gsd_state_version: 1.0
|
|
milestone: v1.0
|
|
milestone_name: milestone
|
|
status: completed
|
|
stopped_at: Completed 07-task-sorting/07-02-PLAN.md
|
|
last_updated: "2026-03-16T21:40:24.558Z"
|
|
last_activity: 2026-03-16 — Completed Phase 6 Plan 01 (task completion history)
|
|
progress:
|
|
total_phases: 3
|
|
completed_phases: 3
|
|
total_plans: 5
|
|
completed_plans: 5
|
|
percent: 100
|
|
---
|
|
|
|
# Project State
|
|
|
|
## Project Reference
|
|
|
|
See: .planning/PROJECT.md (updated 2026-03-16)
|
|
|
|
**Core value:** Users can see what needs doing today, mark it done, and trust the app to schedule the next occurrence — without thinking about it.
|
|
**Current focus:** v1.1 Calendar & Polish — Phase 6: Task History
|
|
|
|
## Current Position
|
|
|
|
Phase: 6 — Task History
|
|
Plan: 1/1 complete (Phase 6 done)
|
|
Status: Phase Complete
|
|
Last activity: 2026-03-16 — Completed Phase 6 Plan 01 (task completion history)
|
|
|
|
```
|
|
Progress: [██████████] 100% (1/1 plans in Phase 6)
|
|
```
|
|
|
|
## Performance Metrics
|
|
|
|
| Metric | v1.0 | v1.1 |
|
|
|--------|------|------|
|
|
| Phases | 4 | 3 planned |
|
|
| Plans | 13 | TBD |
|
|
| LOC (lib) | 7,773 | TBD |
|
|
| Tests | 89 | TBD |
|
|
| Phase 05-calendar-strip P01 | 5 | 2 tasks | 10 files |
|
|
| Phase 05-calendar-strip P02 | 8 | 3 tasks | 9 files |
|
|
| Phase 06-task-history P01 | 5 | 2 tasks | 9 files |
|
|
| Phase 07-task-sorting P01 | 4 | 2 tasks | 9 files |
|
|
| Phase 07-task-sorting P02 | 4 | 2 tasks | 5 files |
|
|
|
|
## Accumulated Context
|
|
|
|
### Decisions
|
|
|
|
| Decision | Rationale |
|
|
|----------|-----------|
|
|
| Calendar strip replaces daily plan home screen | v1.1 goal per PROJECT.md — not additive, the stacked overdue/today/upcoming sections are removed |
|
|
| Phase 5 before Phase 6 and 7 | Calendar strip is the primary UI surface; history and sorting operate within or alongside it |
|
|
| Phase 6 and 7 both depend on Phase 5 only | History and sorting are independent of each other — could execute in either order |
|
|
| HIST-01 and HIST-02 in same phase | Data layer (HIST-01) is only 1-2 DAO additions; grouping with the UI (HIST-02) keeps the phase coherent |
|
|
| Used NotifierProvider<SelectedDateNotifier> instead of deprecated StateProvider | Riverpod 3.x removed StateProvider; NotifierProvider is the correct replacement |
|
|
| calendarDayProvider fetches overdue tasks with .first in asyncMap when isToday | Consistent with dailyPlanProvider pattern; avoids combining two streams |
|
|
| watchTasksForDate sorts alphabetically by task name | Same-day tasks have no meaningful time-based order; alpha sort is deterministic and user-friendly |
|
|
| CalendarStripController as VoidCallback holder | Avoids GlobalKey for single imperative scroll-to-today action — simpler |
|
|
| Tests use pump()+pump(Duration) instead of pumpAndSettle() | CalendarStrip animation controllers cause pumpAndSettle timeout — fixed-duration pump steps are reliable |
|
|
| No separate Riverpod provider for history sheet | ref.read(appDatabaseProvider) directly in ConsumerWidget — one-shot modals do not need a dedicated provider |
|
|
| CalendarTaskRow onTap navigates to task edit form | Makes history accessible in one tap from home screen, consistent with GoRouter route patterns |
|
|
- [Phase 07-task-sorting]: Default sort is alphabetical — continuity with existing A-Z SQL sort in CalendarDayList
|
|
- [Phase 07-task-sorting]: overdueTasks are NOT sorted — pinned at top in existing order per design decision
|
|
- [Phase 07-task-sorting]: Sort preference stored as enum.name string in SharedPreferences (not intEnum) — enum reordering safe
|
|
- [Phase 07-task-sorting]: Used PopupMenuButton for SortDropdown in AppBar — menu overlay vs inline expansion, Material 3 pattern
|
|
- [Phase 07-task-sorting]: HomeScreen uses nested Scaffold for AppBar — standard StatefulShellRoute.indexedStack per-tab AppBar pattern
|
|
|
|
### Pending Todos
|
|
|
|
None.
|
|
|
|
### Blockers/Concerns
|
|
|
|
- Phase 5 complete. daily_plan_providers.dart, daily_plan_task_row.dart, and progress_card.dart are now dead code (safe to clean up in a future phase). DailyPlanDao must NOT be deleted — still used by the notification service.
|
|
|
|
## Session Continuity
|
|
|
|
Last session: 2026-03-16T21:40:24.556Z
|
|
Stopped at: Completed 07-task-sorting/07-02-PLAN.md
|
|
Resume file: None
|
|
Next action: Phase 7 (task sorting) or release
|