Compare commits

...
Author SHA1 Message Date
makiolaj d1e9acad20 fix(calendar): re-query after own writes and on return to foreground (#364)
Some providers don't notify the observer, which left every view stale
until a restart. Also filters soft-deleted rows out of the instances
query and stops dropping change ticks.
2026-10-06 17:40:14 +02:00
renovate-bot 4342c6ab6d fix(deps): update composebom to v2026.09.00 (#238)
Release — F-Droid repo + Gitea/Codeberg release + Play / detect (push) Successful in 6s
Release — F-Droid repo + Gitea/Codeberg release + Play / release (push) Skipped
Release — F-Droid repo + Gitea/Codeberg release + Play / play (push) Skipped
Renovate / renovate (push) Successful in 1m6s
This PR contains the following updates:

| Package | Type | Change | Age | [Confidence](https://docs.renovatebot.com/merge-confidence/) |
|---|---|---|---|---|
| [androidx.compose:compose-bom](https://developer.android.com/jetpack) | dependencies | `2026.06.01` → `2026.09.00` | 25 d | ![confidence](https://developer.mend.io/api/mc/badges/confidence/maven/androidx.compose:compose-bom/2026.06.01/2026.09.00?slim=true) |

---

### Configuration

📅 **Schedule**: (UTC)

- Branch creation
  - Between 04:00 AM and 06:59 AM, only on Monday (`* 4-6 * * 1`)
- Automerge
  - At any time (no schedule defined)

🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied.

♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 **Ignore**: Close this PR and you won't be reminded about this update again.

---

 - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box

---

This PR has been generated by [Mend Renovate](https://github.com/renovatebot/renovate).
<!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiI0My4yMzIuMCIsInVwZGF0ZWRJblZlciI6IjQzLjIzMi4wIiwidGFyZ2V0QnJhbmNoIjoibWFpbiIsImxhYmVscyI6WyJkZXBlbmRlbmNpZXMiXX0=-->

Reviewed-on: https://codeberg.org/jlmakiola/calendula/pulls/238
2026-10-05 13:40:00 +02:00
renovate-bot 57bad5c74c fix(deps): update material3 (alpha) to v1.5.0-alpha29 (#274)
Release — F-Droid repo + Gitea/Codeberg release + Play / detect (push) Successful in 7s
Release — F-Droid repo + Gitea/Codeberg release + Play / release (push) Skipped
Release — F-Droid repo + Gitea/Codeberg release + Play / play (push) Skipped
Renovate / renovate (push) Canceled after 0s
This PR contains the following updates:

| Package | Type | Change | Age | [Confidence](https://docs.renovatebot.com/merge-confidence/) |
|---|---|---|---|---|
| [androidx.compose.material3:material3](https://developer.android.com/jetpack/androidx/releases/compose-material3#1.4.0) ([source](https://cs.android.com/androidx/platform/frameworks/support)) | dependencies | `1.5.0-alpha26` → `1.5.0-alpha29` | 11 d | ![confidence](https://developer.mend.io/api/mc/badges/confidence/maven/androidx.compose.material3:material3/1.5.0-alpha26/1.5.0-alpha29?slim=true) |

---

### Configuration

📅 **Schedule**: (UTC)

- Branch creation
  - Between 04:00 AM and 06:59 AM, only on Monday (`* 4-6 * * 1`)
- Automerge
  - At any time (no schedule defined)

🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied.

♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 **Ignore**: Close this PR and you won't be reminded about this update again.

---

 - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box

---

This PR has been generated by [Mend Renovate](https://github.com/renovatebot/renovate).
<!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiI0My4yMzIuMCIsInVwZGF0ZWRJblZlciI6IjQzLjIzMi4wIiwidGFyZ2V0QnJhbmNoIjoibWFpbiIsImxhYmVscyI6WyJkZXBlbmRlbmNpZXMiXX0=-->

