Files
calendula/.planning/ROADMAP.md
Jean-Luc Makiola 2cb8b59fb7 docs: cut jump-to-date (M2) from V1 scope
The date-picker half of M2 is dropped entirely; the "Today" half already
shipped in v0.5. V1 is now feature-complete and only a polish/QA pass
remains before v1.0.

Updated the living planning docs (ROADMAP, STATE, REQUIREMENTS) and the
design spec; corrected the v0.5.0 CHANGELOG note that promised M2 would
return in v1.0.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-10 23:27:21 +02:00

1.3 KiB

Calendula — Roadmap

v0.x — Pre-Release

Version Milestone Status
v0.1 Foundation & CI complete
v0.2 Data Layer & Permission Flow complete
v0.3 Month + Week + Day views, view switcher complete
v0.4 Event Detail (S4) + humanized recurrence complete
v0.5 Calendar filter (M3) + Settings (M4) complete
v1.0 Polish pass, F-Droid release pending

Delivery ran ahead of the original table: Day view (S3) shipped in v0.3 and Event Detail (S4) in v0.4, so the Filter/Settings milestone became v0.5.

Jump-to-date (the date-picker half of M2) was cut from scope and will not ship. The "Today" half of M2 already shipped in v0.5 (drawer entry). V1 is therefore feature-complete; only a polish/QA pass remains.

v1.0 — First Public Release

All V1 features shipped, polished, on F-Droid. Read-only calendar. Remaining before v1.0: a UI polish/QA pass.

v2.0 — Write Support

  • Event create / edit / delete via CalendarContract writes
  • Quick-add sheet
  • Conflict UX (event modified externally during edit)

v3.0 — Power-User Features

  • Home-screen widget
  • Full-text search
  • Tablet / foldable layouts
  • Optional: ICS file import (drag-and-drop)

Order is indicative — community feedback after V1 may re-prioritize.