docs: cut jump-to-date (M2) from V1 scope
The date-picker half of M2 is dropped entirely; the "Today" half already shipped in v0.5. V1 is now feature-complete and only a polish/QA pass remains before v1.0. Updated the living planning docs (ROADMAP, STATE, REQUIREMENTS) and the design spec; corrected the v0.5.0 CHANGELOG note that promised M2 would return in v1.0. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
This commit is contained in:
@@ -17,7 +17,7 @@ See full design spec: `docs/superpowers/specs/2026-06-08-calendar-app-design.md`
|
||||
- [ ] Day view (S3)
|
||||
- [ ] Event Detail Sheet (S4)
|
||||
- [ ] Multi-Calendar Filter (M3)
|
||||
- [ ] Today button + Jump-to-Date (M2)
|
||||
- [x] Today button (M2) — shipped v0.5; Jump-to-Date **cut from scope**
|
||||
- [ ] View-Switcher (M1)
|
||||
- [ ] Settings screen (M4)
|
||||
- [ ] Empty / no-permission / no-calendars states
|
||||
|
||||
@@ -9,16 +9,19 @@
|
||||
| v0.3 | Month + Week + Day views, view switcher | complete |
|
||||
| v0.4 | Event Detail (S4) + humanized recurrence | complete |
|
||||
| v0.5 | Calendar filter (M3) + Settings (M4) | complete |
|
||||
| v1.0 | Polish + jump-to-date (M2), F-Droid release | pending |
|
||||
| v1.0 | Polish pass, F-Droid release | pending |
|
||||
|
||||
Delivery ran ahead of the original table: Day view (S3) shipped in v0.3 and
|
||||
Event Detail (S4) in v0.4, so the Filter/Settings milestone became v0.5.
|
||||
Jump-to-date (M2) was deferred out of v0.5 and folds into the v1.0 polish pass.
|
||||
|
||||
Jump-to-date (the date-picker half of M2) was **cut from scope** and will not
|
||||
ship. The "Today" half of M2 already shipped in v0.5 (drawer entry). V1 is
|
||||
therefore feature-complete; only a polish/QA pass remains.
|
||||
|
||||
## v1.0 — First Public Release
|
||||
|
||||
All V1 features shipped, polished, on F-Droid. Read-only calendar.
|
||||
Remaining before v1.0: jump-to-date (M2) and a UI polish/QA pass.
|
||||
Remaining before v1.0: a UI polish/QA pass.
|
||||
|
||||
## v2.0 — Write Support
|
||||
|
||||
|
||||
@@ -5,8 +5,9 @@
|
||||
## Status
|
||||
|
||||
**Milestone:** v0.5 — Calendar filter (M3) + Settings (M4) (complete)
|
||||
**Phase:** All V1 screens and cross-cutting wiring done except jump-to-date
|
||||
(M2), which is deferred to the v1.0 polish pass
|
||||
**Phase:** All V1 screens and cross-cutting wiring done. Jump-to-date (the
|
||||
date-picker half of M2) was cut from scope; V1 is feature-complete and only a
|
||||
polish/QA pass remains before v1.0
|
||||
|
||||
## Progress
|
||||
|
||||
@@ -21,10 +22,9 @@
|
||||
- [x] Event-detail screen (S4) — full-screen, humanized recurrence
|
||||
- [x] Filter sheet (M3) — per-calendar visibility, grouped by account, persisted, applied centrally in the repository
|
||||
- [x] Settings (M4) — appearance (theme, dynamic colour, week start), language (per-app locales), about
|
||||
- [ ] Jump-to-date (M2) — drawer entry still stubbed (deferred to v1.0)
|
||||
- [~] Jump-to-date (M2) — **cut from scope**; "Today" half shipped in v0.5, date-picker dropped
|
||||
|
||||
## Next
|
||||
|
||||
1. Jump-to-date (M2) — date picker from the drawer, reachable on every view
|
||||
2. UI polish / QA pass across all views before v1.0
|
||||
3. F-Droid release of v1.0
|
||||
1. UI polish / QA pass across all views before v1.0
|
||||
2. F-Droid release of v1.0
|
||||
|
||||
Reference in New Issue
Block a user