The date-picker half of M2 is dropped entirely; the "Today" half already shipped in v0.5. V1 is now feature-complete and only a polish/QA pass remains before v1.0. Updated the living planning docs (ROADMAP, STATE, REQUIREMENTS) and the design spec; corrected the v0.5.0 CHANGELOG note that promised M2 would return in v1.0. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
1.5 KiB
1.5 KiB
Calendula — Current State
Last updated: 2026-06-10
Status
Milestone: v0.5 — Calendar filter (M3) + Settings (M4) (complete) Phase: All V1 screens and cross-cutting wiring done. Jump-to-date (the date-picker half of M2) was cut from scope; V1 is feature-complete and only a polish/QA pass remains before v1.0
Progress
- Design spec written and committed (
docs/superpowers/specs/2026-06-08-calendar-app-design.md) - V1 design decisions resolved (App name "Calendula", icon, seed color)
- Plan 01 written and executed — foundation lands (theme, icon, i18n, Hilt, DataStore, CI green)
- Plan 02 written and executed — data layer + permission flow + debug screen
- Month view (S1) — 6-week grid, event dots, today marker, swipe nav, three states (replaces debug screen)
- Week view (S2) — time schedule with overlap-resolved lanes, all-day strip, swipe nav, three states
- Day view (S3) — single-column slice reusing the week layout
- View-switcher (M1) wired — cycles Month ↔ Week ↔ Day
- Event-detail screen (S4) — full-screen, humanized recurrence
- Filter sheet (M3) — per-calendar visibility, grouped by account, persisted, applied centrally in the repository
- Settings (M4) — appearance (theme, dynamic colour, week start), language (per-app locales), about
- [~] Jump-to-date (M2) — cut from scope; "Today" half shipped in v0.5, date-picker dropped
Next
- UI polish / QA pass across all views before v1.0
- F-Droid release of v1.0