docs: cut jump-to-date (M2) from V1 scope
The date-picker half of M2 is dropped entirely; the "Today" half already shipped in v0.5. V1 is now feature-complete and only a polish/QA pass remains before v1.0. Updated the living planning docs (ROADMAP, STATE, REQUIREMENTS) and the design spec; corrected the v0.5.0 CHANGELOG note that promised M2 would return in v1.0. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
This commit is contained in:
@@ -16,7 +16,8 @@ and this project adheres to [Semantic Versioning](https://semver.org/spec/v2.0.0
|
||||
separate from the system VISIBLE flag) and applied centrally in the
|
||||
repository, so month/week/day re-filter live the moment a switch flips.
|
||||
The drawer was trimmed to just Today, the calendar filter, and Settings
|
||||
(the stubbed jump-to-date entry was removed; M2 returns in v1.0)
|
||||
(the stubbed jump-to-date entry was removed; jump-to-date was later cut
|
||||
from scope entirely)
|
||||
- Settings (M4): a full-screen destination with
|
||||
- **Appearance** — theme (System / Light / Dark), Material You dynamic colour
|
||||
(auto-disabled below Android 12), week start (Automatic / Monday / Sunday)
|
||||
|
||||
Reference in New Issue
Block a user