docs(10-01): complete dead-code-cleanup plan
- Create 10-01-SUMMARY.md: deleted 3 orphaned v1.0 daily plan files, removed DailyPlanState - Update STATE.md: position, decisions, blocker resolved, session info - Update ROADMAP.md: Phase 10 complete, 10-01-PLAN.md checked off - Update REQUIREMENTS.md: CLN-01 marked complete
This commit is contained in:
98
.planning/phases/10-dead-code-cleanup/10-01-SUMMARY.md
Normal file
98
.planning/phases/10-dead-code-cleanup/10-01-SUMMARY.md
Normal file
@@ -0,0 +1,98 @@
|
||||
---
|
||||
phase: 10-dead-code-cleanup
|
||||
plan: 01
|
||||
subsystem: ui
|
||||
tags: [flutter, dead-code, cleanup, daily-plan, calendar]
|
||||
|
||||
# Dependency graph
|
||||
requires:
|
||||
- phase: 05-calendar-strip
|
||||
provides: "Calendar strip that superseded daily_plan_providers.dart, daily_plan_task_row.dart, progress_card.dart"
|
||||
provides:
|
||||
- "Three orphaned v1.0 daily plan presentation files removed from codebase"
|
||||
- "DailyPlanState class removed; TaskWithRoom class retained in daily_plan_models.dart"
|
||||
affects: []
|
||||
|
||||
# Tech tracking
|
||||
tech-stack:
|
||||
added: []
|
||||
patterns: []
|
||||
|
||||
key-files:
|
||||
created: []
|
||||
modified:
|
||||
- lib/features/home/domain/daily_plan_models.dart
|
||||
|
||||
key-decisions:
|
||||
- "DailyPlanDao kept in database.dart registration — still used by notification/settings service; only the presentation layer files were deleted"
|
||||
- "TaskWithRoom retained in daily_plan_models.dart — actively imported by calendar_dao.dart, calendar_providers.dart, and related calendar files"
|
||||
|
||||
patterns-established: []
|
||||
|
||||
requirements-completed: [CLN-01]
|
||||
|
||||
# Metrics
|
||||
duration: 5min
|
||||
completed: 2026-03-19
|
||||
---
|
||||
|
||||
# Phase 10 Plan 01: Dead Code Cleanup Summary
|
||||
|
||||
**Deleted three orphaned v1.0 daily plan presentation files and stripped DailyPlanState from domain models, leaving TaskWithRoom intact for the calendar system — zero test/analysis regressions across all 144 tests.**
|
||||
|
||||
## Performance
|
||||
|
||||
- **Duration:** ~5 min
|
||||
- **Started:** 2026-03-19T00:00:54Z
|
||||
- **Completed:** 2026-03-19T00:05:00Z
|
||||
- **Tasks:** 2
|
||||
- **Files modified:** 4 (3 deleted, 1 trimmed)
|
||||
|
||||
## Accomplishments
|
||||
|
||||
- Deleted `daily_plan_providers.dart`, `daily_plan_task_row.dart`, and `progress_card.dart` — all orphaned since Phase 5 replaced the daily plan UI with the calendar strip
|
||||
- Removed `DailyPlanState` class from `daily_plan_models.dart` (it was only referenced by the now-deleted providers file)
|
||||
- Preserved `TaskWithRoom` in `daily_plan_models.dart` — confirmed it remains importable by calendar system files
|
||||
- `dart analyze` reports zero issues; all 144 tests pass with no regressions
|
||||
|
||||
## Task Commits
|
||||
|
||||
Each task was committed atomically:
|
||||
|
||||
1. **Task 1: Delete orphaned files and remove DailyPlanState** - `510529a` (chore)
|
||||
2. **Task 2: Verify zero regressions** - verification only, no file changes
|
||||
|
||||
**Plan metadata:** (docs commit — see final commit)
|
||||
|
||||
## Files Created/Modified
|
||||
|
||||
- `lib/features/home/domain/daily_plan_models.dart` - Removed DailyPlanState class (lines 16-31); TaskWithRoom preserved
|
||||
- `lib/features/home/presentation/daily_plan_providers.dart` - DELETED (orphaned v1.0 file)
|
||||
- `lib/features/home/presentation/daily_plan_task_row.dart` - DELETED (orphaned v1.0 file)
|
||||
- `lib/features/home/presentation/progress_card.dart` - DELETED (orphaned v1.0 file)
|
||||
|
||||
## Decisions Made
|
||||
|
||||
- DailyPlanDao was NOT removed from `database.dart` — it is still registered in the `@DriftDatabase` annotation and used by `settings_screen.dart`. Only the presentation layer files were deleted.
|
||||
- TaskWithRoom was kept because it is imported by: `calendar_dao.dart`, `calendar_providers.dart`, `calendar_models.dart`, `calendar_day_list.dart`, `calendar_task_row.dart`, and `daily_plan_dao.dart`.
|
||||
|
||||
## Deviations from Plan
|
||||
|
||||
None - plan executed exactly as written.
|
||||
|
||||
## Issues Encountered
|
||||
|
||||
None.
|
||||
|
||||
## User Setup Required
|
||||
|
||||
None - no external service configuration required.
|
||||
|
||||
## Next Phase Readiness
|
||||
|
||||
- Phase 10 dead code cleanup complete
|
||||
- No blockers — dead code that was tracked as a blocker in STATE.md is now resolved
|
||||
|
||||
---
|
||||
*Phase: 10-dead-code-cleanup*
|
||||
*Completed: 2026-03-19*
|
||||
Reference in New Issue
Block a user