Reviewed-on: https://codeberg.org/jlmakiola/calendula/pulls/274
2026-10-05 13:39:41 +02:00
renovate-bot ebf833d0bd fix(deps): update glance to v1.2.0 (#275)
Release — F-Droid repo + Gitea/Codeberg release + Play / detect (push) Successful in 6s
Release — F-Droid repo + Gitea/Codeberg release + Play / release (push) Skipped
Release — F-Droid repo + Gitea/Codeberg release + Play / play (push) Skipped
Renovate / renovate (push) Successful in 1m10s
This PR contains the following updates:

| Package | Type | Change | Age | [Confidence](https://docs.renovatebot.com/merge-confidence/) |
|---|---|---|---|---|
| [androidx.glance:glance-material3](https://developer.android.com/jetpack/androidx/releases/glance#1.2.0) ([source](https://cs.android.com/androidx/platform/frameworks/support)) | dependencies | `1.1.1` → `1.2.0` | 39 d | ![confidence](https://developer.mend.io/api/mc/badges/confidence/maven/androidx.glance:glance-material3/1.1.1/1.2.0?slim=true) |
| [androidx.glance:glance-appwidget](https://developer.android.com/jetpack/androidx/releases/glance#1.2.0) ([source](https://cs.android.com/androidx/platform/frameworks/support)) | dependencies | `1.1.1` → `1.2.0` | 39 d | ![confidence](https://developer.mend.io/api/mc/badges/confidence/maven/androidx.glance:glance-appwidget/1.1.1/1.2.0?slim=true) |

---

### Configuration

📅 **Schedule**: (UTC)

- Branch creation
  - Between 04:00 AM and 06:59 AM, only on Monday (`* 4-6 * * 1`)
- Automerge
  - At any time (no schedule defined)

🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied.

♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 **Ignore**: Close this PR and you won't be reminded about these updates again.

---

 - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box

---

This PR has been generated by [Mend Renovate](https://github.com/renovatebot/renovate).
<!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiI0My4yMzIuMCIsInVwZGF0ZWRJblZlciI6IjQzLjIzMi4wIiwidGFyZ2V0QnJhbmNoIjoibWFpbiIsImxhYmVscyI6WyJkZXBlbmRlbmNpZXMiXX0=-->

Reviewed-on: https://codeberg.org/jlmakiola/calendula/pulls/275
2026-10-05 13:39:03 +02:00
renovate-bot 2f24a9878c fix(deps): update lifecyclecompose to v2.11.0 (#277)
Release — F-Droid repo + Gitea/Codeberg release + Play / detect (push) Successful in 8s
Release — F-Droid repo + Gitea/Codeberg release + Play / release (push) Skipped
Release — F-Droid repo + Gitea/Codeberg release + Play / play (push) Skipped
Renovate / renovate (push) Successful in 1m5s
This PR contains the following updates:

| Package | Type | Change | Age | [Confidence](https://docs.renovatebot.com/merge-confidence/) |
|---|---|---|---|---|
| [androidx.lifecycle:lifecycle-runtime-compose](https://developer.android.com/jetpack/androidx/releases/lifecycle#2.11.0) ([source](https://cs.android.com/androidx/platform/frameworks/support)) | dependencies | `2.10.0` → `2.11.0` | 109 d | ![confidence](https://developer.mend.io/api/mc/badges/confidence/maven/androidx.lifecycle:lifecycle-runtime-compose/2.10.0/2.11.0?slim=true) |

---

### Configuration

📅 **Schedule**: (UTC)

- Branch creation
  - Between 04:00 AM and 06:59 AM, only on Monday (`* 4-6 * * 1`)
- Automerge
  - At any time (no schedule defined)

🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied.

♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 **Ignore**: Close this PR and you won't be reminded about this update again.

---

 - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box

---

This PR has been generated by [Mend Renovate](https://github.com/renovatebot/renovate).
<!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiI0My4yMzIuMCIsInVwZGF0ZWRJblZlciI6IjQzLjIzMi4wIiwidGFyZ2V0QnJhbmNoIjoibWFpbiIsImxhYmVscyI6WyJkZXBlbmRlbmNpZXMiXX0=-->

Reviewed-on: https://codeberg.org/jlmakiola/calendula/pulls/277
2026-10-05 13:37:03 +02:00
Jean-Luc Makiolaandmakiolaj 2313671965 chore(renovate): rebase conflicted PRs on every merge to main (#366)
Release — F-Droid repo + Gitea/Codeberg release + Play / detect (push) Successful in 30s
Release — F-Droid repo + Gitea/Codeberg release + Play / release (push) Skipped
Release — F-Droid repo + Gitea/Codeberg release + Play / play (push) Skipped
Renovate / renovate (push) Successful in 1m29s
Renovate only rebases while it runs, and it ran once a week, so merging one dependency PR left the others conflicted until the next Monday.

