Publish two overdue posts (flip draft: false)
Both reached their pubDate but were still draft: true, so every daily
scheduled-deploy rebuild skipped them — the gate in src/utils/posts.ts
checks draft before pubDate, so the flag outranks the date indefinitely.
The Jul 6 flip (c321728) covered only the posts due that day; these two
were not yet due and were never revisited:
- caldav-colors (2026-07-08, 17 days overdue)
- the-feature-i-said-no-to (2026-07-10, 15 days overdue)
Verified with a production build: both render and appear in the blog
index, RSS feed, and sitemap.
Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
This commit is contained in:
@@ -6,7 +6,7 @@ description: >-
|
||||
how event colour flows through Android's calendar provider.
|
||||
pubDate: 2026-07-08
|
||||
tags: [android, calendula, caldav, accessibility]
|
||||
draft: true
|
||||
draft: false
|
||||
---
|
||||
|
||||
Two colour reports landed on Calendula in the same week, and both are still open.
|
||||
|
||||
@@ -6,7 +6,7 @@ description: >-
|
||||
the app is actually for.
|
||||
pubDate: 2026-07-10
|
||||
tags: [open-source, calendula, open-standards]
|
||||
draft: true
|
||||
draft: false
|
||||
---
|
||||
|
||||
One of the more useful things that has happened to Calendula wasn't a feature I
|
||||
|
||||
Reference in New Issue
Block a user