1733fe8cfb
chore: archive v2.3 milestone files
...
Archive setup sharing, currency system, and i18n foundation milestone.
Reorganize ROADMAP.md with v2.3 details block, update PROJECT.md,
MILESTONES.md, STATE.md deferred items, and RETROSPECTIVE.md.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-04-19 17:05:21 +02:00
be5b318041
docs(phase-34): complete phase execution
2026-04-18 14:41:42 +02:00
f91417a24b
docs(34-02): complete extract hardcoded strings plan summary
...
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-04-18 14:02:41 +02:00
ceee6c0f13
docs(phase-34): complete i18n foundation phase execution
CI / ci (push) Failing after 11s
CI / e2e (push) Has been skipped
CI / deploy (push) Has been skipped
2026-04-13 18:24:22 +02:00
de82eefa74
docs(phase-33): complete phase execution
...
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com >
2026-04-13 18:10:47 +02:00
7a696f39a5
docs(33): create phase plans for currency system
...
6 plans across 3 waves covering market-aware pricing, exchange rates,
community price data, and currency-normalized display.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com >
2026-04-13 17:58:37 +02:00
81a654085d
docs(32): create phase plans for setup sharing system
...
4 plans in 3 waves:
- Wave 1: Schema migration (isPublic→visibility) + shares table
- Wave 2: Share link service + API routes
- Wave 3: Share modal UI + shared setup viewer
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com >
2026-04-13 17:05:36 +02:00
2853477a75
chore: archive v2.2 User Experience Polish milestone
...
CI / ci (push) Successful in 1m15s
CI / e2e (push) Has been skipped
CI / deploy (push) Has been skipped
Phases 28-31 archived to milestones/v2.2-phases/
Requirements and roadmap snapshots archived to milestones/
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com >
2026-04-13 16:00:35 +02:00
ba13fa8ded
docs: update roadmap, config, and UAT state
CI / ci (push) Failing after 20s
CI / deploy (push) Has been skipped
CI / e2e (push) Has been skipped
2026-04-13 13:56:56 +02:00
15c9f94d67
docs(phase-30): complete phase execution — onboarding redesign
...
CI / ci (push) Failing after 17s
CI / e2e (push) Has been skipped
CI / deploy (push) Has been skipped
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com >
2026-04-12 20:50:09 +02:00
b355c333e5
docs(phase-31): complete phase execution and verification
2026-04-12 20:19:10 +02:00
6c76dbbee3
docs(phase-29): complete phase execution
...
Phase 29 Image Presentation verified and marked complete.
14/14 must-haves passed. Next: Phase 30 Onboarding Redesign.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com >
2026-04-12 20:11:10 +02:00
40e7f94c52
docs(phase-28): complete phase execution
2026-04-12 17:51:49 +02:00
a3ccffd5f4
docs: ship v2.1, add v2.2 and v2.3 milestones to roadmap
2026-04-12 17:33:14 +02:00
2b27309b23
docs(27-03): complete root layout integration plan
...
- SUMMARY.md: TopNav/BottomTabBar wired, hero removed, /setups public route
- STATE.md: progress 100%, session recorded
- ROADMAP.md: phase 27 marked Complete (4/4 plans)
2026-04-10 23:48:43 +02:00
83b760a6d6
docs(27-01): complete TopNav and BottomTabBar plan
...
- SUMMARY.md: two components created, house icon deviation documented
- STATE.md: advanced to plan 4/4, progress 91%, decision recorded
- ROADMAP.md: phase 27 updated (3/4 summaries)
2026-04-10 23:45:56 +02:00
5984aabd40
docs(27-00): complete wave 0 E2E scaffolding plan
...
- Create 27-00-SUMMARY.md with test changes documentation
- Update STATE.md: advance plan to 3/4, add decisions, update session
- Update ROADMAP.md: reflect 2/4 summaries complete for phase 27
2026-04-10 23:45:01 +02:00
be3759b53a
docs(27-02): complete setups-elevation plan
2026-04-10 23:44:36 +02:00
2286e428a0
fix(27): revise plans based on checker feedback
2026-04-10 23:40:11 +02:00
0f3e85f7c4
docs(27): create phase plan
2026-04-10 23:32:19 +02:00
c5b4dacc1a
docs(27): add phase 27 to roadmap
2026-04-10 23:22:24 +02:00
fbf6fd449a
docs: remove backlog 999.3 — public access already shipped in phase 24
2026-04-10 23:14:21 +02:00
e367e152e0
docs: add backlog item 999.11 — marketing website (www vs app split)
2026-04-10 23:11:04 +02:00
24a2725e2c
docs: add backlog items 999.5–999.10 — legal pages, admin panel, feedback, analytics, mobile app, monetization
2026-04-10 23:10:40 +02:00
2a00b2d31f
docs: add backlog item 999.4 — top nav restructure and search bar rethink
CI / ci (push) Successful in 1m11s
CI / e2e (push) Has been skipped
CI / deploy (push) Successful in 7s
2026-04-10 17:21:51 +02:00
c892800969
docs(phase-26): complete phase execution
2026-04-10 15:08:18 +02:00
31a72c68f3
docs(26-03): complete discovery landing page plan
...
