--- gsd_state_version: 1.0 milestone: v1.0 milestone_name: milestone status: executing stopped_at: Completed 02-01-PLAN.md last_updated: "2026-03-15T20:55:19.555Z" last_activity: 2026-03-15 — Completed 02-01-PLAN.md (data layer, DAOs, scheduling, templates) progress: total_phases: 4 completed_phases: 1 total_plans: 7 completed_plans: 3 percent: 43 --- # Project State ## Project Reference See: .planning/PROJECT.md (updated 2026-03-15) **Core value:** Users can see what needs doing today, mark it done, and trust the app to schedule the next occurrence — without thinking about it. **Current focus:** Phase 2: Rooms and Tasks ## Current Position Phase: 2 of 4 (Rooms and Tasks) Plan: 1 of 5 in current phase -- COMPLETE Status: Executing Phase 2 -- 02-01 complete, ready for 02-02 Last activity: 2026-03-15 — Completed 02-01-PLAN.md (data layer, DAOs, scheduling, templates) Progress: [████------] 43% ## Performance Metrics **Velocity:** - Total plans completed: 3 - Average duration: 7.7 min - Total execution time: 0.38 hours **By Phase:** | Phase | Plans | Total | Avg/Plan | |-------|-------|-------|----------| | 1 - Foundation | 2 | 15 min | 7.5 min | | 2 - Rooms and Tasks | 1 | 8 min | 8 min | **Recent Trend:** - Last 5 plans: 01-01 (7 min), 01-02 (8 min), 02-01 (8 min) - Trend: stable *Updated after each plan completion* | Phase 02 P01 | 8 | 2 tasks | 16 files | ## Accumulated Context ### Decisions Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work: - [Pre-phase]: Riverpod 3.3 requires Flutter 3.41+ — verify before scaffolding - [Pre-phase]: All due dates stored as date-only (calendar day), not DateTime — enforce from first migration - [Pre-phase]: German-only UI for MVP; localization infrastructure (ARB + AppLocalizations) required from Phase 1 even with one locale - [Pre-phase]: riverpod_lint must be active before any feature code — catches ref.watch outside build() at analysis time - [Pre-phase]: drift_dev make-migrations workflow must be established in Phase 1 — recovery cost is data loss - [01-01]: Pinned drift/drift_dev to 2.31.0 for analyzer ^9.0.0 compatibility with riverpod_generator 4.0.3 - [01-01]: Generated Riverpod 3 provider named themeProvider (not themeNotifierProvider) per new naming convention - [Phase 01-02]: Used themeProvider (Riverpod 3 naming) instead of themeNotifierProvider referenced in plan - [02-01]: Scheduling functions are top-level pure functions with DateTime today parameter for testability - [02-01]: Calendar-anchored intervals use anchorDay nullable field for month-clamping memory - [02-01]: RoomWithStats computed via asyncMap on watchAllRooms stream, not a custom SQL join - [02-01]: Templates stored as Dart const map for type safety, not JSON assets - [02-01]: detectRoomType uses contains-based matching with alias map - [Phase 02]: Scheduling functions are top-level pure functions with DateTime today parameter for testability - [Phase 02]: Calendar-anchored intervals use anchorDay nullable field for month-clamping memory - [Phase 02]: Templates stored as Dart const map for type safety, not JSON assets ### Pending Todos None yet. ### Blockers/Concerns - ~~[Research]: Recurrence policy edge cases not fully specified~~ — **RESOLVED** in 2-CONTEXT.md: calendar-anchored intervals clamp to last day with anchor memory, day-count intervals roll forward. Next due from original due date. Catch-up skips to next future date. - [Research]: Notification time configuration (user-adjustable vs hardcoded) not resolved. Decide before Phase 4 planning. - ~~[Research]: First-launch template seeding UX (silent vs prompted) not resolved~~ — **RESOLVED** in 2-CONTEXT.md: post-creation prompt with all templates unchecked. Room type is optional, detected from name. Custom rooms skip templates entirely. ## Session Continuity Last session: 2026-03-15T20:55:13.060Z Stopped at: Completed 02-01-PLAN.md Resume file: None