feat(filter,settings): calendar filter in drawer + settings (v0.5.0)
M3 — calendar filter: the navigation drawer now hosts the calendar list
inline (grouped by account, colour swatch + checkbox per calendar). Hidden
calendars are persisted app-side and filtered centrally in the repository,
so month/week/day re-filter live the moment a checkbox flips. Drawer trimmed
to Today, the calendar filter, and Settings, with leading icons and a clear
title/section type scale; the stubbed jump-to-date entry (M2) was removed.

M4 — settings: full-screen destination with appearance (theme System/Light/
Dark, Material You dynamic colour auto-disabled < API 31, week start Auto/Mon/
Sun), language (per-app locales via AppCompat, persisted to API 29), and an
about section (version, licence, source link). Theme is driven by one
activity-scoped settings source so changes apply app-wide at once. Week start
now drives the month grid and week view; Auto follows the locale.

Also:
- default view switched from month to week
- Settings screen handles system back (was closing the app)
- fix pre-existing NonObservableLocale/LocalContextConfigurationRead lint
  errors in EventDetailScreen so CI lint is green again
- versionName/versionCode bumped to 0.5.0 / 5

Tests: repository hidden-filter (incl. live re-emit), SettingsPrefs round-trip
+ week-start resolution, filter grouping. lint + unit tests + assembleDebug green.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-10 22:55:33 +02:00

1.5 KiB

Calendula — Current State

Last updated: 2026-06-10

Status

Milestone: v0.5 — Calendar filter (M3) + Settings (M4) (complete) Phase: All V1 screens and cross-cutting wiring done except jump-to-date (M2), which is deferred to the v1.0 polish pass

Progress

  • Design spec written and committed (docs/superpowers/specs/2026-06-08-calendar-app-design.md)
  • V1 design decisions resolved (App name "Calendula", icon, seed color)
  • Plan 01 written and executed — foundation lands (theme, icon, i18n, Hilt, DataStore, CI green)
  • Plan 02 written and executed — data layer + permission flow + debug screen
  • Month view (S1) — 6-week grid, event dots, today marker, swipe nav, three states (replaces debug screen)
  • Week view (S2) — time schedule with overlap-resolved lanes, all-day strip, swipe nav, three states
  • Day view (S3) — single-column slice reusing the week layout
  • View-switcher (M1) wired — cycles Month ↔ Week ↔ Day
  • Event-detail screen (S4) — full-screen, humanized recurrence
  • Filter sheet (M3) — per-calendar visibility, grouped by account, persisted, applied centrally in the repository
  • Settings (M4) — appearance (theme, dynamic colour, week start), language (per-app locales), about
  • Jump-to-date (M2) — drawer entry still stubbed (deferred to v1.0)

Next

  1. Jump-to-date (M2) — date picker from the drawer, reachable on every view
  2. UI polish / QA pass across all views before v1.0
  3. F-Droid release of v1.0