docs: cut jump-to-date (M2) from V1 scope
The date-picker half of M2 is dropped entirely; the "Today" half already shipped in v0.5. V1 is now feature-complete and only a polish/QA pass remains before v1.0. Updated the living planning docs (ROADMAP, STATE, REQUIREMENTS) and the design spec; corrected the v0.5.0 CHANGELOG note that promised M2 would return in v1.0. Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
This commit is contained in:
@@ -17,7 +17,7 @@ See full design spec: `docs/superpowers/specs/2026-06-08-calendar-app-design.md`
|
|||||||
- [ ] Day view (S3)
|
- [ ] Day view (S3)
|
||||||
- [ ] Event Detail Sheet (S4)
|
- [ ] Event Detail Sheet (S4)
|
||||||
- [ ] Multi-Calendar Filter (M3)
|
- [ ] Multi-Calendar Filter (M3)
|
||||||
- [ ] Today button + Jump-to-Date (M2)
|
- [x] Today button (M2) — shipped v0.5; Jump-to-Date **cut from scope**
|
||||||
- [ ] View-Switcher (M1)
|
- [ ] View-Switcher (M1)
|
||||||
- [ ] Settings screen (M4)
|
- [ ] Settings screen (M4)
|
||||||
- [ ] Empty / no-permission / no-calendars states
|
- [ ] Empty / no-permission / no-calendars states
|
||||||
|
|||||||
@@ -9,16 +9,19 @@
|
|||||||
| v0.3 | Month + Week + Day views, view switcher | complete |
|
| v0.3 | Month + Week + Day views, view switcher | complete |
|
||||||
| v0.4 | Event Detail (S4) + humanized recurrence | complete |
|
| v0.4 | Event Detail (S4) + humanized recurrence | complete |
|
||||||
| v0.5 | Calendar filter (M3) + Settings (M4) | complete |
|
| v0.5 | Calendar filter (M3) + Settings (M4) | complete |
|
||||||
| v1.0 | Polish + jump-to-date (M2), F-Droid release | pending |
|
| v1.0 | Polish pass, F-Droid release | pending |
|
||||||
|
|
||||||
Delivery ran ahead of the original table: Day view (S3) shipped in v0.3 and
|
Delivery ran ahead of the original table: Day view (S3) shipped in v0.3 and
|
||||||
Event Detail (S4) in v0.4, so the Filter/Settings milestone became v0.5.
|
Event Detail (S4) in v0.4, so the Filter/Settings milestone became v0.5.
|
||||||
Jump-to-date (M2) was deferred out of v0.5 and folds into the v1.0 polish pass.
|
|
||||||
|
Jump-to-date (the date-picker half of M2) was **cut from scope** and will not
|
||||||
|
ship. The "Today" half of M2 already shipped in v0.5 (drawer entry). V1 is
|
||||||
|
therefore feature-complete; only a polish/QA pass remains.
|
||||||
|
|
||||||
## v1.0 — First Public Release
|
## v1.0 — First Public Release
|
||||||
|
|
||||||
All V1 features shipped, polished, on F-Droid. Read-only calendar.
|
All V1 features shipped, polished, on F-Droid. Read-only calendar.
|
||||||
Remaining before v1.0: jump-to-date (M2) and a UI polish/QA pass.
|
Remaining before v1.0: a UI polish/QA pass.
|
||||||
|
|
||||||
## v2.0 — Write Support
|
## v2.0 — Write Support
|
||||||
|
|
||||||
|
|||||||
@@ -5,8 +5,9 @@
|
|||||||
## Status
|
## Status
|
||||||
|
|
||||||
**Milestone:** v0.5 — Calendar filter (M3) + Settings (M4) (complete)
|
**Milestone:** v0.5 — Calendar filter (M3) + Settings (M4) (complete)
|
||||||
**Phase:** All V1 screens and cross-cutting wiring done except jump-to-date
|
**Phase:** All V1 screens and cross-cutting wiring done. Jump-to-date (the
|
||||||
(M2), which is deferred to the v1.0 polish pass
|
date-picker half of M2) was cut from scope; V1 is feature-complete and only a
|
||||||
|
polish/QA pass remains before v1.0
|
||||||
|
|
||||||
## Progress
|
## Progress
|
||||||
|
|
||||||
@@ -21,10 +22,9 @@
|
|||||||
- [x] Event-detail screen (S4) — full-screen, humanized recurrence
|
- [x] Event-detail screen (S4) — full-screen, humanized recurrence
|
||||||
- [x] Filter sheet (M3) — per-calendar visibility, grouped by account, persisted, applied centrally in the repository
|
- [x] Filter sheet (M3) — per-calendar visibility, grouped by account, persisted, applied centrally in the repository
|
||||||
- [x] Settings (M4) — appearance (theme, dynamic colour, week start), language (per-app locales), about
|
- [x] Settings (M4) — appearance (theme, dynamic colour, week start), language (per-app locales), about
|
||||||
- [ ] Jump-to-date (M2) — drawer entry still stubbed (deferred to v1.0)
|
- [~] Jump-to-date (M2) — **cut from scope**; "Today" half shipped in v0.5, date-picker dropped
|
||||||
|
|
||||||
## Next
|
## Next
|
||||||
|
|
||||||
1. Jump-to-date (M2) — date picker from the drawer, reachable on every view
|
1. UI polish / QA pass across all views before v1.0
|
||||||
2. UI polish / QA pass across all views before v1.0
|
2. F-Droid release of v1.0
|
||||||
3. F-Droid release of v1.0
|
|
||||||
|
|||||||
@@ -16,7 +16,8 @@ and this project adheres to [Semantic Versioning](https://semver.org/spec/v2.0.0
|
|||||||
separate from the system VISIBLE flag) and applied centrally in the
|
separate from the system VISIBLE flag) and applied centrally in the
|
||||||
repository, so month/week/day re-filter live the moment a switch flips.
