Project Retrospective

A living document updated after each milestone. Lessons feed forward into future planning.

Milestone: v1.0 — MVP

Shipped: 2026-03-16 Phases: 4 | Plans: 13

What Was Built

  • Complete room-based household chore app with auto-scheduling task management
  • Daily plan home screen with overdue/today/tomorrow sections and progress tracking
  • Bundled German task templates for 14 room types
  • Daily summary notifications with configurable time and Android permission handling
  • 89 tests covering DAOs, scheduling logic, providers, and widget behavior

What Worked

  • Bottom-up phase structure (foundation -> data -> UI -> polish) kept each phase clean with minimal rework
  • TDD approach for providers and services caught several issues early (async race conditions, API mismatches)
  • Verification gates at the end of Phase 2, 3, and 4 confirmed all requirements before moving on
  • Calendar-anchored scheduling with anchor memory was designed right the first time — no rework needed
  • ARB localization from Phase 1 meant adding German strings was frictionless throughout

What Was Inefficient

  • riverpod_generator InvalidTypeException with drift Task type required workaround (manual StreamProvider) in 3 separate plans — should have been caught in Phase 1 research
  • Some plan specifications referenced outdated API patterns (flutter_local_notifications positional parameters removed in v20+) — research needs to verify exact current API signatures
  • Phase 4 plan checkboxes in ROADMAP.md weren't updated to [x] by executor — minor bookkeeping gap

Patterns Established

  • @Riverpod(keepAlive: true) AsyncNotifier with SharedPreferences for persistent settings (ThemeNotifier, NotificationSettingsNotifier)
  • Manual StreamProvider.family/autoDispose for drift type compatibility
  • DailyPlanDao innerJoin pattern for cross-table queries
  • ConsumerStatefulWidget for screens with async callbacks requiring mounted guards
  • Provider override pattern in widget tests for database isolation

Key Lessons

  1. Research phase should verify exact current package API signatures — breaking changes between major versions cause plan deviations
  2. Drift + riverpod_generator type incompatibility is a known issue — plan for manual providers from the start when using drift
  3. Verification gates add minimal time (~2 min) but catch integration issues — keep them for all phases
  4. Progressive disclosure (AnimatedSize) is a clean pattern for conditional settings UI

Cost Observations

  • Model mix: orchestrator on opus, researchers/planners/executors/checkers on sonnet
  • Total execution: ~1.3 hours for 13 plans across 4 phases
  • Notable: Verification gates averaged 2 min — very efficient for the confidence they provide

Process Evolution

Milestone Phases Plans Key Change
v1.0 4 13 Initial project — established all patterns

Cumulative Quality

Milestone Tests Key Metric
v1.0 89 dart analyze clean, 0 issues

Top Lessons (Verified Across Milestones)

  1. (Single milestone — lessons above will be cross-validated as more milestones ship)