Files
HouseHoldKeaper/.planning/STATE.md
Jean-Luc Makiola 8e7afd83e0 docs(03-03): complete Phase 3 verification gate plan
- Phase 3 verification gate passed: dart analyze clean, 72/72 tests
- All 7 requirements verified functional (PLAN-01-06, CLEAN-01)
- Updated STATE.md: Phase 3 complete, progress 100%
- Updated ROADMAP.md: Phase 3 marked complete with 3/3 plans

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-16 12:55:49 +01:00

6.2 KiB

gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
gsd_state_version milestone milestone_name status stopped_at last_updated last_activity progress
1.0 v1.0 milestone verifying Completed 03-03-PLAN.md 2026-03-16T11:55:24.995Z 2026-03-16 — Completed 03-03-PLAN.md (Phase 3 verification gate)
total_phases completed_phases total_plans completed_plans percent
4 3 10 10 100

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-03-15)

Core value: Users can see what needs doing today, mark it done, and trust the app to schedule the next occurrence — without thinking about it. Current focus: Phase 4: Notifications (Phase 3 complete)

Current Position

Phase: 3 of 4 (Daily Plan and Cleanliness) -- COMPLETE Plan: 3 of 3 in current phase -- COMPLETE Status: Phase 3 complete -- all requirements verified, ready for Phase 4 Last activity: 2026-03-16 — Completed 03-03-PLAN.md (Phase 3 verification gate)

Progress: [██████████] 100%

Performance Metrics

Velocity:

  • Total plans completed: 10
  • Average duration: 6.1 min
  • Total execution time: 1.0 hours

By Phase:

Phase Plans Total Avg/Plan
1 - Foundation 2 15 min 7.5 min
2 - Rooms and Tasks 5 35 min 7.0 min
3 - Daily Plan and Cleanliness 3 11 min 3.7 min

Recent Trend:

  • Last 5 plans: 02-04 (3 min), 02-05 (1 min), 03-01 (5 min), 03-02 (4 min), 03-03 (2 min)
  • Trend: Verification gates consistently fast (1-2 min)

Updated after each plan completion | Phase 02 P01 | 8 | 2 tasks | 16 files | | Phase 02 P02 | 11 | 2 tasks | 14 files | | Phase 02 P03 | 12 | 2 tasks | 8 files | | Phase 02 P04 | 3 | 2 tasks | 5 files | | Phase 02 P05 | 1 | 1 task | 0 files | | Phase 03 P01 | 5 | 2 tasks | 10 files | | Phase 03 P02 | 4 | 2 tasks | 5 files | | Phase 03 P03 | 2 | 2 tasks | 0 files |

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:

  • [Pre-phase]: Riverpod 3.3 requires Flutter 3.41+ — verify before scaffolding
  • [Pre-phase]: All due dates stored as date-only (calendar day), not DateTime — enforce from first migration
  • [Pre-phase]: German-only UI for MVP; localization infrastructure (ARB + AppLocalizations) required from Phase 1 even with one locale
  • [Pre-phase]: riverpod_lint must be active before any feature code — catches ref.watch outside build() at analysis time
  • [Pre-phase]: drift_dev make-migrations workflow must be established in Phase 1 — recovery cost is data loss
  • [01-01]: Pinned drift/drift_dev to 2.31.0 for analyzer ^9.0.0 compatibility with riverpod_generator 4.0.3
  • [01-01]: Generated Riverpod 3 provider named themeProvider (not themeNotifierProvider) per new naming convention
  • [Phase 01-02]: Used themeProvider (Riverpod 3 naming) instead of themeNotifierProvider referenced in plan
  • [02-01]: Scheduling functions are top-level pure functions with DateTime today parameter for testability
  • [02-01]: Calendar-anchored intervals use anchorDay nullable field for month-clamping memory
  • [02-01]: RoomWithStats computed via asyncMap on watchAllRooms stream, not a custom SQL join
  • [02-01]: Templates stored as Dart const map for type safety, not JSON assets
  • [02-01]: detectRoomType uses contains-based matching with alias map
  • [Phase 02]: Scheduling functions are top-level pure functions with DateTime today parameter for testability
  • [Phase 02]: Calendar-anchored intervals use anchorDay nullable field for month-clamping memory
  • [Phase 02]: Templates stored as Dart const map for type safety, not JSON assets
  • [02-02]: ReorderableBuilder with typed onReorder callback for drag-and-drop grid
  • [02-02]: Long-press context menu (bottom sheet) for edit/delete on room cards
  • [02-02]: Provider override pattern in tests to decouple from database dependency
  • [02-03]: tasksInRoomProvider defined as manual StreamProvider.family due to riverpod_generator InvalidTypeException with drift Task type
  • [02-03]: Frequency selector uses ChoiceChip Wrap layout for 10 presets plus custom option
  • [02-03]: TaskRow uses ListTile with middle-dot separator between relative date and frequency label
  • [02-04]: Template picker uses StatefulWidget (not Consumer) receiving data via constructor
  • [02-04]: Room creation navigates to /rooms/$roomId (context.go) instead of context.pop to show new room
  • [02-04]: Calendar-anchored intervals set anchorDay to today's day-of-month; day-count intervals set null
  • [02-05]: Auto-approved verification checkpoint: dart analyze clean, 59/59 tests passing, all Phase 2 code integrated
  • [03-01]: DailyPlanDao uses innerJoin (not leftOuterJoin) since tasks always have a room
  • [03-01]: watchCompletionsToday uses customSelect with readsFrom for proper stream invalidation
  • [03-01]: dailyPlanProvider uses manual StreamProvider.autoDispose (not @riverpod) due to drift Task type issue
  • [03-01]: Progress total = remaining overdue + remaining today + completedTodayCount for stable denominator
  • [03-02]: Used stream-driven completion with local _completingTaskIds Set for animation instead of AnimatedList
  • [03-02]: DailyPlanTaskRow is StatelessWidget (not ConsumerWidget) -- completion callback passed in from parent
  • [03-02]: No-tasks empty state uses dailyPlanNoTasks key for clearer daily plan context messaging
  • [03-03]: Phase 3 verification gate passed: dart analyze clean, 72/72 tests, all 7 requirements confirmed functional

Pending Todos

None yet.

Blockers/Concerns

  • [Research]: Recurrence policy edge cases not fully specifiedRESOLVED in 2-CONTEXT.md: calendar-anchored intervals clamp to last day with anchor memory, day-count intervals roll forward. Next due from original due date. Catch-up skips to next future date.
  • [Research]: Notification time configuration (user-adjustable vs hardcoded) not resolved. Decide before Phase 4 planning.
  • [Research]: First-launch template seeding UX (silent vs prompted) not resolvedRESOLVED in 2-CONTEXT.md: post-creation prompt with all templates unchecked. Room type is optional, detected from name. Custom rooms skip templates entirely.

Session Continuity

Last session: 2026-03-16T11:55:23.624Z Stopped at: Completed 03-03-PLAN.md Resume file: None