- `renovate.yml`: also run on push to `main` (mirror syncs fire push events, like `release.yaml`).
- `renovate.json5`: new PRs only in a Monday window (`* 4-6 * * 1`) around the weekly cron; on-merge runs only rebase conflicted PRs (`rebaseWhen: "conflicted"`).

Co-authored-by: Jean-Luc Makiola <business@jeanlucmakiola.de>
Reviewed-on: https://codeberg.org/jlmakiola/calendula/pulls/366
2026-10-05 13:33:59 +02:00
Jean-Luc Makiola e1b80d9f89 Release v2.22.3 (#362)
Release — F-Droid repo + Gitea/Codeberg release + Play / detect (push) Successful in 8s
Release — F-Droid repo + Gitea/Codeberg release + Play / release (push) Successful in 14m42s
Release — F-Droid repo + Gitea/Codeberg release + Play / play (push) Successful in 1m40s
Patch release for #361. No app changes.

- `title.txt` in every store locale is now "Calendula: Calendar", with "Calendar" taken from the app's own translation of the word (`event_detail_calendar`). Since 2.22.0 the Play listing is pushed from the repo, and the repo title was only "Calendula", which replaced the suffixed name from the Play Console.
- ja has no translation for that string yet, so it uses カレンダー. zh-CN has "Calendula" as its translation of "Calendar" on Weblate, so the title uses 日历 instead. That string should be fixed on Weblate.
- F-Droid reads the same `title.txt`, so the F-Droid listing gets the suffix too.

Plus the release commit: CHANGELOG section, versionName 2.22.3 / versionCode 22203, and the 22203 changelogs for every store locale. Merging this to main triggers the release pipeline.

