Files
calendula/.planning
Jean-Luc Makiola 92ec718b28 docs(roadmap): sync state and promote attendee editing to Tier 5
Bring the planning docs up to date with reality from the changelog and
recent merges:
- Mark the .ics engine (export + import) shipped in v2.7.0 and local-
  calendar backup done; clear the stale "in progress" tags.
- Note snooze/dismiss merged into release/v2.8.0 alongside Codeberg
  crash reports.
- Record drag-and-drop rescheduling as consciously rejected.
- Promote attendee editing out of the gated bucket into Tier 5 #12
  (read side already shipped in v0.6; only the write side is missing),
  with the sync-adapter invitation caveat to resolve first.
- Refresh STATE.md (was stuck at v2.4) through v2.7.5 and the 2.8.0
  integration branch.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-22 23:00:45 +02:00
..