gsd_state_version milestone milestone_name status stopped_at last_updated last_activity progress
1.0 v1.0 milestone executing Completed 02-01-PLAN.md 2026-03-15T20:55:19.555Z 2026-03-15 — Completed 02-01-PLAN.md (data layer, DAOs, scheduling, templates)
total_phases completed_phases total_plans completed_plans percent
4 1 7 3 43

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-03-15)

Core value: Users can see what needs doing today, mark it done, and trust the app to schedule the next occurrence — without thinking about it. Current focus: Phase 2: Rooms and Tasks

Current Position

Phase: 2 of 4 (Rooms and Tasks) Plan: 1 of 5 in current phase -- COMPLETE Status: Executing Phase 2 -- 02-01 complete, ready for 02-02 Last activity: 2026-03-15 — Completed 02-01-PLAN.md (data layer, DAOs, scheduling, templates)

Progress: [████------] 43%

Performance Metrics

Velocity:

  • Total plans completed: 3
  • Average duration: 7.7 min
  • Total execution time: 0.38 hours

By Phase:

Phase Plans Total Avg/Plan
1 - Foundation 2 15 min 7.5 min
2 - Rooms and Tasks 1 8 min 8 min

Recent Trend:

  • Last 5 plans: 01-01 (7 min), 01-02 (8 min), 02-01 (8 min)
  • Trend: stable

Updated after each plan completion | Phase 02 P01 | 8 | 2 tasks | 16 files |

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:

  • [Pre-phase]: Riverpod 3.3 requires Flutter 3.41+ — verify before scaffolding
  • [Pre-phase]: All due dates stored as date-only (calendar day), not DateTime — enforce from first migration
  • [Pre-phase]: German-only UI for MVP; localization infrastructure (ARB + AppLocalizations) required from Phase 1 even with one locale
  • [Pre-phase]: riverpod_lint must be active before any feature code — catches ref.watch outside build() at analysis time
  • [Pre-phase]: drift_dev make-migrations workflow must be established in Phase 1 — recovery cost is data loss
  • [01-01]: Pinned drift/drift_dev to 2.31.0 for analyzer ^9.0.0 compatibility with riverpod_generator 4.0.3
  • [01-01]: Generated Riverpod 3 provider named themeProvider (not themeNotifierProvider) per new naming convention
  • [Phase 01-02]: Used themeProvider (Riverpod 3 naming) instead of themeNotifierProvider referenced in plan
  • [02-01]: Scheduling functions are top-level pure functions with DateTime today parameter for testability
  • [02-01]: Calendar-anchored intervals use anchorDay nullable field for month-clamping memory
  • [02-01]: RoomWithStats computed via asyncMap on watchAllRooms stream, not a custom SQL join
  • [02-01]: Templates stored as Dart const map for type safety, not JSON assets
  • [02-01]: detectRoomType uses contains-based matching with alias map
  • [Phase 02]: Scheduling functions are top-level pure functions with DateTime today parameter for testability
  • [Phase 02]: Calendar-anchored intervals use anchorDay nullable field for month-clamping memory
  • [Phase 02]: Templates stored as Dart const map for type safety, not JSON assets

Pending Todos

None yet.

Blockers/Concerns

  • [Research]: Recurrence policy edge cases not fully specifiedRESOLVED in 2-CONTEXT.md: calendar-anchored intervals clamp to last day with anchor memory, day-count intervals roll forward. Next due from original due date. Catch-up skips to next future date.
  • [Research]: Notification time configuration (user-adjustable vs hardcoded) not resolved. Decide before Phase 4 planning.
  • [Research]: First-launch template seeding UX (silent vs prompted) not resolvedRESOLVED in 2-CONTEXT.md: post-creation prompt with all templates unchecked. Room type is optional, detected from name. Custom rooms skip templates entirely.

Session Continuity

Last session: 2026-03-15T20:55:13.060Z Stopped at: Completed 02-01-PLAN.md Resume file: None