Closes #361
2026-10-02 22:14:34 +02:00
45 changed files with 162 additions and 49 deletions
+11 -2
View File
@@ -1,8 +1,17 @@
name: Renovate
on:
# Weekly sweep. Mondays 05:00 UTC — this cron owns the cadence; the repo's
# renovate.json5 deliberately has no internal schedule (avoids double-gating).
# Every merge to main. Mirror syncs from Codeberg fire push events here (the
# same trigger release.yaml relies on), so a merged Renovate PR is followed
# within minutes by a run that rebases the sibling PRs it just conflicted —
# most bumps touch gradle/libs.versions.toml. Outside renovate.json5's
# `schedule` window such a run only maintains existing branches
# (updateNotScheduled), it never opens new PRs. Renovate's own rebases push
# to renovate/* branches, not main, so this cannot loop.
push:
branches: [main]
# Weekly sweep for new updates. Mondays 05:00 UTC, inside the schedule window
# in renovate.json5 — keep the two in step.
schedule:
- cron: '0 5 * * 1'
# Manual run for an on-demand sweep from the Actions tab.
+6
View File
@@ -7,6 +7,11 @@ and this project adheres to [Semantic Versioning](https://semver.org/spec/v2.0.0
## [Unreleased]
## [2.22.3] — 2026-10-02
### Fixed
- **The store listing is called "Calendula: Calendar" again,** with "Calendar" in each store language. Since 2.22.0 the Play listing comes from the repository, whose title was only "Calendula". The app is unchanged ([#361]).
## [2.22.2] — 2026-10-02
### Fixed
@@ -1829,3 +1834,4 @@ automatically, with zero telemetry and no internet permission.
[#336]: https://codeberg.org/jlmakiola/calendula/issues/336
[#357]: https://codeberg.org/jlmakiola/calendula/issues/357
[#359]: https://codeberg.org/jlmakiola/calendula/issues/359
[#361]: https://codeberg.org/jlmakiola/calendula/issues/361
+2 -2
View File
@@ -28,8 +28,8 @@ android {
// which builds this version and then creates the matching vX.Y.Z tag +
// release itself (versionCode is pinned to MAJOR*10000 + MINOR*100 +
// PATCH from versionName, e.g. 2.7.2 -> 20702). See docs/RELEASING.md.
versionCode = 22202
versionName = "2.22.2"
versionCode = 22203
versionName = "2.22.3"
testInstrumentationRunner = "androidx.test.runner.AndroidJUnitRunner"
}
@@ -26,6 +26,7 @@ import androidx.core.net.toUri
import androidx.hilt.navigation.compose.hiltViewModel
import androidx.lifecycle.compose.collectAsStateWithLifecycle
import dagger.hilt.android.AndroidEntryPoint
import de.jeanlucmakiola.calendula.data.calendar.CalendarRepository
import de.jeanlucmakiola.calendula.data.prefs.ThemeMode
import de.jeanlucmakiola.calendula.data.prefs.is24Hour
import de.jeanlucmakiola.calendula.domain.EventForm
@@ -56,6 +57,7 @@ import kotlinx.datetime.TimeZone
import kotlinx.datetime.toLocalDateTime
import kotlin.time.Clock
import kotlin.time.Instant
import javax.inject.Inject
/** A prefilled create form from an external launch, with the source it came from. */
private data class InsertRequest(val form: EventForm, val source: ImportSource)
@@ -63,6 +65,8 @@ private data class InsertRequest(val form: EventForm, val source: ImportSource)
@AndroidEntryPoint
class MainActivity : AppCompatActivity() {
@Inject lateinit var calendarRepository: CalendarRepository
// Which of light/dark the system bars are drawn for. The styles installed
// in onCreate read this field live, so androidx's config-change replay
// picks up the in-app override instead of the night resource qualifier.
@@ -245,6 +249,12 @@ class MainActivity : AppCompatActivity() {
)
}
override fun onStart() {
super.onStart()
// Changes made while we were away may never have notified us (#364).
calendarRepository.refresh()
}
override fun onResume() {
super.onResume()
// Reaching a running UI means startup succeeded; reset the loop trail.
@@ -610,8 +610,11 @@ class AndroidCalendarDataSource @Inject constructor(
// cancelled exception for the one instance (#47). A NULL status is a
// normal, un-cancelled event, so it must survive the filter — a bare
// `!= CANCELED` would drop it (NULL != 2 is NULL, not true).
"${CalendarContract.Instances.STATUS} IS NULL OR " +
"${CalendarContract.Instances.STATUS} != ${CalendarContract.Events.STATUS_CANCELED}",
