5.0 KiB
gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
| gsd_state_version | milestone | milestone_name | status | stopped_at | last_updated | last_activity | progress | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.0 | v1.0 | milestone | executing | Completed 02-04-PLAN.md | 2026-03-15T21:19:16Z | 2026-03-15 — Completed 02-04-PLAN.md (template selection flow into room creation) |
|
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-03-15)
Core value: Users can see what needs doing today, mark it done, and trust the app to schedule the next occurrence — without thinking about it. Current focus: Phase 2: Rooms and Tasks
Current Position
Phase: 2 of 4 (Rooms and Tasks) Plan: 4 of 5 in current phase -- COMPLETE Status: Executing Phase 2 -- 02-04 complete, ready for 02-05 Last activity: 2026-03-15 — Completed 02-04-PLAN.md (template selection flow into room creation)
Progress: [█████████░] 86%
Performance Metrics
Velocity:
- Total plans completed: 6
- Average duration: 8.0 min
- Total execution time: 0.8 hours
By Phase:
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| 1 - Foundation | 2 | 15 min | 7.5 min |
| 2 - Rooms and Tasks | 4 | 34 min | 8.5 min |
Recent Trend:
- Last 5 plans: 01-02 (8 min), 02-01 (8 min), 02-02 (11 min), 02-03 (12 min), 02-04 (3 min)
- Trend: template wiring plan was fast (clean integration, no new infrastructure)
Updated after each plan completion | Phase 02 P01 | 8 | 2 tasks | 16 files | | Phase 02 P02 | 11 | 2 tasks | 14 files | | Phase 02 P03 | 12 | 2 tasks | 8 files | | Phase 02 P04 | 3 | 2 tasks | 5 files |
Accumulated Context
Decisions
Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:
- [Pre-phase]: Riverpod 3.3 requires Flutter 3.41+ — verify before scaffolding
- [Pre-phase]: All due dates stored as date-only (calendar day), not DateTime — enforce from first migration
- [Pre-phase]: German-only UI for MVP; localization infrastructure (ARB + AppLocalizations) required from Phase 1 even with one locale
- [Pre-phase]: riverpod_lint must be active before any feature code — catches ref.watch outside build() at analysis time
- [Pre-phase]: drift_dev make-migrations workflow must be established in Phase 1 — recovery cost is data loss
- [01-01]: Pinned drift/drift_dev to 2.31.0 for analyzer ^9.0.0 compatibility with riverpod_generator 4.0.3
- [01-01]: Generated Riverpod 3 provider named themeProvider (not themeNotifierProvider) per new naming convention
- [Phase 01-02]: Used themeProvider (Riverpod 3 naming) instead of themeNotifierProvider referenced in plan
- [02-01]: Scheduling functions are top-level pure functions with DateTime today parameter for testability
- [02-01]: Calendar-anchored intervals use anchorDay nullable field for month-clamping memory
- [02-01]: RoomWithStats computed via asyncMap on watchAllRooms stream, not a custom SQL join
- [02-01]: Templates stored as Dart const map for type safety, not JSON assets
- [02-01]: detectRoomType uses contains-based matching with alias map
- [Phase 02]: Scheduling functions are top-level pure functions with DateTime today parameter for testability
- [Phase 02]: Calendar-anchored intervals use anchorDay nullable field for month-clamping memory
- [Phase 02]: Templates stored as Dart const map for type safety, not JSON assets
- [02-02]: ReorderableBuilder with typed onReorder callback for drag-and-drop grid
- [02-02]: Long-press context menu (bottom sheet) for edit/delete on room cards
- [02-02]: Provider override pattern in tests to decouple from database dependency
- [02-03]: tasksInRoomProvider defined as manual StreamProvider.family due to riverpod_generator InvalidTypeException with drift Task type
- [02-03]: Frequency selector uses ChoiceChip Wrap layout for 10 presets plus custom option
- [02-03]: TaskRow uses ListTile with middle-dot separator between relative date and frequency label
- [02-04]: Template picker uses StatefulWidget (not Consumer) receiving data via constructor
- [02-04]: Room creation navigates to /rooms/$roomId (context.go) instead of context.pop to show new room
- [02-04]: Calendar-anchored intervals set anchorDay to today's day-of-month; day-count intervals set null
Pending Todos
None yet.
Blockers/Concerns
[Research]: Recurrence policy edge cases not fully specified— RESOLVED in 2-CONTEXT.md: calendar-anchored intervals clamp to last day with anchor memory, day-count intervals roll forward. Next due from original due date. Catch-up skips to next future date.- [Research]: Notification time configuration (user-adjustable vs hardcoded) not resolved. Decide before Phase 4 planning.
[Research]: First-launch template seeding UX (silent vs prompted) not resolved— RESOLVED in 2-CONTEXT.md: post-creation prompt with all templates unchecked. Room type is optional, detected from name. Custom rooms skip templates entirely.
Session Continuity
Last session: 2026-03-15T21:19:16Z Stopped at: Completed 02-04-PLAN.md Resume file: None