Define requirements (9 total: task delete, creation UX, cleanup), create roadmap (phases 8-10), and update PROJECT.md with new milestone goals. Room cover photos dropped from scope. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
3.7 KiB
3.7 KiB
Requirements: HouseHoldKeaper
Defined: 2026-03-18 Core Value: Users can see what needs doing today, mark it done, and trust the app to schedule the next occurrence — without thinking about it.
v1.2 Requirements
Requirements for milestone v1.2 Polish & Task Management. Each maps to roadmap phases.
Task Delete
- DEL-01: User can delete a task from the task edit form via a clearly visible delete action
- DEL-02: Deleting a task that has never been completed removes it from the database entirely (hard delete)
- DEL-03: Deleting a task that has been completed at least once deactivates it instead (soft delete) — task is hidden from all active views but preserved in the database for future statistics
- DEL-04: User sees a confirmation before deleting/deactivating a task
Task Creation UX
- TCX-01: Frequency picker presents an intuitive "Every [N] [unit]" interface instead of a flat grid of preset chips
- TCX-02: Common frequencies (daily, weekly, biweekly, monthly) are available as quick-select shortcuts without scrolling through all options
- TCX-03: User can set any arbitrary interval (e.g., every 5 days, every 3 weeks, every 2 months) without needing to select "Custom" first
- TCX-04: The frequency picker preserves all existing interval types and scheduling behavior (calendar-anchored monthly/quarterly/yearly with anchor memory)
Cleanup
- CLN-01: Dead code from v1.0 daily plan (daily_plan_providers.dart, daily_plan_task_row.dart, progress_card.dart) is removed without breaking notification service (DailyPlanDao must be preserved)
Future Requirements
Deferred to future release. Tracked but not in current roadmap.
Data
- DATA-01: User can export all data as JSON
- DATA-02: User can import data from JSON backup
Localization
- LOC-01: User can switch UI language to English
v2.0
- ONB-01: Onboarding wizard for first-time users
- ACC-01: User can pick a custom accent color for the app theme
- STAT-01: Statistics & insights dashboard showing task completion trends
Out of Scope
Explicitly excluded. Documented to prevent scope creep.
| Feature | Reason |
|---|---|
| Room cover photos from camera or gallery | Dropped — clean design system preferred |
| User accounts & cloud sync | Local-only by design |
| Leaderboards & points ranking | Not a gamification app |
| Subscription model / in-app purchases | Free forever |
| Family profile sharing across devices | Single-device app |
| Server-side infrastructure | Zero backend |
| AI-powered task suggestions | Overkill for curated templates |
| Per-task push notifications | Daily summary is more effective |
| Firebase or any Google cloud services | Contradicts local-first design |
| Real-time cross-device sync | Potential future self-hosted feature |
| Tablet-optimized layout | Future enhancement |
| Weekly/monthly calendar views | Date strip is sufficient for task app |
| Drag tasks between days | Tasks auto-schedule based on frequency |
| Calendar sync (Google/Apple) | Contradicts local-first, offline-only design |
Traceability
Which phases cover which requirements. Updated during roadmap creation.
| Requirement | Phase | Status |
|---|---|---|
| DEL-01 | Phase 8 | Planned |
| DEL-02 | Phase 8 | Planned |
| DEL-03 | Phase 8 | Planned |
| DEL-04 | Phase 8 | Planned |
| TCX-01 | Phase 9 | Planned |
| TCX-02 | Phase 9 | Planned |
| TCX-03 | Phase 9 | Planned |
| TCX-04 | Phase 9 | Planned |
| CLN-01 | Phase 10 | Planned |
Coverage:
- v1.2 requirements: 9 total
- Mapped to phases: 9
- Unmapped: 0
Requirements defined: 2026-03-18 Last updated: 2026-03-18 after roadmap creation (phases 8-10)