// DELETED = 0: a provider that soft-deletes may keep the row's
// instances until a purge (#364).
"(${CalendarContract.Instances.STATUS} IS NULL OR " +
"${CalendarContract.Instances.STATUS} != ${CalendarContract.Events.STATUS_CANCELED}) AND " +
"${CalendarContract.Events.DELETED} = 0",
null,
CalendarContract.Instances.BEGIN + " ASC",
)?.use { c -> c.mapAllNotNull { CursorColumnReader(c).toEventInstance() } } ?: emptyList()
@@ -15,6 +15,9 @@ import kotlin.time.Instant
interface CalendarRepository {
fun calendars(): Flow<List<CalendarSource>>
fun instances(range: ClosedRange<Instant>): Flow<List<EventInstance>>
/** Re-query every open [calendars] / [instances] flow. */
fun refresh()
suspend fun eventDetail(eventId: Long): EventDetail
/**
@@ -14,6 +14,7 @@ import de.jeanlucmakiola.calendula.domain.SearchCandidate
import de.jeanlucmakiola.calendula.domain.ics.IcsImportSummary
import de.jeanlucmakiola.calendula.domain.ics.ParsedIcsEvent
import kotlinx.coroutines.CoroutineDispatcher
import kotlinx.coroutines.channels.BufferOverflow
import kotlinx.coroutines.flow.Flow
import kotlinx.coroutines.flow.MutableSharedFlow
import kotlinx.coroutines.flow.combine
@@ -51,21 +52,37 @@ class CalendarRepositoryImpl @Inject constructor(
private suspend fun allDayReminderTimeMinutes(): Int =
settingsPrefs.allDayReminderTimeMinutes.first()
// DROP_OLDEST: tryEmit never fails, so a tick that lands while a subscriber
// still holds the previous one is never lost (#364).
private val ticks = MutableSharedFlow<Unit>(
replay = 0,
extraBufferCapacity = 1,
onBufferOverflow = BufferOverflow.DROP_OLDEST,
)
/**
* Bumped on every provider notification, so one tick's calendar read can be
* Bumped on every [refresh], so one tick's calendar read can be
* shared by everything that needs it (see [calendarsSnapshot]).
*/
private val generation = AtomicLong(0L)
init {
dataSource.registerChangeListener {
generation.incrementAndGet()
ticks.tryEmit(Unit)
dataSource.registerChangeListener(::refresh)
}
// Writes re-query on their own too: some providers never notify the
// observer, which left every view stale until a restart (#364).
override fun refresh() {
generation.incrementAndGet()
ticks.tryEmit(Unit)
}
/** Run a provider write on [io], then re-query whether or not it threw. */
private suspend fun <T> write(block: suspend () -> T): T = withContext(io) {
try {
block()
} finally {
refresh()
}
}
@@ -181,7 +198,7 @@ class CalendarRepositoryImpl @Inject constructor(
displayName: String,
color: Int,
description: String?,
): Long = withContext(io) {
): Long = write {
dataSource.createLocalCalendar(displayName, color, description)
}
@@ -190,13 +207,13 @@ class CalendarRepositoryImpl @Inject constructor(
displayName: String,
color: Int,
description: String?,
) = withContext(io) { dataSource.updateCalendar(id, displayName, color, description) }
) = write { dataSource.updateCalendar(id, displayName, color, description) }
override suspend fun deleteCalendar(id: Long) =
withContext(io) { dataSource.deleteCalendar(id) }
write { dataSource.deleteCalendar(id) }
override suspend fun setCalendarsVisible(ids: Collection<Long>, visible: Boolean) =
withContext(io) {
write {
if (dataSource.canWriteCalendars()) {
ids.forEach { dataSource.setCalendarVisible(it, visible) }
// Nothing of ours is left waiting for the provider once the
@@ -217,7 +234,7 @@ class CalendarRepositoryImpl @Inject constructor(
override suspend fun importEvents(
targetCalendarId: Long,
events: List<ParsedIcsEvent>,
): IcsImportSummary = withContext(io) {
): IcsImportSummary = write {
val existing = dataSource.existingUids(targetCalendarId)
// Both are per-calendar, not per-event: looking them up once keeps a
// thousand-event restore to two extra queries. The palette is the
@@ -268,7 +285,7 @@ class CalendarRepositoryImpl @Inject constructor(
)
}
override suspend fun createEvent(form: EventForm): Long = withContext(io) {
override suspend fun createEvent(form: EventForm): Long = write {
dataSource.insertEvent(form, allDayReminderTimeMinutes())
}
@@ -276,11 +293,11 @@ class CalendarRepositoryImpl @Inject constructor(
eventId: Long,
original: EventForm,
updated: EventForm,
) = withContext(io) {
) = write {
