProvider (not themeNotifierProvider) per new naming convention - [Phase 01-02]: Used themeProvider (Riverpod 3 naming) instead of themeNotifierProvider referenced in plan - [02-01]: Scheduling functions are top-level pure functions with DateTime today parameter for testability - [02-01]: Calendar-anchored intervals use anchorDay nullable field for month-clamping memory - [02-01]: RoomWithStats computed via asyncMap on watchAllRooms stream, not a custom SQL join - [02-01]: Templates stored as Dart const map for type safety, not JSON assets - [02-01]: detectRoomType uses contains-based matching with alias map - [Phase 02]: Scheduling functions are top-level pure functions with DateTime today parameter for testability - [Phase 02]: Calendar-anchored intervals use anchorDay nullable field for month-clamping memory - [Phase 02]: Templates stored as Dart const map for type safety, not JSON assets - [02-02]: ReorderableBuilder with typed onReorder callback for drag-and-drop grid - [02-02]: Long-press context menu (bottom sheet) for edit/delete on room cards - [02-02]: Provider override pattern in tests to decouple from database dependency - [02-03]: tasksInRoomProvider defined as manual StreamProvider.family due to riverpod_generator InvalidTypeException with drift Task type - [02-03]: Frequency selector uses ChoiceChip Wrap layout for 10 presets plus custom option - [02-03]: TaskRow uses ListTile with middle-dot separator between relative date and frequency label - [02-04]: Template picker uses StatefulWidget (not Consumer) receiving data via constructor - [02-04]: Room creation navigates to /rooms/$roomId (context.go) instead of context.pop to show new room - [02-04]: Calendar-anchored intervals set anchorDay to today's day-of-month; day-count intervals set null - [02-05]: Auto-approved verification checkpoint: dart analyze clean, 59/59 tests passing, all Phase 2 code integrated - [03-01]: DailyPlanDao uses innerJoin (not leftOuterJoin) since tasks always have a room - [03-01]: watchCompletionsToday uses customSelect with readsFrom for proper stream invalidation - [03-01]: dailyPlanProvider uses manual StreamProvider.autoDispose (not @riverpod) due to drift Task type issue - [03-01]: Progress total = remaining overdue + remaining today + completedTodayCount for stable denominator ### Pending Todos None yet. ### Blockers/Concerns - ~~[Research]: Recurrence policy edge cases not fully specified~~ — **RESOLVED** in 2-CONTEXT.md: calendar-anchored intervals clamp to last day with anchor memory, day-count intervals roll forward. Next due from original due date. Catch-up skips to next future date. - [Research]: Notification time configuration (user-adjustable vs hardcoded) not resolved. Decide before Phase 4 planning. - ~~[Research]: First-launch template seeding UX (silent vs prompted) not resolved~~ — **RESOLVED** in 2-CONTEXT.md: post-creation prompt with all templates unchecked. Room type is optional, detected from name. Custom rooms skip templates entirely. ## Session Continuity Last session: 2026-03-16T11:31:13Z Stopped at: Completed 03-01-PLAN.md Resume file: None