|
repository, so month/week/day re-filter live the moment a switch flips.
|
||||||
The drawer was trimmed to just Today, the calendar filter, and Settings
|
The drawer was trimmed to just Today, the calendar filter, and Settings
|
||||||
(the stubbed jump-to-date entry was removed; M2 returns in v1.0)
|
(the stubbed jump-to-date entry was removed; jump-to-date was later cut
|
||||||
|
from scope entirely)
|
||||||
- Settings (M4): a full-screen destination with
|
- Settings (M4): a full-screen destination with
|
||||||
- **Appearance** — theme (System / Light / Dark), Material You dynamic colour
|
- **Appearance** — theme (System / Light / Dark), Material You dynamic colour
|
||||||
(auto-disabled below Android 12), week start (Automatic / Monday / Sunday)
|
(auto-disabled below Android 12), week start (Automatic / Monday / Sunday)
|
||||||
|
|||||||
@@ -27,7 +27,7 @@ von Google Calendar gibt - speziell mit dem 2025er Expressive-Design.
|
|||||||
- 3 Hauptansichten: Monat, Woche, Tag
|
- 3 Hauptansichten: Monat, Woche, Tag
|
||||||
- Event-Detail-Sheet (read-only Detailansicht)
|
- Event-Detail-Sheet (read-only Detailansicht)
|
||||||
- Multi-Kalender-Toggle (Sichtbarkeit pro Kalender)
|
- Multi-Kalender-Toggle (Sichtbarkeit pro Kalender)
|
||||||
- Heute-Button + Jump-to-Date
|
- Heute-Button (Jump-to-Date gestrichen, siehe Out-of-Scope)
|
||||||
- Settings-Screen (Theme, Dynamic Color, Wochenstart, Sprache)
|
- Settings-Screen (Theme, Dynamic Color, Wochenstart, Sprache)
|
||||||
- Permission-Flow für `READ_CALENDAR`
|
- Permission-Flow für `READ_CALENDAR`
|
||||||
- Empty-States und Error-Recovery
|
- Empty-States und Error-Recovery
|
||||||
@@ -35,6 +35,7 @@ von Google Calendar gibt - speziell mit dem 2025er Expressive-Design.
|
|||||||
- Tests + CI ab Tag 1
|
- Tests + CI ab Tag 1
|
||||||
|
|
||||||
### Out-of-Scope (V2+)
|
### Out-of-Scope (V2+)
|
||||||
|
- Jump-to-Date / Datum-Picker (aus V1-Scope gestrichen)
|
||||||
- Event-Create/Edit/Delete (V2)
|
- Event-Create/Edit/Delete (V2)
|
||||||
- Home-Screen-Widget
|
- Home-Screen-Widget
|
||||||
- Volltextsuche
|
- Volltextsuche
|
||||||
@@ -202,9 +203,9 @@ fragt Repository nur für sichtbaren Range an - kein "alle Events der Welt".
|
|||||||
- Immer erreichbar von allen Hauptansichten
|
- Immer erreichbar von allen Hauptansichten
|
||||||
- State persistent (zuletzt aktive Ansicht)
|
- State persistent (zuletzt aktive Ansicht)
|
||||||
|
|
||||||
**M2 - Heute / Springe-zu-Datum**
|
**M2 - Heute**
|
||||||
- Schnell zurück zu "heute"
|
- Schnell zurück zu "heute" (Drawer-Eintrag, ausgeliefert in v0.5)
|
||||||
- Springe zu beliebigem Datum via Datum-Picker
|
- ~~Springe zu beliebigem Datum via Datum-Picker~~ — **gestrichen**, siehe Out-of-Scope
|
||||||
- Erreichbar von allen Hauptansichten
|
- Erreichbar von allen Hauptansichten
|
||||||
|
|
||||||
**M3 - Kalender-Filter (Bottom-Sheet)**
|
**M3 - Kalender-Filter (Bottom-Sheet)**
|
||||||
|
|||||||
Reference in New Issue
Block a user