dataSource.updateEvent(eventId, original, updated, allDayReminderTimeMinutes())
}
override suspend fun deleteEvent(eventId: Long) = withContext(io) {
override suspend fun deleteEvent(eventId: Long) = write {
dataSource.deleteEvent(eventId)
}
@@ -289,7 +306,7 @@ class CalendarRepositoryImpl @Inject constructor(
targetCalendarId: Long,
original: EventForm,
updated: EventForm,
): Long = withContext(io) {
): Long = write {
dataSource.moveEvent(
eventId, targetCalendarId, original, updated, allDayReminderTimeMinutes(),
)
@@ -300,7 +317,7 @@ class CalendarRepositoryImpl @Inject constructor(
beginMillis: Long,
original: EventForm,
form: EventForm,
): Long = withContext(io) {
): Long = write {
dataSource.updateOccurrence(
eventId, beginMillis, original, form, allDayReminderTimeMinutes(),
)
@@ -311,20 +328,20 @@ class CalendarRepositoryImpl @Inject constructor(
beginMillis: Long,
original: EventForm,
updated: EventForm,
): Long = withContext(io) {
): Long = write {
dataSource.updateEventFromOccurrence(
eventId, beginMillis, original, updated, allDayReminderTimeMinutes(),
)
}
override suspend fun deleteOccurrence(eventId: Long, beginMillis: Long) = withContext(io) {
override suspend fun deleteOccurrence(eventId: Long, beginMillis: Long) = write {
dataSource.deleteOccurrence(eventId, beginMillis)
}
override suspend fun deleteEventFromOccurrence(
eventId: Long,
beginMillis: Long,
) = withContext(io) {
) = write {
dataSource.deleteEventFromOccurrence(eventId, beginMillis)
}
@@ -95,6 +95,45 @@ class CalendarRepositoryImplTest {
}
}
@Test
fun `instances re-emit after a write the provider never notified about`(@TempDir tempDir: Path) = runTest {
var current = listOf(makeEvent(10L))
val fake = FakeCalendarDataSource().apply { instancesResult = { _, _ -> current } }
val repo = CalendarRepositoryImpl(fake, newPrefs(tempDir), newSettings(tempDir), UnconfinedTestDispatcher(testScheduler))
val range = Instant.fromEpochMilliseconds(0)..Instant.fromEpochMilliseconds(10_000L)
repo.instances(range).test {
assertThat(awaitItem().map { it.eventId }).containsExactly(10L)
current = emptyList()
repo.deleteEvent(10L)
assertThat(awaitItem()).isEmpty()
cancelAndIgnoreRemainingEvents()
}
}
@Test
fun `instances re-emit after a write that failed`(@TempDir tempDir: Path) = runTest {
var current = listOf(makeEvent(10L))
val fake = FakeCalendarDataSource().apply {
instancesResult = { _, _ -> current }
writeError = WriteFailedException("boom")
}
val repo = CalendarRepositoryImpl(fake, newPrefs(tempDir), newSettings(tempDir), UnconfinedTestDispatcher(testScheduler))
val range = Instant.fromEpochMilliseconds(0)..Instant.fromEpochMilliseconds(10_000L)
repo.instances(range).test {
awaitItem()
current = emptyList()
assertThrows<WriteFailedException> { repo.deleteOccurrence(10L, 1_000L) }
assertThat(awaitItem()).isEmpty()
cancelAndIgnoreRemainingEvents()
}
}
@Test
fun `instances forwards epoch-millis bounds to data source`(@TempDir tempDir: Path) = runTest {
var observedBegin: Long? = null
+4 -2
View File
@@ -12,8 +12,10 @@ the package list (recurring writes, save conflicts, reminder delivery).
straight back to it. Sync is DAVx5's / Google's / the system's job.
2. **Observer-driven UI.** A `ContentObserver` on the provider triggers
re-queries; every screen recomposes from fresh provider state. After a
write, nothing is patched by hand — the provider notifies, the views
refresh. This also covers external changes (sync) for free.
write, nothing is patched by hand — the views refresh from the provider.
This also covers external changes (sync) for free. Some providers don't
reliably notify (#364), so the repository also re-queries after each of
its own writes, and `MainActivity` does on every return to the foreground.
3. **JVM-first testing.** Everything between the UI and the
`ContentResolver` is shaped so it runs as a plain JUnit 5 test: pure
domain logic, cursor-free mappers, a `FakeCalendarDataSource` for
@@ -0,0 +1 @@
عاد اسم صفحة المتجر إلى "Calendula: التقويم". لم يتغير شيء في التطبيق.
+1 -1
View File
@@ -1 +1 @@
Calendula
Calendula: التقويم
@@ -0,0 +1 @@
Старонка ў краме зноў называецца «Calendula: Каляндар». Праграма не змянілася.
+1 -1
