Files
calendula/.planning/STATE.md
Jean-Luc Makiola 2cb8b59fb7 docs: cut jump-to-date (M2) from V1 scope
The date-picker half of M2 is dropped entirely; the "Today" half already
shipped in v0.5. V1 is now feature-complete and only a polish/QA pass
remains before v1.0.

Updated the living planning docs (ROADMAP, STATE, REQUIREMENTS) and the
design spec; corrected the v0.5.0 CHANGELOG note that promised M2 would
return in v1.0.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-10 23:27:21 +02:00

1.5 KiB

Calendula — Current State

Last updated: 2026-06-10

Status

Milestone: v0.5 — Calendar filter (M3) + Settings (M4) (complete) Phase: All V1 screens and cross-cutting wiring done. Jump-to-date (the date-picker half of M2) was cut from scope; V1 is feature-complete and only a polish/QA pass remains before v1.0

Progress

  • Design spec written and committed (docs/superpowers/specs/2026-06-08-calendar-app-design.md)
  • V1 design decisions resolved (App name "Calendula", icon, seed color)
  • Plan 01 written and executed — foundation lands (theme, icon, i18n, Hilt, DataStore, CI green)
  • Plan 02 written and executed — data layer + permission flow + debug screen
  • Month view (S1) — 6-week grid, event dots, today marker, swipe nav, three states (replaces debug screen)
  • Week view (S2) — time schedule with overlap-resolved lanes, all-day strip, swipe nav, three states
  • Day view (S3) — single-column slice reusing the week layout
  • View-switcher (M1) wired — cycles Month ↔ Week ↔ Day
  • Event-detail screen (S4) — full-screen, humanized recurrence
  • Filter sheet (M3) — per-calendar visibility, grouped by account, persisted, applied centrally in the repository
  • Settings (M4) — appearance (theme, dynamic colour, week start), language (per-app locales), about
  • [~] Jump-to-date (M2) — cut from scope; "Today" half shipped in v0.5, date-picker dropped

Next

  1. UI polish / QA pass across all views before v1.0
  2. F-Droid release of v1.0