Publish two overdue posts (flip draft: false)

Both reached their pubDate but were still draft: true, so every daily
scheduled-deploy rebuild skipped them — the gate in src/utils/posts.ts
checks draft before pubDate, so the flag outranks the date indefinitely.
The Jul 6 flip (c321728) covered only the posts due that day; these two
were not yet due and were never revisited:

- caldav-colors            (2026-07-08, 17 days overdue)
- the-feature-i-said-no-to (2026-07-10, 15 days overdue)

Verified with a production build: both render and appear in the blog
index, RSS feed, and sitemap.

Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com>
This commit is contained in:
2026-07-25 09:57:45 +02:00
parent c321728b7f
commit 0a9ef90160
2 changed files with 2 additions and 2 deletions

View File

@@ -6,7 +6,7 @@ description: >-
how event colour flows through Android's calendar provider. how event colour flows through Android's calendar provider.
pubDate: 2026-07-08 pubDate: 2026-07-08
tags: [android, calendula, caldav, accessibility] tags: [android, calendula, caldav, accessibility]
draft: true draft: false
--- ---
Two colour reports landed on Calendula in the same week, and both are still open. Two colour reports landed on Calendula in the same week, and both are still open.

View File

@@ -6,7 +6,7 @@ description: >-
the app is actually for. the app is actually for.
pubDate: 2026-07-10 pubDate: 2026-07-10
tags: [open-source, calendula, open-standards] tags: [open-source, calendula, open-standards]
draft: true draft: false
--- ---
One of the more useful things that has happened to Calendula wasn't a feature I One of the more useful things that has happened to Calendula wasn't a feature I