View File
@@ -1 +1 @@
Calendula
Calendula: Каляндар
@@ -0,0 +1 @@
Stránka v obchodě se opět jmenuje „Calendula: Kalendář“. Aplikace se nezměnila.
+1 -1
View File
@@ -1 +1 @@
Calendula
Calendula: Kalendář
@@ -0,0 +1 @@
Der Store-Eintrag heißt wieder „Calendula: Kalender“. An der App hat sich nichts geändert.
+1 -1
View File
@@ -1 +1 @@
Calendula
Calendula: Kalender
@@ -0,0 +1 @@
The store listing is called "Calendula: Calendar" again. Nothing in the app changed.
+1 -1
View File
@@ -1 +1 @@
Calendula
Calendula: Calendar
@@ -0,0 +1 @@
La ficha de la tienda vuelve a llamarse «Calendula: Calendario». La app no cambia.
+1 -1
View File
@@ -1 +1 @@
Calendula
Calendula: Calendario
@@ -0,0 +1 @@
La fiche du store s'appelle de nouveau « Calendula: Calendrier ». L'app ne change pas.
+1 -1
View File
@@ -1 +1 @@
Calendula
Calendula: Calendrier
@@ -0,0 +1 @@
Az áruházi oldal neve ismét „Calendula: Naptár”. Az alkalmazás nem változott.
+1 -1
View File
@@ -1 +1 @@
Calendula
Calendula: Naptár
@@ -0,0 +1 @@
La scheda dello store si chiama di nuovo «Calendula: Calendario». L'app non cambia.
+1 -1
View File
@@ -1 +1 @@
Calendula
Calendula: Calendario
@@ -0,0 +1 @@
ストアの掲載名が再び「Calendula: カレンダー」になりました。アプリ自体に変更はありません。
+1 -1
View File
@@ -1 +1 @@
Calendula
Calendula: カレンダー
@@ -0,0 +1 @@
De winkelvermelding heet weer "Calendula: Agenda". Aan de app is niets veranderd.
+1 -1
View File
@@ -1 +1 @@
Calendula
Calendula: Agenda
@@ -0,0 +1 @@
Strona w sklepie znów nazywa się „Calendula: Kalendarz”. Aplikacja się nie zmieniła.
+1 -1
View File
@@ -1 +1 @@
Calendula
Calendula: Kalendarz
@@ -0,0 +1 @@
A página da loja voltou a se chamar "Calendula: Calendário". O app não mudou.
+1 -1
View File
@@ -1 +1 @@
Calendula
Calendula: Calendário
@@ -0,0 +1 @@
A página da loja volta a chamar-se "Calendula: Calendário". A app não mudou.
+1 -1
View File
@@ -1 +1 @@
Calendula
Calendula: Calendário
@@ -0,0 +1 @@
Страница в магазине снова называется «Calendula: Календарь». Приложение не изменилось.
+1 -1
View File
@@ -1 +1 @@
Calendula
Calendula: Календарь
@@ -0,0 +1 @@
Stránka v obchode sa opäť volá „Calendula: Kalendár“. Aplikácia sa nezmenila.
+1 -1
View File
@@ -1 +1 @@
Calendula
Calendula: Kalendár
@@ -0,0 +1 @@
商店页面名称恢复为“Calendula: 日历”。应用本身没有变化。
+1 -1
View File
@@ -1 +1 @@
Calendula
Calendula: 日历
+4 -4
View File
@@ -7,11 +7,11 @@ coreKtx = "1.19.0"
appcompat = "1.7.1"
lifecycleRuntime = "2.11.0"
activityCompose = "1.13.0"
composeBom = "2026.06.01"
composeBom = "2026.09.00"
# Material 3 Expressive APIs currently live only in the 1.5 alpha line.
# Pin explicitly to override the BOM (which ships stable 1.4.0).
# Re-evaluate when 1.5.0 stable lands.
material3 = "1.5.0-alpha26"
material3 = "1.5.0-alpha29"
datastore = "1.2.1"
junit = "6.1.3"
junitPlatform = "6.1.3"
@@ -22,10 +22,10 @@ kotlinxDatetime = "0.7.0"
kotlinxCoroutines = "1.11.0"
turbine = "1.2.1"
hiltNavigationCompose = "1.4.0"
lifecycleCompose = "2.10.0"
lifecycleCompose = "2.11.0"
androidxTestRules = "1.7.0"
# Glance: 1.1.1 is the latest stable (1.2.0 is still rc, 1.3.0 alpha).
glance = "1.1.1"
glance = "1.2.0"
work = "2.11.2"
documentfile = "1.1.0"
+10 -3
View File
@@ -52,9 +52,16 @@
prConcurrentLimit: 5,
prHourlyLimit: 0,
// Cadence is owned by the Gitea Actions cron (.gitea/workflows/renovate.yml,
// Mondays) — no internal `schedule` here, so the two don't double-gate and
// silently skip a run.
// New branches/PRs only in the Monday window (UTC), which brackets the weekly
// cron in .gitea/workflows/renovate.yml with slack for a late start — keep
// the two in step, or the sweep lands outside the window and finds nothing.
// The same workflow also runs on every push to main; those runs fall outside
// the window and, via the default updateNotScheduled: true, only maintain
// existing branches — chiefly rebasing PRs a merge just conflicted.
schedule: ["* 4-6 * * 1"],
// Rebase only on conflict, not every time main moves (automerge is off, so
// this matches "auto"; spelled out because the on-merge trigger relies on it).
rebaseWhen: "conflicted",
// Gitea Actions workflows live under .gitea/workflows, not .github — extend
// the github-actions manager (same syntax) to watch them too.