docs(phase-10): complete phase execution
Some checks failed
CI / ci (push) Has been cancelled
Build and Release to F-Droid / build-and-deploy (push) Has been cancelled
Build and Release to F-Droid / ci (push) Has been cancelled

This commit is contained in:
2026-03-19 08:29:15 +01:00
parent 35905af70c
commit 22a0f2f99b
3 changed files with 85 additions and 5 deletions

View File

@@ -72,7 +72,7 @@ Plans:
**Goal**: Remove orphaned v1.0 daily plan files that are no longer used after the calendar strip replacement, keeping the codebase clean
**Depends on**: Phase 8 (cleanup after feature work is done)
**Requirements**: CLN-01
**Plans:** 1 plan
**Plans:** 1/1 plans complete
Plans:
- [x] 10-01-PLAN.md — Delete 3 orphaned presentation files, remove DailyPlanState, verify zero regressions (completed 2026-03-19)
**Success Criteria** (what must be TRUE):
@@ -94,4 +94,4 @@ Plans:
| 7. Task Sorting | v1.1 | 2/2 | Complete | 2026-03-16 |
| 8. Task Delete | 2/2 | Complete | 2026-03-18 | - |
| 9. Task Creation UX | 1/1 | Complete | 2026-03-18 | - |
| 10. Dead Code Cleanup | v1.2 | 1/1 | Complete | 2026-03-19 |
| 10. Dead Code Cleanup | v1.2 | Complete | 2026-03-19 | 2026-03-19 |

View File

@@ -2,13 +2,13 @@
gsd_state_version: 1.0
milestone: v1.0
milestone_name: milestone
status: "Completed 10-dead-code-cleanup 10-01-PLAN.md"
status: completed
stopped_at: Completed 10-dead-code-cleanup 10-01-PLAN.md
last_updated: "2026-03-19T00:05:00Z"
last_updated: "2026-03-19T07:29:08.098Z"
last_activity: 2026-03-19 — Deleted orphaned v1.0 daily plan files and removed DailyPlanState
progress:
total_phases: 3
completed_phases: 2
completed_phases: 3
total_plans: 4
completed_plans: 4
percent: 100

View File

@@ -0,0 +1,80 @@
---
phase: 10-dead-code-cleanup
verified: 2026-03-19T00:00:00Z
status: passed
score: 7/7 must-haves verified
---
# Phase 10: Dead Code Cleanup Verification Report
**Phase Goal:** Remove orphaned v1.0 daily plan files that are no longer used after the calendar strip replacement, keeping the codebase clean
**Verified:** 2026-03-19
**Status:** PASSED
**Re-verification:** No — initial verification
## Goal Achievement
### Observable Truths
| # | Truth | Status | Evidence |
|----|--------------------------------------------------------------|------------|--------------------------------------------------------------------------|
| 1 | `daily_plan_providers.dart` no longer exists in the codebase | VERIFIED | `ls` returns "No such file or directory"; no references in lib/ |
| 2 | `daily_plan_task_row.dart` no longer exists in the codebase | VERIFIED | `ls` returns "No such file or directory"; no references in lib/ |
| 3 | `progress_card.dart` no longer exists in the codebase | VERIFIED | `ls` returns "No such file or directory"; no references in lib/ |
| 4 | `DailyPlanDao` is still registered in `database.dart` | VERIFIED | Line 51: `daos: [RoomsDao, TasksDao, DailyPlanDao, CalendarDao]` |
| 5 | `TaskWithRoom` class still exists and is importable | VERIFIED | Defined in `daily_plan_models.dart:4`; imported by 6+ calendar files |
| 6 | All 144 tests pass without failures | VERIFIED | `flutter test` output: `+144: All tests passed!` |
| 7 | `dart analyze` reports zero issues | VERIFIED | `Analyzing HouseHoldKeaper... No issues found!` |
**Score:** 7/7 truths verified
### Required Artifacts
| Artifact | Expected | Status | Details |
|-------------------------------------------------------|---------------------------------------|----------|---------------------------------------------------------------------------------------------|
| `lib/features/home/domain/daily_plan_models.dart` | TaskWithRoom class; DailyPlanState removed | VERIFIED | Contains `class TaskWithRoom` only; `DailyPlanState` grep returns no matches in entire lib/ |
| `lib/features/home/presentation/daily_plan_providers.dart` | DELETED | VERIFIED | File does not exist; confirmed by `ls` |
| `lib/features/home/presentation/daily_plan_task_row.dart` | DELETED | VERIFIED | File does not exist; confirmed by `ls` |
| `lib/features/home/presentation/progress_card.dart` | DELETED | VERIFIED | File does not exist; confirmed by `ls` |
### Key Link Verification
| From | To | Via | Status | Details |
|-------------------------------------------------------------------|-------------------------------------------------|--------------------------------------|----------|---------------------------------------------------------------------------|
| `lib/features/home/data/calendar_dao.dart` | `lib/features/home/domain/daily_plan_models.dart` | `import.*daily_plan_models` | VERIFIED | Line 4: `import '../domain/daily_plan_models.dart';` |
| `lib/features/home/presentation/calendar_providers.dart` | `lib/features/home/domain/daily_plan_models.dart` | `import.*daily_plan_models` | VERIFIED | Line 5: `import 'package:household_keeper/features/home/domain/daily_plan_models.dart';` |
| `lib/core/database/database.dart` | `lib/features/home/data/daily_plan_dao.dart` | `DailyPlanDao` in `@DriftDatabase` | VERIFIED | Line 51: `daos: [RoomsDao, TasksDao, DailyPlanDao, CalendarDao]` |
### Requirements Coverage
| Requirement | Source Plan | Description | Status | Evidence |
|-------------|-------------|-----------------------------------------------------------------------------------------------------------------|-----------|------------------------------------------------------------------------------------------------------|
| CLN-01 | 10-01-PLAN | Dead code from v1.0 daily plan (daily_plan_providers.dart, daily_plan_task_row.dart, progress_card.dart) is removed without breaking notification service (DailyPlanDao must be preserved) | SATISFIED | All three files deleted; DailyPlanDao still registered in database.dart; 144 tests pass; zero analyze issues |
No orphaned requirements detected. CLN-01 is the only requirement assigned to Phase 10 in REQUIREMENTS.md, and it is covered by plan 10-01.
### Anti-Patterns Found
None detected. No TODO/FIXME/placeholder comments or empty implementations found in modified files.
### Human Verification Required
None. All success criteria for this cleanup phase are programmatically verifiable: file deletion, class presence/absence, DAO registration, test pass count, and static analysis output.
### Gaps Summary
No gaps. All seven must-have truths are verified against the actual codebase:
- Three orphaned presentation files (`daily_plan_providers.dart`, `daily_plan_task_row.dart`, `progress_card.dart`) are fully deleted with no import references remaining anywhere in `lib/`.
- `DailyPlanState` class is absent from `daily_plan_models.dart`; `TaskWithRoom` is intact and actively used by 6+ calendar files.
- `DailyPlanDao` remains registered in the `@DriftDatabase` annotation on `database.dart` (line 51).
- Both task commits (`510529a`, `80e7011`) exist in git history.
- `dart analyze` reports zero issues.
- All 144 tests pass.
Phase goal is fully achieved.
---
_Verified: 2026-03-19_
_Verifier: Claude (gsd-verifier)_