Files
calendula/app
Jean-Luc Makiola 94fa206e2e
All checks were successful
CI / ci (push) Successful in 11m40s
refactor(week): polish timeline — rounded viewport, scroll persistence, week badge
- Rounded, permanently-soft day-column scroll viewport via two viewports
  sharing one scroll state (gutter + columns stay aligned); plain
  rectangular column cards inside
- Vertical scroll position now persists across week swipes; noon-centring
  only runs on first entry into the week view (from month/day)
- All-day strip height is hoisted + animated, shared by both swipe pages,
  so it slides along and resizes smoothly instead of jumping
- Multi-line event time label so the end time isn't clipped in narrow
  columns; hour labels centred in the gutter
- Calendar-week (ISO) badge in the header gutter, aligned with the date
  numbers; dropped the redundant "All-day" gutter label
- Small breathing room between the top section and the timeline

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-10 20:05:40 +02:00
..