- Create 06-01-SUMMARY.md with full execution documentation - Update STATE.md: Phase 6 Plan 1 complete, decisions recorded - Update ROADMAP.md: Phase 6 marked complete (1/1 plans) - Mark HIST-01 and HIST-02 requirements complete
5.9 KiB
5.9 KiB
phase, plan, subsystem, tags, requires, provides, affects, tech-stack, key-files, key-decisions, patterns-established, requirements-completed, duration, completed
| phase | plan | subsystem | tags | requires | provides | affects | tech-stack | key-files | key-decisions | patterns-established | requirements-completed | duration | completed | |||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 06-task-history | 01 | database, ui |
|
|
|
|
|
|
|
|
|
5min | 2026-03-16 |
Phase 6 Plan 1: Task History Summary
Drift DAO stream for task completion history, bottom sheet with reverse-chronological German-formatted dates, wired from CalendarTaskRow tap through TaskFormScreen Verlauf button
Performance
- Duration: 5 min
- Started: 2026-03-16T20:52:49Z
- Completed: 2026-03-16T20:57:19Z
- Tasks: 2 (Task 1 TDD: RED + GREEN + localization; Task 2: sheet + wiring + navigation)
- Files modified: 9
Accomplishments
watchCompletionsForTask(int taskId)added to TasksDao: returnsStream<List<TaskCompletion>>sorted by completedAt DESC- Task history bottom sheet (
task_history_sheet.dart) with StreamBuilder, empty state, German date/time formatting via intl - Verlauf ListTile added to TaskFormScreen edit mode, opens history sheet on tap
- CalendarTaskRow gains
onTapthat navigates via GoRouter to the task edit form, making history one tap away from the calendar
Task Commits
Each task was committed atomically:
- RED - Failing DAO tests -
2687f5e(test) - Task 1: DAO method, localization -
ceae7d7(feat) - Task 2: History sheet, form wiring, navigation -
9f902ff(feat)
Plan metadata: (docs commit — see below)
Note: TDD tasks have separate RED (test) and GREEN (feat) commits
Files Created/Modified
lib/features/tasks/data/tasks_dao.dart- Added watchCompletionsForTask stream methodlib/features/tasks/data/tasks_dao.g.dart- Regenerated by build_runnerlib/features/tasks/presentation/task_history_sheet.dart- New: bottom sheet with StreamBuilder, empty state, completion listlib/features/tasks/presentation/task_form_screen.dart- Added Verlauf ListTile in edit modelib/features/home/presentation/calendar_task_row.dart- Added onTap navigation to task edit formlib/l10n/app_de.arb- Added taskHistoryTitle, taskHistoryEmpty, taskHistoryCount stringslib/l10n/app_localizations.dart- Regenerated (abstract class updated)lib/l10n/app_localizations_de.dart- Regenerated (German implementation updated)test/features/tasks/data/task_history_dao_test.dart- New: 5 tests covering empty state, single/multiple completions, task isolation, stream reactivity
Decisions Made
- No separate Riverpod provider for history sheet:
ref.read(appDatabaseProvider).tasksDao.watchCompletionsForTask(taskId)directly in the ConsumerWidget. One-shot modals do not need a dedicated provider. - CalendarTaskRow navigation uses
context.go('/rooms/.../tasks/...')consistent with existing GoRouter route patterns. - Removed unused
import 'package:drift/drift.dart'from test file (Rule 1 auto-fix during GREEN verification).
Deviations from Plan
Auto-fixed Issues
1. [Rule 1 - Bug] Removed unused import from test file
- Found during: Task 1 (GREEN phase, flutter analyze)
- Issue:
import 'package:drift/drift.dart'was copied from the existing tasks_dao_test.dart pattern but not needed in the new history test file (noValue()usage) - Fix: Removed the unused import line
- Files modified: test/features/tasks/data/task_history_dao_test.dart
- Verification: flutter analyze reports zero issues
- Committed in:
ceae7d7(Task 1 feat commit)
Total deviations: 1 auto-fixed (1 bug — unused import) Impact on plan: Trivial cleanup. No scope creep.
Issues Encountered
None — plan executed smoothly. All 106 tests pass (101 pre-existing + 5 new DAO tests), zero analyze issues.
User Setup Required
None - no external service configuration required.
Next Phase Readiness
- Phase 6 Plan 1 complete. Task history is fully functional.
- Phase 7 (task sorting) can proceed independently.
- No blockers.
Phase: 06-task-history Completed: 2026-03-16