- 26-03-SUMMARY.md: landing page rewrite and PublicSetupCard enhancement
- STATE.md: advanced to phase complete, recorded decisions
- ROADMAP.md: phase 26 marked complete (3/3 plans)
- REQUIREMENTS.md: DISC-01 through DISC-05 marked complete
2026-04-10 15:03:00 +02:00
0b2e355bf8
docs(26-02): complete discovery routes and hooks plan
2026-04-10 14:59:58 +02:00
a00b90d97a
docs(26-01): complete discovery service plan
...
- SUMMARY.md: discovery service with cursor pagination
- STATE.md: advanced to plan 2, added decisions, updated progress to 71%
- ROADMAP.md: phase 26 in progress (1/3 plans)
- REQUIREMENTS.md: DISC-02, DISC-03, DISC-04, INFR-02 marked complete
2026-04-10 14:55:15 +02:00
9226dd3d90
docs(26): create phase plan
2026-04-10 14:45:38 +02:00
1789ee9093
docs(phase-25): complete phase execution
2026-04-10 11:13:18 +02:00
9dbf019466
docs(25-01): complete catalog enrichment data layer plan
...
- SUMMARY.md: attribution columns, upsert service, Zod schemas
- STATE.md: advance to plan 2, add decisions
- ROADMAP.md: update phase 25 progress
- REQUIREMENTS.md: mark CATL-01, CATL-02, CATL-05 complete
2026-04-10 10:59:58 +02:00
d9d9532399
docs(25): create phase plan for catalog enrichment and agent tools
2026-04-10 10:45:22 +02:00
a28ff90b35
docs(phase-24): complete phase execution
2026-04-10 10:17:40 +02:00
9177296223
docs(24-02): complete public access client layer plan
...
- SUMMARY.md created for 24-02 (auth prompt modal, render-first root, public setup viewing)
- STATE.md updated: plan advanced, progress 100%, decisions recorded
- ROADMAP.md updated: phase 24 complete (2/2 plans with SUMMARYs)
- REQUIREMENTS.md: PUBL-01 through PUBL-05 marked complete
2026-04-10 10:11:17 +02:00
50f9629707
docs(24-01): complete rate limiter factory and tiered public endpoint limits plan
...
- Add 24-01-SUMMARY.md with execution results
- Advance plan counter to 2/2
- Update progress to 50% (1 of 2 plans complete)
- Mark INFR-01 requirement complete
- Add factory pattern and tier decisions to STATE.md
2026-04-10 10:08:50 +02:00
08ff7d59bf
docs(24): create phase plan
2026-04-10 10:02:35 +02:00
9a69671718
docs: create milestone v2.1 roadmap (3 phases)
2026-04-09 14:53:25 +02:00
f564e8cb54
docs: archive v1.3 and v2.0 milestones with roadmap, requirements, and retrospective
CI / ci (push) Successful in 1m7s
CI / e2e (push) Has been skipped
CI / deploy (push) Successful in 7s
2026-04-08 23:10:50 +02:00
cc0bafe754
docs: mark phase 13 and v1.3 milestone as complete
2026-04-08 22:57:26 +02:00
9054938d88
docs: add backlog item 999.3 — public access auth model
2026-04-08 22:54:21 +02:00
8b8a8868d1
docs: add backlog item 999.2 — revamp onboarding flow
2026-04-08 22:53:23 +02:00
bd023acdd2
docs: add backlog item 999.1 — rewrite E2E tests for OIDC auth
2026-04-06 21:11:45 +02:00
6abf46d8c9
docs(phase-23): complete phase execution
2026-04-06 18:01:31 +02:00
724ae96011
docs(23-01): complete manual entry fallback plan
...
- ManualEntryForm component with CategoryPicker, ImageUpload, price-to-cents conversion
- CatalogSearchOverlay wired with Add Manually entry points, inline form, success card
- STATE.md updated with position, decisions, metrics
- ROADMAP.md phase 23 marked complete
- CATFLOW-07, CATFLOW-08 requirements marked complete
2026-04-06 17:57:58 +02:00
cca99778a4
docs(23): create phase plan for manual entry fallback
2026-04-06 17:34:14 +02:00
39e27cf516
docs(phase-22): complete phase execution
2026-04-06 16:16:21 +02:00
81a3e04306
docs(22-02): complete add-to-thread modal plan
...
- AddToThreadModal with thread picker and new thread creation
- CATFLOW-05 and CATFLOW-06 requirements completed
- Phase 22 catalog integration complete
2026-04-06 16:01:36 +02:00
e8b7907a22
docs(22-01): complete add-to-collection flow plan
...
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com >
2026-04-06 15:58:04 +02:00
2c1517032c
docs(22): create phase plan for add-from-catalog and thread integration
2026-04-06 15:38:27 +02:00