feat(ui): month card grid + week timeline, wire view switcher
Replace the throwaway debug screen with the first real calendar UI and a functional Month <-> Week switcher, on Material 3 Expressive. Month view (S1): - Material 3 Expressive card-per-day grid; only the current month's weeks render (neighbouring days left blank) - per-day event dots with "+N" overflow, today via primaryContainer - spring-based press feedback from the active motion scheme - swipe + drawer navigation, Loading/Failure/Success states Week view (S2): - vertical time schedule with overlap-resolved lanes (per-day clipping, midnight spanning, instant events) - all-day / multi-day events as connected horizontal spans - single scroll container (gutter + day columns stay aligned), columns bundled in a rounded container, noon-centred on load - top section colour-shifts with the app bar on scroll; swipe navigation, three states Shared / infra: - CalendarHost holds the active view; RootScreen renders it post-permission - ui/common building blocks: CalendarDrawer, CalendarFailure, ViewSwitcherPill, pastelize, observable locale, M3 Expressive slide transition (motionScheme fastSpatialSpec) - unit tests for the week layout (lanes, clipping, all-day spans) - build: compileSdk 37, material3 pinned to 1.5.0-alpha21 for Expressive Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
This commit is contained in:
@@ -41,6 +41,7 @@ androidx-ui-test-manifest = { group = "androidx.compose.ui", name = "ui-test-man
|
||||
|
||||
# Material 3 (Expressive lives in this artifact for 1.5+)
|
||||
androidx-material3 = { group = "androidx.compose.material3", name = "material3", version.ref = "material3" }
|
||||
androidx-compose-material-icons-core = { group = "androidx.compose.material", name = "material-icons-core" }
|
||||
|
||||
# Hilt
|
||||
hilt-android = { group = "com.google.dagger", name = "hilt-android", version.ref = "hilt" }
|
||||
|
||||
Reference in New Issue
Block a user